IP Library Granted Patent US 10,738,763
Granted Patent B2
US 10,738,763 · App. 16/031,618 · Granted Aug 11, 2020

Method and system for controlling the active power output of a wind farm

Inventors: Florian Bode (Northeim, DE); Detlef Drossel (Norderstedt, DE)
Assignee: Nordex Energy GmbH
F03D7/048F03D7/028F03D7/045H02J3/386H02J3/46F03D9/257F05B2270/1033F05B2270/335H02J13/0006H02J2203/20
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,738,763
App. No.
16/031,618
Granted
Aug 11, 2020
Kind
B2
Abstract

A method for controlling an active power output in a wind farm comprises inputting a setpoint of the active power into a ramp and limiting unit to determine an internal active power setpoint. Inputting the internal active power setpoint into a distributing unit configured to calculate a modeled active power setpoint of the wind farm. Determine by a subtraction element, a control difference that is a difference between the modeled active power setpoint and an actual value of the active power output of the wind farm. Determine a controller setpoint variable and calculating an overall setpoint variable from the controller setpoint variable and the feed-forward control variable. Splitting the overall setpoint variable for models of the wind turbines and determining using the wind turbine models the modeled active power setpoint of respective wind turbines depending on a portion of the active power setpoint.

Claims (35)

1. A method for controlling an active power output (P act ) in a wind farm with at least two wind turbines whose power output is each controlled by a wind turbine controller, the method comprising;

inputting a setpoint of an active power (P set , P set,global ) into a ramp and limiting unit to determine an internal active power setpoint (P set );

inputting the internal active power setpoint (P set ) into a distributing unit, wherein the distributing unit is configured to,

split the internal active power setpoint (P set ) into active power setpoints for simulation by individual wind turbines (P simI,1 , P simI,2 , P simI,n ),

receive modeled active power setpoints of individual wind turbines (P simO,1 , P simO,2 , P simO,n ), and

calculate a modeled active power setpoint of the wind farm (P′ set ) from the received active power setpoints of the wind turbines (P simO,1 , P simO,2 , P simO,n );

determining by a subtraction element, a control difference (e) that is a difference between the modeled active power setpoint (P′ set ) and an actual value of the active power output (P act ) of the wind farm;

inputting the control difference into a power controller and determining a controller setpoint variable (u reg );

inputting the internal active power setpoint (P set ) into a feed-forward control unit to determine a feed-forward control variable (u ff );

calculating an overall setpoint variable (u) by summing the controller setpoint variable (u reg ) and the feed-forward control variable (u ff );

splitting the overall setpoint variable (u) for models of the at least two wind turbines contained in the wind farm; and

determining using the models for the at least two wind turbines, the modeled active power setpoint of respective wind turbines (P simO,1 , P simO,2 , P simO,n ) depending on a portion of the active power setpoint (P simI,1 , P simI,2 , P simI,n ) split up for a respective wind turbine model,

wherein the models of the at least two wind turbines are run on respective wind turbine controllers.

2. The method according to claim 1 , wherein the models of the at least two wind turbines process at least one of an operating variable, a parameter, and a state indicator of the respective wind turbine.

3. The method according to claim 1 , wherein behavior of the wind farm is represented by a totality of the models of the at least two wind turbines.

4. The method according to claim 1 , wherein the overall setpoint variable (u) is split into setpoint variables (u WT,1 , u WT,2 , u WT,n ) for the individual wind turbines.

5. The method according to claim 4 , wherein the overall setpoint variable (u) is split up for the individual wind turbines depending on available active power (P avail,1 , P avail,2 , . . . ).

6. The method according to claim 1 , wherein the distributing unit splits up the internal active power setpoint (P set ) depending on at least one of an operating variable, a parameter, and a state indicator of the wind turbine.

7. A wind farm control system comprising:

at least two wind turbines; and

a wind farm controller, wherein a setpoint is applied for the active power (P set , P set,global ) to be output by the wind farm for controlling the at least two wind turbines, the wind farm controller comprising,

a ramp and limiting unit to determine an internal active power setpoint (P set ) from the active power (P set , P set,global ),

a distributing unit configured to,

split internal active power setpoint (P set ) into active power setpoints for individual wind turbines (P simI,1 , P simI,2 , P simI,n ),

receive modeled active power setpoints of individual wind turbines (P simO,1 , P simO,2 , P simO,n ), and

determine a modeled active power setpoint (P′ set ) of the wind farm by summing received active power setpoints of the individual wind turbines (P simO,1 , P simO,2 , P simO,n ),

a subtraction element configured to calculate a control difference (e) from the modeled active power setpoint (P′ set ) of the wind farm and an active power output (P act ) of the wind farm,

a power controller configured to determine a controller setpoint variable (u reg ) from the control difference (e),

a feed-forward control unit configured to calculate a feed-forward control variable (u ff ) independently of operating states of the at least two wind turbines, and

a summation element configured to calculate an overall setpoint variable (u) for the wind farm from the feed-forward control variable (u ff ) and the controller setpoint variable (u reg ),

wherein the at least two wind turbines each have a wind turbine controller configured to run a model of the wind turbine to which the active power setpoint for the wind turbine (P simI ) is applied, and wherein a modeled active power setpoint for the wind turbine (P simO ) is determined and input back into the distributing unit.

8. The wind farm control system according to claim 7 , wherein each of the models of the wind turbines is configured to process at least one of an operating variable, a parameter, and a state indicator of a respective wind turbine.

9. The wind farm control system according to claim 7 , further comprising a setpoint distribution unit that is configured to split up the overall setpoint variable (u) into setpoint variables (u WT,1 , u WT,2 , u WT,n ) for individual wind turbines.

10. The wind farm control system according to claim 9 , wherein the setpoint distribution unit is configured to split up the overall setpoint variable (u) for the individual wind turbines (u WT,1 , u WT,2 ,) depending on available active power (P avail,1 , P avail,2 , ).

11. The wind farm according to claim 9 , wherein the distributing unit is configured to split up the overall setpoint variable (u) depending on at least one of an operating variable, a parameter, and a state indicator of the wind turbine.

Assignments (3)
CORRECTIVE ASSIGNMENT TO CORRECT THE CHANGE OF NAME TO REMOVE PATENT NUMBER 10771765 AND ADD PATENT NUMBER 10711765 PREVIOUSLY RECORDED AT REEL: 055259 FRAME: 0008. ASSIGNOR(S) HEREBY CONFIRMS THE CHANGE OF NAME. Recorded Nov 12, 2021
From: NORDEX ENERGY GMBH
To: NORDEX ENERGY SE & CO. KG
Reel/Frame 058222/0542 →
CHANGE OF NAME Recorded Feb 8, 2021
From: NORDEX ENERGY GMBH
To: NORDEX ENERGY SE & CO. KG
Reel/Frame 055259/0008 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 12, 2019
From: BODE, FLORIAN; DROSSEL, DETLEF
To: NORDEX ENERGY GMBH
Reel/Frame 048310/0483 →
Priority Claims (1)
EP 17180518 · Jul 10, 2017 · regional
Continuity (1)
Related Publication 20190010926A1 · Jan 10, 2019
Cited By (1)
US 12,567,749