IP Library Granted Patent US 10,727,691
Granted Patent B2
US 10,727,691 · App. 16/034,556 · Granted Jul 28, 2020

Methods and systems for adaptive load control

Inventor: Mikko Niemi (Austin, TX)
Assignee: Landis+Gyr Innovations, Inc.
H02J13/0006F24F11/88G05B13/021H02J3/14H02J3/36
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,727,691
App. No.
16/034,556
Granted
Jul 28, 2020
Kind
B2
Abstract

An adaptive load control system includes: a load monitoring and control device configured to monitor operating conditions of a load connected to an electrical power grid, and transmit load operating condition data; and a head-end load controller configured to: receive the load operating condition data; obtain data from externals sources about external factors that influence the load operating conditions; and generate load control profiles based on the data from external sources that control a duty cycle for the load during a scheduled load control event. The load control profiles include instructions to increase the off time of the duty cycle for the load when the scheduled load control event overlaps a normal off time of the load, and one of the load control profiles is selected based on a comparison of the data from external sources and a forecast of external conditions during the scheduled load control event.

Claims (32)

1. An adaptive load control system, comprising:

a load monitoring and control device including a processor, the load monitoring and control device configured to monitor operating conditions of a load connected to an electrical power grid, and transmit load operating condition data across a network; and

a head-end load controller located remotely from the load monitoring and control device and configured to:

receive the load operating condition data across the network;

obtain data from external sources about external factors that influence load operating conditions;

generate one or more load control profiles based at least in part on the data from external sources that control a duty cycle for the load during a scheduled load control event; and

transmit the one or more load control profiles to the load monitoring and control device across the network,

wherein the one or more load control profiles include instructions to increase off time of the duty cycle for the load when the scheduled load control event overlaps a normal off time of the load, and

wherein one of the one or more load control profiles is selected by the load monitoring and control device according to an instruction received from the head-end load controller, the instruction based at least in part on a comparison of the data from external sources used to create the selected load control profile and a forecast of external conditions during the scheduled load control event.

2. The system of claim 1 , wherein the head-end load controller is configured to increase the off time of the duty cycle based on the normal off time of the load and a specified cycle value,

wherein the cycle value is a specified value by which the normal off time is increased.

3. The system of claim 1 , wherein the head-end load controller is configured to generate an individual run time profile for each specified load.

4. The system of claim 1 , wherein the head-end load controller is configured to generate the load control profile for the load based at least in part on a run time profile.

5. The system of claim 1 , wherein the head-end load controller is configured to generate the load control profile based at least in part based on a run time profile, the data about external factors, and anticipated loading on the electrical power grid.

6. The system of claim 1 , wherein the load monitoring and control device monitors operating conditions of the load for a specified period of time during normal operation of the load.

7. The system of claim 6 , wherein the specified period of time for monitoring the load is shorter than a duration of a load control event.

8. The system of claim 1 , wherein the load control profiles transmitted by the head-end controller are stored in a memory of the load monitoring and control device.

9. A method for adaptively controlling a load, the method comprising:

monitoring, by a load monitoring and control device, operating conditions of a load connected to an electrical power grid to obtain operating condition data for the load;

receiving, by a head-end load controller, the operating condition data across a network and obtaining, by the head-end load controller, data from external sources about external factors that influence the load operating conditions;

generating, by the head-end load controller, one or more load control profiles based at least in part on the received operating condition data and the data from external sources, the one or more load control profiles configured to control a duty cycle for the load during a scheduled load control event;

transmitting, by the head-end load controller, the one or more load control profiles to the load monitoring and control device across the network; and

selecting, by the load monitoring and control device, one of the one or more load control profiles according to an instruction received from the head-end load controller, the instruction based at least in part on a comparison of the data from external sources used to create the selected load control profile and a forecast of external conditions during the scheduled load control event,

wherein the one or more load control profiles includes instructions to increase off time of the duty cycle for the load when the scheduled load control event overlaps a normal off time of the load.

10. The method of claim 9 , further comprising increasing the off time of the duty cycle based on the normal off time of the load and a specified cycle value,

wherein the cycle value is a specified value by which the normal off time is increased.

11. The method of claim 9 , further comprising generating an individual run time profile for each specified load.

12. The method of claim 9 , further comprising generating the load control profile for the load based at least in part on a run time profile.

13. The method of claim 9 , further comprising generating the load control profile based at least in part based on a run time profile, the data about external factors, and anticipated loading on the electrical power grid.

14. The method of claim 9 , further comprising monitoring the operating conditions of the load for a specified period of time during normal operation of the load.

15. The method of claim 14 , wherein the specified period of time for monitoring the load is shorter than a duration of a load control event.

16. The method of claim 9 , further comprising storing, in a memory of the load monitoring and control device, the load control profiles transmitted by the head-end controller.

Assignments (2)
MERGER Recorded Oct 27, 2023
From: LANDIS+GYR INNOVATIONS, INC.
To: LANDIS+GYR TECHNOLOGY, INC.
Reel/Frame 065373/0069 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 24, 2018
From: NIEMI, MIKKO
To: LANDIS+GYR INNOVATIONS, INC.
Reel/Frame 046443/0350 →