IP Library Granted Patent US 11,097,212
Granted Patent B2
US 11,097,212 · App. 16/105,547 · Granted Aug 24, 2021

Tailing pond remediation

Inventor: James Charles Juranitch (Fort Lauderdale, FL)
Assignee: Plasma Tech Holdings, LLC
B01D39/06B01D21/0012B01D37/03B01D39/10B01D41/04C03B37/10C03B37/16B01D2221/04B01D2239/0283B01D2257/93
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,097,212
App. No.
16/105,547
Granted
Aug 24, 2021
Kind
B2
Abstract

Various embodiments of the present disclosure can include a system for filtering of contaminated fluid. The system can include a fiber manufacturing plant. The system can include a filter system which utilizes a fiber filter produced in the fiber manufacturing plant to clean and recycle a contaminated fluid.

Claims (28)

1. A system for the filtering of contaminated fluid, comprising:

a fiber manufacturing plant, wherein the fiber manufacturing plant includes a melter and a spinner operable to produce a fiber filter blanket; and

a filter system that includes a filter station operably connected to the fiber manufacturing plant via a transfer line, wherein:

the fiber filter blanket is transferred from the fiber manufacturing plant to the filter station via the transfer line, and

the filter system is configured to clean a contaminated fluid with the filter blanket, wherein the contaminated fluid is provided to the filter system via an inlet.

2. The system for the filtering of contaminated fluid of claim 1 , where the filtering system is configured to shred a spent fiber filter with a shredder and re-melt the spent fiber filter with a plasma and fossil fuel based melter included in the manufacturing plant to manufacture a new fiber filter.

3. The system for filtering of contaminated fluid of claim 1 , further comprising a filter support feed roll, wherein the fiber filter is configured to be continually advanced over a filter support via the feed roll.

4. A system for the filtering of contaminated fluid, comprising:

a fiber manufacturing plant including a melter and a cutter operable to pre-size a fiber filter blanket produced in the plant; and

a filter system operably connected to the fiber manufacturing plant via a transfer line, wherein:

the filter system includes a pre-filter screen, which is movable, and a fiber filter,

the fiber filter is configured to clean a contaminated waste stream provided to the filter system via an inlet, and

the fiber filter includes the pre-sized fiber filter blanket that is produced in the fiber manufacturing plant, wherein the fiber filter blanket is transferred from the fiber manufacturing plant to the filter system via the transfer line.

5. The system of claim 4 , wherein a component of the fiber filter includes a recycled inorganic material.

6. The system of claim 4 , wherein a component of the fiber filter includes a recycled inorganic material, including beach sand.

7. The system of claim 4 , wherein a component of the fiber filter includes a recycled chemical additive.

8. The system of claim 4 , wherein a component of the fiber filter includes a recycled chemical additive that includes lime sludge.

9. A system for the filtering of contaminated fluid, comprising:

a fiber manufacturing plant that includes a melter configured to produce a melt, wherein the fiber manufacturing plant further includes a structure operable to produce a filter blanket from the melt; and

a filter system that includes a filter station operably connected to the fiber manufacturing plant via a transfer line, wherein:

the filter system includes a fiber filter configured to clean contaminated fluid provided to the filter system via an inlet, and

the fiber filter includes the fiber blanket that is produced in the fiber manufacturing plant, wherein the fiber filter blanket is transferred from the fiber manufacturing plant to the filter system via the transfer line.

10. The system of claim 9 , wherein the fiber manufacturing plant is configured to recycle a spent fiber filter through the melter to manufacture a new filter.

11. The system for the filtering of the contaminated fluid of claim 10 , wherein the filter system is configured to receive the contaminated fluid as a byproduct of a mining industry via a conduit.

12. The system for the filtering of the contaminated fluid of claim 10 , wherein the filter system is configured to receive the contaminated fluid as a byproduct of an oil mining industry via a conduit.

13. The system for the filtering of the contaminated fluid of claim 10 , wherein the filter system is configured to draw the contaminated fluid from a tailings pond, via a conduit.

14. The system for the filtering of the contaminated fluid of claim 10 , wherein the filter system is configured to draw the contaminated fluid from a buffering pool, via a conduit.

15. The system of claim 10 , wherein a component of the fiber filter includes an inorganic material.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 21, 2024
From: HELIOS ENVIRONMENTAL ADVANCED TECHNOLOGIES, LLC; XDI HOLDINGS, LLC; RADWASTE TECHNOLOGIES, LLC; PLASMA TECH HOLDINGS, LLC; PLASMA POWER, LLC; ADVANCED PETRO TECHNOLOGIES, LLC; CRU TECHNOLOGIES, LLC
To: HEAT IP HOLDCO, LLC
Reel/Frame 067484/0316 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 14, 2021
From: JURANITCH, JAMES CHARLES
To: PLASMA TECH HOLDINGS, LLC
Reel/Frame 054918/0388 →
Continuity (2)
Provisional Application 62548288 · Aug 21, 2017
Related Publication 20190054404A1 · Feb 21, 2019
Cited By (1)
US 12,233,365