IP Library Granted Patent US 10,416,209
Granted Patent B2
US 10,416,209 · App. 16/075,858 · Granted Sep 17, 2019

Method and system for measuring power loss in a power transformer

Inventors: Nilanga Abeywickrama (Västerås, SE); Svante Karlsson (Solna, SE); Tord Bengtsson (Västerås, SE)
Assignee: ABB Schweiz AG
G01R21/1331G01R19/2513G01R21/133G01R31/027G01R29/20
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,416,209
App. No.
16/075,858
Granted
Sep 17, 2019
Kind
B2
Abstract

A system and a method for determining the power loss of a transformer. The method includes measuring voltage and current at the primary side of the transformer, calculating input power by multiplying the measured current and voltage on the primary side of the transformer; measuring voltage and current at the secondary side of the transformer, calculate a nominal error ratio, calculating output power by multiplying the measured current and voltage on the secondary side of the transformer. The method further involves calculating a first corrected power loss by means of multiplying the input power with the nominal error ratio and subtract the output power.

Claims (46)

1. A method for determining power loss in a transformer, comprising:

measuring voltage and current at a primary side of the transformer;

calculating input power by multiplying the measured current and voltage on the primary side of the transformer;

measuring voltage and current at a secondary side of the transformer;

calculating output power by multiplying the measured current and voltage on the secondary side of the transformer;

calculating a nominal error ratio;

calculating a first corrected power loss by means of multiplying the input power with a first correction factor which is the complex conjugate of the nominal error ratio and subtract the output power;

wherein the nominal error ratio n ˜ /n is:

n ˜ /n =(1+ε IL )/(1+ε IH )

where ε IL is a complex number representing the error in the current measurement on the secondary side of the transformer, and ε IH is a complex number representing the error in the current measurement on the primary side of the transformer.

2. The method according to claim 1 , further including:

calculating a voltage error ratio; and

wherein the calculation of the corrected power loss further involves multiplying the output power with the voltage error ratio.

3. The method according to claim 2 , wherein the voltage error ratio is:

( V ˜ H /V ˜ L )/( V H /V L )=(1+ε VH )/(1+ε VL )

where ε VL is a complex number representing the error in the voltage measurement on the secondary side of the transformer, and ε VH is a complex number representing the error in the voltage measurement on the primary side of the transformer.

4. A system for determining power loss in a transformer, including:

an input voltage measurement apparatus and an input current measurement apparatus configured to be connected to a primary winding of a transformer( 100 ), and

an output current measurement apparatus and an output voltage measurement apparatus configured to be connected to a secondary winding of the transformer;

a calculation device configured to be connected to the input current measurement apparatus, the input voltage measurement apparatus, the output current measurement apparatus, and the output voltage measurement apparatus, the calculation device is configured to receive information about each measurement, which includes measured voltages and currents, wherein the calculation device is configured to:

calculate the input power by multiplying the measured current and voltage of the primary side of the transformer;

calculate a nominal error ratio;

calculate the output power by multiplying the measured output current and output voltage on the secondary side of the transformer;

calculate a first corrected power loss by means of multiplying the input power with a first correction factor which is the complex conjugate of the nominal error ratio and subtract the output power,

wherein the calculation device is configured to calculate the nominal error ratio as:

n ˜ /n =(1+ε IL )/(1+ε IH )

where ε IL is a complex number representing the error in the current measurement on the secondary side of the transformer, and ε IH is a complex number representing the error in the current measurement on the primary side of the transformer.

5. The system according to claim 4 , wherein the calculation device further is configured to:

calculate a voltage error ratio; and

wherein the calculation of the corrected power loss further involves multiplying the output power with the voltage error ratio.

6. The system according to claim 5 , wherein the calculation device further is configured to calculate the voltage error ratio as:

( V ˜ H /V ˜ L )/( V H /V L )=(1+ε VH )/(1+ε VL )

where ε VL is a complex number representing the error in the voltage measurement on the secondary side of the transformer, and ε VH is a complex number representing the error in the voltage measurement on the primary side of the transformer.

7. A non-transitory computer readable media containing instructions for a processor, such that when the instructions are executed by the processor, the processor performs a method for determining power loss in a transformer, the method including:

measuring voltage and current at a primary side of the transformer;

calculating input power by multiplying the measured current and voltage on the primary side of the transformer;

measuring voltage and current at a secondary side of the transformer;

calculating output power by multiplying the measured current and voltage on the secondary side of the transformer;

calculating a nominal error ratio;

calculating a first corrected power loss by means of multiplying the input power with a first correction factor which is the complex conjugate of the nominal error ratio and subtract the output power;

wherein the nominal error ratio n ˜ /n is:

n ˜ /n =(1+ε IL )/(1+ε IH )

where ε IL is a complex number representing the error in the current measurement on the secondary side of the transformer, and ε IH is a complex number representing the error in the current measurement on the primary side of the transformer.

8. The method according to claim 1 , further including: using the first corrected power loss to monitor the transformer and to detect a problem or malfunction in the transformer.

9. The system according to claim 4 , wherein the calculation device detects a problem or malfunction in the transformer based on the first corrected power loss.

10. The non-transitory computer readable media according to claim 7 , wherein the processor detects a problem or malfunction in the transformer based on the first corrected power loss.

Assignments (4)
MERGER Recorded Nov 13, 2023
From: HITACHI ENERGY SWITZERLAND AG
To: HITACHI ENERGY LTD
Reel/Frame 065549/0576 →
CHANGE OF NAME Recorded Dec 31, 2021
From: ABB POWER GRIDS SWITZERLAND AG
To: HITACHI ENERGY SWITZERLAND AG
Reel/Frame 058666/0540 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 6, 2020
From: ABB SCHWEIZ AG
To: ABB POWER GRIDS SWITZERLAND AG
Reel/Frame 052916/0001 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 9, 2018
From: ABEYWICKRAMA, NILANGA; KARLSSON, SVANTE; BENGTSSON, TORD
To: ABB SCHWEIZ AG
Reel/Frame 046595/0208 →
Priority Claims (1)
EP 16156395 · Feb 18, 2016 · regional
Continuity (1)
Related Publication 20190041437A1 · Feb 7, 2019