IP Library Granted Patent US 10,516,465
Granted Patent B2
US 10,516,465 · App. 16/126,546 · Granted Dec 24, 2019

Harmonized operation between radio link monitor and beam failure recovery

Inventors: Chia-Hao Yu (Hsinchu, TW); Yuanyuan Zhang (Beijing, CN); Hsuan-Li Lin (Hsinchu, TW); Jiann-Ching Guey (Hsinchu, TW)
Assignee: MEDIATEK INC.
H04B7/0695H04B7/088H04W24/04H04W24/10H04W36/06H04W72/046H04W74/0833H04W16/28
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,516,465
App. No.
16/126,546
Granted
Dec 24, 2019
Kind
B2
Abstract

A method for harmonized operation between radio link monitor and beam failure recovery is proposed. In one example, upon indication of unsuccessful recovery from beam failure, a counter is initiated to count a configured number of OOS indication before RLF is declared due to beam failure. In another example, upon indication of successful recovery from beam failure, a counter is initiated to count a configured number of IS indication before starting over RLM procedure on its previous observations on failed beams. As a result, either early RLF declaration or RLM reset may be triggered based on BFR procedure to more accurately maintain the link quality.

Claims (22)

1. A method comprising:

detecting a beam failure condition of a serving beam pair link (BPL) by a user equipment (UE) in a beamforming communication network, wherein the UE initiates a beam failure recovery (BFR) procedure and transmits a beam failure recovery (BFRQ) message when the beam failure condition is met;

initiating a radio link monitor (RLM) procedure by the UE by periodically providing In-Sync (IS) and Out-of-Sync (OOS) indications of the serving BPL;

determining a BFR procedure result based on whether the UE receives a network response to the BFRQ message; and

generating an output to the RLM procedure by counting the IS and OOS indications, wherein the output triggers an RLM procedure reset or triggers a radio link failure (RLF) declaration in accordance with the BFR procedure result.

2. The method of claim 1 , wherein the UE initiates a timer upon determining the BFR procedure is unsuccessful, and wherein the UE declares radio link failure (RLF) when a number of accumulative OOS indications reaches a threshold before the timer expires.

3. The method of claim 1 , wherein the UE starts counting OOS-indications upon determining the BFR procedure is unsuccessful, and wherein the UE declares radio link failure (RLF) when a number of consecutive OOS-indications reaches a threshold.

4. The method of claim 1 , wherein the UE initiates a timer upon determining the BFR procedure is unsuccessful, and wherein the UE restarts the RLM procedure when a number of accumulative IS-indications reaches a threshold before the timer expires.

5. The method of claim 1 , wherein the UE starts counting IS-indications upon determining the BFR procedure is unsuccessful, and wherein the UE restarts the RLM procedure when a number of consecutive IS-indications reaches a threshold.

6. The method of claim 1 , wherein the UE initiates a timer upon determining the BFR procedure is successful, and wherein the UE restarts the RLM procedure when a number of accumulative IS-indications reaches a threshold before the timer expires.

7. The method of claim 1 , wherein the UE starts counting IS-indications upon determining the BFR procedure is successful, and wherein the UE restarts the RLM procedure when a number of consecutive IS-indications reaches a threshold.

8. A User Equipment (UE), comprising:

a receiver that receives reference signals and detects a beam failure condition of a serving beam pair link (BPL) in a beamforming communication network;

a radio link monitor (RLM) handling circuits that initiates an RLM procedure by periodically providing In-Sync (IS) and Out-of-Sync (OOS) indications of the serving BPL;

a beam failure recovery (BFR) handling circuits that initiates a BFR procedure and transmits a beam failure recovery request (BFRQ) message when the beam failure condition is met, wherein the BFR handling circuits determines a BFR procedure result based on whether the UE receives a network response to the BFRQ message; and

a BFR/RLM coordinating circuit that generates an output to the RLM procedure by counting the IS and OOS indications, wherein the output triggers an RLM procedure reset or triggers a radio link failure (RLF) declaration in accordance with the BFR procedure result.

9. The UE of claim 8 , wherein the UE initiates a timer upon determining the BFR procedure is unsuccessful, and wherein the UE declares radio link failure (RLF) when a number of accumulative OOS indications reaches a threshold before the timer expires.

10. The UE of claim 8 , wherein the UE starts counting OOS-indications upon determining the BFR procedure is unsuccessful, and wherein the UE declares radio link failure (RLF) when a number of consecutive OOS-indications reaches a threshold.

11. The UE of claim 8 , wherein the UE initiates a timer upon determining the BFR procedure is unsuccessful, and wherein the UE restarts the RLM procedure when a number of accumulative IS-indications reaches a threshold before the timer expires.

12. The UE of claim 8 , wherein the UE starts counting IS-indications upon determining the BFR procedure is unsuccessful, and wherein the UE restarts the RLM procedure when a number of consecutive IS-indications reaches a threshold.

13. The UE of claim 8 , wherein the UE initiates a timer upon determining the BFR procedure is successful, and wherein the UE restarts the RLM procedure when a number of accumulative IS-indications reaches a threshold before the timer expires.

14. The UE of claim 8 , wherein the UE starts counting IS-indications upon determining the BFR procedure is successful, and wherein the UE restarts the RLM procedure when a number of consecutive IS-indications reaches a threshold.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 7, 2026
From: MEDIATEK INC.
To: HFI INNOVATION INC.
Reel/Frame 075025/0575 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 12, 2018
From: ZHANG, YUANYUAN
To: MEDIATEK INC.
Reel/Frame 046846/0146 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 10, 2018
From: YU, CHIA-HAO; LIN, HSUAN-LI; GUEY, JIANN-CHING
To: MEDIATEK INC.
Reel/Frame 047042/0780 →
Continuity (2)
Provisional Application 62556554 · Sep 11, 2017
Related Publication 20190081689A1 · Mar 14, 2019