IP Library Granted Patent US 10,450,046
Granted Patent B1
US 10,450,046 · App. 16/043,515 · Granted Oct 22, 2019

Separation apparatus for separating a first object from a second object

Inventors: Michael Hall-Snyder (Palo Alto, CA); Kyle Brookes (Redwood City, CA)
Assignee: Loon LLC
B64B1/46
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,450,046
App. No.
16/043,515
Granted
Oct 22, 2019
Kind
B1
Abstract

Aspects of the disclosure relate to terminating flight of a balloon that may include separating a connection between a balloon envelope and a payload of the balloon. In one example, a payload separation apparatus includes a first shaft configured to attach to the envelope, a second shaft configured to attach to the payload, a pair of arms, and a bracket arranged to secure the pair of arms to the first shaft. In another example, a system includes a flight termination assembly having a cutting edge configured to cut an opening in the envelope and a payload separation apparatus. The apparatus includes a first shaft configured to attach to the envelope, a second shaft configured to attach to the payload, a pair of arms, and a bracket configured to secure the pair of arms to the first shaft. The system also includes a controller configured to activate the cutting edge.

Claims (48)

1. A system comprising a separation apparatus for separating a connection between a first object and a second object, the separation apparatus comprising:

a first shaft configured to attach to the first object, the first shaft including two openings;

a second shaft configured to attach to the second object, the second shaft including two slots arranged in line with the two openings of the first shaft;

a first pair of arms;

a bracket arranged to secure the pair of arms to the first shaft; and

a bolt arranged through the two openings of the first shaft and the two slots of the second shaft.

2. The system of claim 1 , wherein each arm of the pair of arms includes an opening at one end and the bolt is further arranged through the openings in the arms.

3. A system comprising a separation apparatus for separating a connection between a first object and a second object, the first shaft including two slots;

a first shaft configured to attach to the first object, the first shaft including two slots;

a second shaft including two openings arranged in line with the two slots of the first shaft;

a first pair of arms;

a bracket arranged to secure the pair of arms to the first shaft; and

a pair of projections on the second shaft arranged through the two openings of the second shaft and the two slots of the first shaft.

4. The system of claim 3 , wherein each arm of the pair of arms includes a finger at one end, and each of the fingers are arranged to sit around at least a portion of one of the projections of the pair of projections.

5. The system of claim 1 , wherein the bracket includes two openings, each of the arms include an opening at one end, and the system further comprises a bolt arranged through the two openings of the bracket and the openings in the arms, the bolt securing the arms to the bracket.

6. The system of claim 1 , wherein the bracket includes two arms and a base which form an opening and the first shaft is arranged within the opening formed by the two arms and the base.

7. The system of claim 6 , wherein each arm of the bracket includes a corresponding opening.

8. The system of claim 7 , further comprises a pin arranged through the corresponding openings of the arms of the bracket.

9. The system of claim 1 , further comprising a pin configured to break and release the first object from the second object.

10. The system of claim 9 , further comprising a cutting device configured to cut the pin and release the bracket from the first shaft.

11. The system of claim 9 , further comprising a squib arranged around the pin, the squib housing a cutting device.

12. The system of claim 9 , wherein the bracket includes two arms and each arm of the bracket includes a corresponding opening through which the pin is arranged.

13. The system of claim 1 , further comprising the first object.

14. The system of claim 13 , further comprising the second object.

15. The system of claim 1 , wherein the first shaft, second shaft, and first pair of arms comprise aluminum.

16. The system of claim 1 , wherein the first shaft, second shaft, and first pair of arms comprise an aluminum alloy.

17. The system of claim 1 , wherein the bracket comprises stainless steel.

18. The system of claim 1 , wherein the bracket and the first pair of arms are configured to temporarily secure the first shaft to the second shaft.

19. The system of claim 18 , further comprising a squib having a receiver configured to activate the squib and release the first shaft from the second shaft upon receipt of an electrical signal.

20. The system of claim 1 , wherein the second shaft includes two openings, the first shaft includes two slots arranged in line with the two openings, and the system further includes a pair of projections on the second shaft arranged through the two openings of the second shaft and the two slots of the first shaft.

21. The system of claim 3 , wherein each arm of the pair of arms includes an opening at one end and the system further comprises a bolt arranged through the openings in the arms.

22. The system of claim 3 , wherein each arm of the pair of arms includes a finger at one end, and each of the fingers are arranged to sit around at least a portion of one of the projections of the pair of projections.

23. The system of claim 3 , wherein the bracket includes two openings, each of the arms include an opening at one end, and the system further comprises a bolt arranged through the two openings of the bracket and the openings in the arms, the bolt securing the arms to the bracket.

24. The system of claim 3 , wherein the bracket includes two arms and a base which form an opening and the first shaft is arranged within the opening formed by the two arms and the base.

25. The system of claim 24 , wherein each arm of the bracket includes a corresponding opening.

26. The system of claim 25 , further comprises a pin arranged through the corresponding openings of the arms of the bracket.

27. The system of claim 3 , further comprising a pin configured to break and release the first object from the second object.

28. The system of claim 27 , further comprising a cutting device configured to cut the pin and release the bracket from the first shaft.

29. The system of claim 27 , further comprising a squib arranged around the pin, the squib housing a cutting device.

30. The system of claim 27 , wherein the bracket includes two arms and each arm of the bracket includes a corresponding opening through which the pin is arranged.

31. The system of claim 3 , further comprising the first object.

32. The system of claim 31 , further comprising the second object.

33. The system of claim 3 , wherein the first shaft, second shaft, and first pair of arms comprise aluminum.

34. The system of claim 3 , wherein the first shaft, second shaft, and first pair of arms comprise an aluminum alloy.

35. The system of claim 3 , wherein the bracket comprises stainless steel.

36. The system of claim 3 , wherein the bracket and the first pair of arms are configured to temporarily secure the first shaft to the second shaft.

37. The system of claim 36 , further comprising a squib having a receiver configured to activate the squib and release the first shaft from the second shaft upon receipt of an electrical signal.

38. The system of claim 14 , wherein the first object is a payload and the second object is a balloon envelope.

Assignments (6)
MERGER Recorded Oct 20, 2022
From: AEROSTAR INTERNATIONAL, INC.
To: AEROSTAR INTERNATIONAL, LLC
Reel/Frame 061733/0285 →
CORRECTIVE ASSIGNMENT TO CORRECT THE STATE OF THE ASSIGNEE FROM MINNESOTA TO SOUTH DAKOTA AS PREVIOUSLY RECORDED AT REEL: 056282 FRAME: 0458. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT. Recorded Jun 6, 2022
From: LOON LLC
To: AEROSTAR INTERNATIONAL, INC.
Reel/Frame 061521/0291 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 18, 2021
From: LOON LLC
To: AEROSTAR INTERNATIONAL, INC.
Reel/Frame 056282/0458 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 28, 2018
From: X DEVELOPMENT LLC
To: LOON LLC
Reel/Frame 047656/0883 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 10, 2018
From: GOOGLE INC.
To: X DEVELOPMENT LLC
Reel/Frame 046761/0627 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 24, 2018
From: HALL-SNYDER, MICHAEL; BROOKES, KYLE
To: GOOGLE INC.
Reel/Frame 046444/0264 →