IP Library Granted Patent US 10,908,198
Granted Patent B2
US 10,908,198 · App. 16/055,713 · Granted Feb 2, 2021

Determining meter phase using interval voltage measurements

Inventors: Soorya Kuloor (Cary, NC); Kelvin Proctor (Orange, AU); Chethana Kuloor (Cary, NC); Sravan Buggaveeti (Morrisville, NC); Jack Dangar (Glebe, AU)
Assignee: Landis+Gyr Innovations, Inc.
G01R21/1331G01R19/2513G01R22/063G01R31/67G06Q50/06G01D4/004
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,908,198
App. No.
16/055,713
Granted
Feb 2, 2021
Kind
B2
Abstract

A method for determining the phase of an electric meter includes: selecting a population of electric meters; selecting a historical time range based at least in part on the selected population of electric meters; selecting an interval period; creating profiles for each electric meter in the selected population of electric meters based on the voltage measurements over one or more interval periods; calculating a correlation coefficient matrix based on the profiles; clustering the selected population of electric meters into a plurality of clusters; and determining a phase of each cluster of the plurality of clusters.

Claims (48)

1. A method for determining a phase of an electric meter, the method comprising:

selecting a population of electric meters;

selecting a historical time range based at least in part on the selected population of electric meters;

selecting an interval period;

creating profiles for each electric meter in the selected population of electric meters based on voltage measurements over one or more interval periods;

calculating a correlation coefficient matrix based on the profiles;

clustering the selected population of electric meters into a plurality of clusters; and

determining a phase of each cluster of the plurality of clusters based on the calculating of the correlation coefficient matrix.

2. The method of claim 1 , wherein the population of electric meters is selected as a plurality of electric meters connected to a common voltage source.

3. The method of claim 2 , wherein the common voltage source is a specified distribution transformer.

4. The method of claim 2 , wherein the common voltage source is a specified feeder circuit.

5. The method of claim 1 , wherein the profiles created for each electric meter are voltage profiles.

6. The method of claim 1 , wherein the profiles created for each electric meter are voltage change profiles.

7. The method of claim 1 , wherein the clustering comprises associating each electric meter with more than one cluster.

8. The method of claim 7 , further comprising:

calculating confidence factors for each electric meter in the selected population of electric meters,

wherein the confidence factors indicate a level of confidence that an electric meter belongs in each cluster with which it is associated.

9. The method of claim 8 , further comprising determining one cluster of the plurality of clusters for which each electric meter has a highest confidence factor, and

allocating each electric meter to the cluster for which the electric meter has the highest confidence factor.

10. The method of claim 9 , further comprising:

determining a phase code of an electric meter having a highest confidence factor in the cluster; and

assigning the phase code to each electric meter allocated to the cluster.

11. A system for determining a phase of an electric meter, the system comprising:

an electric meter;

a storage device; and

a head-end controller configured to communicate with the storage device and the electric meter, wherein the head-end controller is configured to:

select a population of electric meters;

select a historical time range based at least in part on the selected population of electric meters;

select an interval period;

measure voltage during a plurality of interval periods for each electric meter in the selected population of electric meters;

create profiles for each electric meter in the selected population of electric meters based on the voltage measurements over one or more interval periods;

calculate a correlation coefficient matrix based on the profiles;

cluster the selected population of electric meters into a plurality of clusters; and

determine a phase of each cluster of the plurality of clusters based on calculating the correlation coefficient matrix.

12. The system of claim 11 , wherein the head-end controller is configured to select the population of electric meters as a plurality of electric meters connected to a common voltage source.

13. The system of claim 12 , wherein the head-end controller is configured to select the population of electric meters as a plurality of electric meters connected to a specified distribution transformer as a common voltage source.

14. The system of claim 12 , wherein the head-end controller is configured to select the population of electric meters as a plurality of electric meters connected to a specified feeder circuit as a common voltage source.

15. The system of claim 11 , wherein the profiles created for each electric meter are voltage profiles.

16. The system of claim 11 , wherein the profiles created for each electric meter are voltage change profiles.

17. The system of claim 11 , wherein the head-end controller is configured to associate each electric meter with more than one cluster.

18. The system of claim 17 , wherein the head-end controller is configured to calculate confidence factors for each electric meter in the selected population of electric meters,

wherein the confidence factors indicate a level of confidence that an electric meter belongs in each cluster with which it is associated.

19. The system of claim 18 , wherein the head-end controller is configured to:

determine one cluster of the plurality of clusters for which each electric meter has a highest confidence factor, and

allocate each electric meter to the cluster for which the electric meter has the highest confidence factor.

20. The system of claim 19 , wherein the head-end controller is configured to:

determine a phase code of an electric meter having the highest confidence factor in the cluster; and

assign the phase code to each electric meter allocated to the cluster.

Assignments (2)
MERGER Recorded Oct 27, 2023
From: LANDIS+GYR INNOVATIONS, INC.
To: LANDIS+GYR TECHNOLOGY, INC.
Reel/Frame 065383/0120 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 10, 2020
From: KULOOR, SOORYA; PROCTOR, KELVIN; KULOOR, CHETHANA; BUGGAVEETI, SRAVAN; DANGAR, JACK
To: LANDIS+GYR INNOVATIONS, INC.
Reel/Frame 053171/0251 →