IP Library Granted Patent US 10,793,369
Granted Patent B2
US 10,793,369 · App. 16/032,647 · Granted Oct 6, 2020

Conveyor system for autonomous robot

Inventors: Danny Sekich (Loveland, CO); Karl McDowall (Boulder, CO); Joshua Bavari (Boulder, CO); Jonathan McQueen (Boulder, CO); Phillip Walkemeyer (Boulder, CO)
Assignee: A9.com, Inc.
B65G43/00B65G43/08B65G47/34B65G47/503B65G2203/041
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,793,369
App. No.
16/032,647
Granted
Oct 6, 2020
Kind
B2
Abstract

An autonomous robot with a modular conveyor belt moves materials in a warehouse or other industrial environment. Its load cells detect items on its conveyor belt and its cameras detect loading stations with stationary conveyor belts throughout the warehouse. It guides itself to a loading station using visual cues until it is close enough to load or unload items from its conveyor belt. The cart orients itself relative to the stationary conveyor belt based on the conveyor belt's direction of motion and tracks its position using wheel or visual odometry. It unloads by running the conveyor belt, which may be about 1.5 m long, at a speed of about 1 m/s for about 2 seconds. For loading, the cart detects an item on a stationary conveyor belt using a camera, positions itself next to the stationary conveyor belt, then triggers the stationary conveyor belt and its own conveyor belt to load the item.

Claims (59)

1. A method of loading or unloading a conveyor belt on an autonomous cart, the method comprising:

detecting, by a visual navigation system of the autonomous cart, a loading station;

moving, by the autonomous cart, to a position next to the loading station;

detecting, by the visual navigation system, that the autonomous cart is positioned to be loaded or unloaded at the loading station;

determining a desired destination of an item with respect to the conveyor belt;

determining a speed and a length of time for which to actuate the conveyor belt based at least in part on the desired destination; and

in response to detecting that the autonomous cart is positioned to be loaded or unloaded at the loading station, actuating the conveyor belt to load or unload the autonomous cart at the speed for the length of time.

2. The method of claim 1 , wherein moving to a position next to the loading station comprises orienting the autonomous cart with respect to the loading station based on a direction of movement of the conveyor belt.

3. The method of claim 1 , wherein moving to a position next to the loading station comprises moving an edge of the conveyor belt to within about 5 cm of another conveyor belt at the loading station.

4. The method of claim 1 , wherein detecting that the autonomous cart is positioned to be loaded or unloaded comprises making a visual odometry measurement with the visual navigation system.

5. The method of claim 1 , wherein the speed is about 0.5 meters/second to about 1.5 meters/second and the length of time is from about 2 seconds to about 4 seconds.

6. The method of claim 1 , wherein the conveyor belt is a first conveyor belt, and further comprising:

moving the item between the first conveyor belt and a second conveyor belt at the loading station, the second conveyor belt operating at the predetermined speed.

7. The method of claim 1 , further comprising:

detecting, by a load cell of the autonomous cart, placement of a mass on the conveyor belt.

8. The method of claim 1 , further comprising:

detecting, by a load cell of the autonomous cart, displacement of a mass from the conveyor belt.

9. The method of claim 1 , further comprising:

detecting, by a load cell of the autonomous cart, a partially loaded item on the conveyor belt; and

issuing an alert to user about the partially loaded item.

10. The method of claim 1 , further comprising:

detecting, by the visual navigation system, a height of the loading station.

11. The method of claim 1 , further comprising:

adjusting the conveyor belt based on the height of the loading station.

12. The method of claim 1 , further comprising:

detecting, by the visual navigation system, the item at the loading station for loading onto the conveyor belt.

13. The method of claim 1 , further comprising:

detecting, by the visual navigation system, if the loading station can receive the item from the conveyor belt.

14. The method of claim 1 , further comprising:

in response to detecting that the autonomous cart is positioned to be loaded or unloaded at the loading station, actuating at least one conveyor belt at the loading station to load or unload the conveyor belt on the autonomous cart.

15. The method of claim 14 , wherein the at least one conveyor belt has a length equal to a length of the conveyor belt on the autonomous cart.

16. An autonomous robot comprising:

at least one camera to collect imagery of an area containing a loading station;

a processor, operably coupled to the at least one camera, to identify the loading station in the imagery collected by the at least one camera and to plan a path to the loading station based at least in part on the imagery collected by the at least one camera;

a locomotive system, operably coupled to the processor, to move the autonomous robot along the path to the loading station; and

a conveyor belt, operably coupled to the processor, to load or unload an item at the loading station for a predetermined length of time at a predetermined speed, wherein the predetermined length of time and the predetermined speed are determined based at least in part on a desired destination of an item with respect to the conveyor belt.

17. The autonomous robot of claim 16 , wherein the processor is configured to identify the item for pickup at the loading station based on the imagery collected by the at least one camera.

18. The autonomous robot of claim 16 , wherein the processor is configured to plan the path based at least in part on a direction of motion of the conveyor belt and on a desired orientation of the conveyor belt with respect to the loading station.

19. The autonomous robot of claim 16 , wherein the conveyor belt is configured to load or unload the item by operating at the predetermined speed for the predetermined length of time.

20. The autonomous robot of claim 16 , further comprising:

at least one load cell, operably coupled to the processor, to make a measurement of force exerted by an item on the conveyor belt, and

wherein the processor is configured to determine a presence of the item on the conveyor based on the measurement made by the at least one load cell.

21. A method of loading a first conveyor belt on an autonomous cart with an item on a second conveyor belt, the method comprising:

detecting, by a visual navigation system of the autonomous cart, the item on the second conveyor belt;

orienting the autonomous cart with respect to the second conveyor belt based on a direction of movement of the first conveyor belt;

positioning, by the autonomous cart, the first conveyor belt within 5 cm of the second conveyor belt;

detecting, by an odometry measurement, that the first conveyor belt is within 5 cm of the second conveyor belt;

determining a desired destination of an item with respect to the conveyor belt;

determining a length of time for which to actuate the conveyor belt based at least in part on the desired destination; and

in response to detecting that the first conveyor belt is within 5 cm of the second conveyor belt, actuating the first conveyor belt and the second conveyor belt at a speed of about 1.5 m/s for the length of time to receive the item on the second conveyor belt.

22. A method of moving an item from a first conveyor belt on an autonomous cart to a second conveyor belt, the method comprising:

sensing, by a load cell of the autonomous cart, the item on the first conveyor belt;

locating, by a visual navigation system of the autonomous cart, the second conveyor belt;

orienting the autonomous cart with respect to the second conveyor belt based on a direction of movement of the first conveyor belt;

positioning, by the autonomous cart, the first conveyor belt within 5 cm of the second conveyor belt;

detecting, by an odometry measurement, that the first conveyor belt is within 5 cm of the second conveyor belt;

determining a desired destination of an item with respect to the conveyor belt;

determining a length of time for which to actuate the conveyor belt based at least in part on the desired destination, wherein the length of time is about 2 seconds; and

in response to detecting that the first conveyor belt is within 5 cm of the second conveyor belt, actuating the first conveyor belt at a speed of about 1 meter per second for about 2 seconds to move the item from the first conveyor belt to the second conveyor belt.

Assignments (4)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 13, 2024
From: A9.COM, INC.
To: AMAZON TECHNOLOGIES, INC.
Reel/Frame 069167/0493 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 20, 2019
From: CANVAS TECHNOLOGY LLC
To: A9.COM, INC.
Reel/Frame 049229/0207 →
CHANGE OF NAME Recorded May 15, 2019
From: CANVAS TECHNOLOGY, INC.
To: CANVAS TECHNOLOGY LLC
Reel/Frame 049194/0191 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 5, 2018
From: SEKICH, DANNY; MCDOWALL, KARL; BAVARI, JOSHUA; MCQUEEN, JONATHAN; WALKEMEYER, PHILLIP
To: CANVAS TECHNOLOGY, INC.
Reel/Frame 046786/0815 →
Continuity (2)
Provisional Application 62531468 · Jul 12, 2017
Related Publication 20190135551A1 · May 9, 2019