IP Library Granted Patent US 11,085,320
Granted Patent B2
US 11,085,320 · App. 16/141,395 · Granted Aug 10, 2021

Variable vane mechanism of turbocharger having predetermined vane clearance

Inventors: Arthur Jeanson (Chatel sur Moselle, FR); Francis Abel (La Baffe, FR); Emmanuel Crouvizier (Remiremont, FR)
Assignee: GARRETT TRANSPORTATION I INC
F01D17/16F01D17/165F02B37/22F05D2220/40F05D2230/232F05D2230/60F05D2240/12
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,085,320
App. No.
16/141,395
Granted
Aug 10, 2021
Kind
B2
Abstract

A method of manufacturing a variable vane mechanism includes arranging a vane and a spacer between a first support structure and a tool member of a tool. The method also includes abutting a first inner surface of the first support structure against a first side surface of the vane and a second side surface of the vane against an opposing surface of the tool member, leaving a control surface of the spacer projecting from the first support structure at a predetermined distance. The method further includes fixedly attaching the spacer to the first support structure with the control surface of the spacer projecting from the first support structure at the predetermined distance. The method further includes abutting a second support structure on the control surface of the spacer to define a gap between the first support structure and the second support structure with the vane disposed within the gap.

Claims (20)

1. A method of manufacturing a variable vane mechanism comprising:

arranging a vane and a spacer between a first support structure and a tooling surface;

abutting a first inner surface of the first support structure against a first side surface of the vane and a second side surface of the vane against the tooling surface, leaving a control surface of the spacer projecting from the first support structure at a predetermined distance;

fixedly attaching, while abutting the first inner surface against the first side surface and the second side surface against the tooling surface, the spacer to the first support structure with the control surface of the spacer projecting from the first support structure at the predetermined distance; and

abutting, after fixedly attaching the spacer to the first support structure, a second support structure on the control surface of the spacer to define a gap between the first support structure and the second support structure, the vane disposed within the gap.

2. The method of claim 1 , further comprising providing a shim having a predetermined thickness that corresponds to a predetermined vane clearance dimension, the vane clearance dimension being measured between the vane and at least one of the first and second support structures.

3. The method of claim 1 , wherein the spacer extends partially through the first support structure while abutting the first inner surface against the first side surface and the second side surface against the tooling surface.

4. The method of claim 3 , wherein fixedly attaching the spacer includes frictionally fixing the spacer to the first support structure.

5. The method of claim 3 , wherein fixedly attaching the spacer includes welding the spacer to the first support structure.

6. The method of claim 1 , further comprising fixedly attaching the spacer to the second support structure.

7. The method of claim 6 , wherein fixedly attaching the spacer to the second support structure includes riveting the spacer to the second support structure.

8. The method of claim 1 , wherein the first support structure includes an aperture;

further comprising compressing the tooling surface toward the first support structure to provide the spacer at a predetermined depth within the aperture; and

wherein fixedly attaching the spacer to the first support structure includes fixedly attaching the spacer to the first support structure at the predetermined depth within the aperture.

9. A method of manufacturing a variable vane mechanism comprising:

selecting a thickness of a shim according to a predetermined vane clearance dimension for the variable vane mechanism;

arranging a vane between a first support structure and the selected shim, and arranging a spacer between the first support structure and a base surface;

abutting a first inner surface of the first support structure against a first side surface of the vane, a second side surface of the vane against the shim, and a control surface of the spacer against the base surface, leaving the control surface of the spacer projecting from the first support structure at a predetermined distance;

fixedly attaching, while abutting the first inner surface against the first side surface and the second side surface against the shim, the spacer to the first support structure with the control surface of the spacer projecting from the first support structure at the predetermined distance; and

abutting, after fixedly attaching the spacer to the first support structure, a second support structure on the control surface of the spacer to define a gap between the first support structure and the second support structure, the vane disposed within the gap with the predetermined vane clearance dimension.

Assignments (3)
CORRECTIVE ASSIGNMENT TO CORRECT THE THE TYPOS IN THE APPLICATION NUMBER PREVIOUSLY RECORDED AT REEL: 056111 FRAME: 0583. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT. Recorded Feb 25, 2022
From: GARRETT TRANSPORTATION I INC.
To: JPMORGAN CHASE BANK, N.A., AS ADMINISTRATIVE AGENT
Reel/Frame 059250/0792 →
SECURITY AGREEMENT Recorded May 3, 2021
From: GARRETT TRANSPORTATION I INC.
To: JPMORGAN CHASE BANK, N.A., AS ADMINISTRATIVE AGENT
Reel/Frame 056111/0583 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 25, 2018
From: JEANSON, ARTHUR; ABEL, FRANCIS; CROUVIZIER, EMMANUEL
To: GARRETT TRANSPORTATION I INC.
Reel/Frame 046966/0213 →