IP Library Granted Patent US 11,172,389
Granted Patent B2
US 11,172,389 · App. 16/078,497 · Granted Nov 9, 2021

Measurement gap configuration

Inventors: Candy Yiu (Portland, OR); Wenting Chang (Beijing, CN); Yuan Zhu (Beijing, CN); Yujian Zhang (Beijing, CN); Yushu Zhang (Beijing, CN); Yang Tang (San Jose, CA); Rui Huang (Beijing, CN)
Assignee: INTEL CORPORATION
H04W24/10H04L41/0806H04W16/28H04W76/27H04W76/28
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,172,389
App. No.
16/078,497
Granted
Nov 9, 2021
Kind
B2
Abstract

Apparatus, systems, and methods for measurement gap configuration in communication systems are described.

Claims (22)

1. An apparatus of an evolved NodeB (eNB) comprising baseband circuitry including one or more processors to:

configure, via a MeasGapConfig information element (IE) of a radio resource control (RRC) Connection Reconfiguration message, a first measurement gap and a second measurement gap for intra-frequency measurement in a communication channel between at least two of a plurality of transmission points (TPs) of a communication network and a user equipment (UE), wherein the MeasGapConfig IE indicates a gap offset parameter (gapOffset) comprising a gap pattern identifier (ID) and a measurement gap repetition period (MGRP), and wherein the first measurement gap of a first length is assigned to a first group of asynchronous transmission points and the second measurement gap of a second length is assigned to a second group of asynchronous transmission points, and the first length is different than the second length, wherein the first measurement gap is of sufficient duration to accommodate both synchronous and asynchronous transmission points (TPs) for the UE to perform downlink (Rx) measurements from the plurality of TPs in a single first measurement gap, wherein a number of sub-gaps, N, is configured by higher layer signaling through a MeasGapConfig-Rxx information element; and

generate an instruction to cease transmission and reception by the eNB for a predetermined period of time during the first measurement gap and the second measurement gap.

2. The apparatus of an eNB of claim 1 , wherein the one or more processors configures the plurality of transmission points (TPs) to operate in a synchronous fashion and the eNB configures the plurality of TPs to share a single measurement gap time slot.

3. The apparatus of an eNB of claim 1 , wherein the one or more processors configures the plurality of transmission points (TPs) to operate in an asynchronous fashion and the eNB configures the plurality of TPs to utilize measurement gaps which reside in different time slots.

4. The apparatus of an eNB of claim 1 , wherein the number, N, of sub-gaps are spread equally in time through the first measurement gap.

5. The apparatus of an eNB of claim 1 , wherein the sub-gaps are related to a specific transmit beam.

6. The apparatus of an eNB of claim 1 , further comprising circuitry to transmit the first measurement gap and the second measurement gap to the plurality of transmission points (TPs).

7. The apparatus of an eNB of claim 6 , wherein the eNB transmits the first measurement gap and the second measurement gap to the plurality of transmission points (TPs) using higher layer radio resource control (RRC) signaling.

8. The apparatus of an eNB of claim 1 , further comprising transmit circuitry to transmit a plurality of transmit beams, wherein each transmit beam is associated with a beam reference signal identifier (BRS-ID).

9. The apparatus of an eNB of claim 8 , wherein the one or more processors are configured to include the BRS-ID in a measurement report.

10. A non-transitory machine-readable medium comprising instructions which, when executed by a processor of an evolved NodeB (eNB) in a communication network comprising a plurality of transmission points (TPs), configure the processor to:

configure, via a MeasGapConfig information element (IE) of a radio resource control (RRC) Connection Reconfiguration message, a first measurement gap and a second measurement gap for intra-frequency measurement in a communication channel between at least two of a plurality of transmission points (TPs) of a communication network and a user equipment (UE), wherein the MeasGapConfig IE indicates a gap offset parameter (gapOffset) comprising a gap pattern identifier (ID) and a measurement gap repetition period (MGRP), and wherein the first measurement gap of a first length is assigned to a first group of asynchronous transmission points and the second measurement gap of a second length is assigned to a second group of asynchronous transmission points, and the first length is different than the second length, wherein the first measurement gap is of sufficient duration to accommodate both synchronous and asynchronous transmission points (TPs) for the UE to perform downlink (Rx) measurements from the plurality of TPs in a single first measurement gap, wherein the number of sub-gaps, N, is configured by higher layer signaling through the MeasGapConfig-Rxx information element; and

generate an instruction to cease transmission and reception by the eNB for a predetermined period of time during the first measurement gap and the second measurement gap.

11. The non-transitory machine-readable medium of claim 10 , wherein the logic instructions configure the processor to configure the plurality of transmission points (TPs) to operate in a synchronous fashion and the eNB configures the plurality of TPs to share a single measurement gap time slot.

12. The non-transitory machine-readable medium of claim 10 , wherein the logic instructions configure the processor to configure the plurality of transmission points (TPs) to operate in an asynchronous fashion and the eNB configures the plurality of TPs to utilize measurement gaps which reside in different time slots.

13. The non-transitory machine-readable medium of claim 10 , wherein the number, N, of sub-gaps are spread equally in time through the first measurement gap.

14. The non-transitory machine-readable medium of claim 10 , wherein the sub-gaps are related to a specific transmit beam.

15. The non-transitory machine-readable medium of claim 10 , wherein the instructions configure the processor to transmit the first measurement gap and the second measurement gap to the plurality of transmission points (TPs).

16. The non-transitory machine-readable medium of claim 15 , wherein the instructions configure the processor to configure the eNB to transmit the first measurement gap and the second measurement gap to the plurality of transmission points (TPs) using higher layer radio resource control (RRC) signaling.

17. The non-transitory machine-readable medium of claim 10 , wherein the instructions configure the processor to transmit a plurality of transmit beams, wherein each transmit beam is associated with a beam reference signal identifier (BRS-ID).

18. The machine-readable medium of claim 17 , wherein the instructions configure the processor to include the BRS-ID in a measurement report.

Assignments (4)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 17, 2021
From: HUANG, RUI
To: INTEL CORPORATION
Reel/Frame 057206/0530 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 3, 2021
From: INTEL IP CORPORATION
To: INTEL CORPORATION
Reel/Frame 057061/0001 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 9, 2021
From: INTEL IP CORPORATION
To: INTEL CORPORATION
Reel/Frame 057254/0415 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 1, 2018
From: YIU, CANDY; CHANG, WENTING; ZHU, YUAN; ZHANG, YUJIAN; ZHANG, YUSHU; TANG, YANG
To: INTEL IP CORPORATION
Reel/Frame 047388/0393 →
Cited By (1)
US 12,532,209