IP Library Granted Patent US 11,496,937
Granted Patent B2
US 11,496,937 · App. 16/198,898 · Granted Nov 8, 2022

Methods and related devices for handling random access procedure in bandwidth part switching operation

Inventors: Hung-Chen Chen (Hsinchu, TW); Chie-Ming Chou (Hsinchu, TW); Chia-Hung Wei (Hsinchu, TW); Yung-Lan Tseng (Hsinchu, TW)
Assignee: FG Innovation Company Limited
H04W36/06H04L5/0053H04L5/0064H04L5/0096H04W36/38H04W74/006H04W74/0833
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,496,937
App. No.
16/198,898
Granted
Nov 8, 2022
Kind
B2
Abstract

A method for handling a Random Access (RA) procedure in the Bandwidth Part (BWP) switching operation includes: receiving, by a User Equipment (UE), Downlink Control Information (DCI) including a BWP switching indication via a Physical Downlink Control Channel (PDCCH) when the UE performs a first RA procedure on a first BWP; and performing, by the UE, at least one of a plurality of procedures in response to the BWP switching indication. The procedures include: stopping the first RA procedure on the first BWP and initiating a second RA procedure on a second BWP indicated by the BWP switching indication; and ignoring the BWP switching indication to continue with the first RA procedure.

Claims (36)

1. A User Equipment (UE), comprising:

one or more non-transitory computer-readable media having computer-executable instructions embodied thereon; and

at least one processor coupled to the one or more non-transitory computer-readable media, and configured to execute the computer-executable instructions to:

receive a configuration of a first Bandwidth Part (BWP) through Radio Resource Control (RRC) signaling from a Base Station (BS);

initiate a Random Access (RA) procedure on the first BWP;

receive Downlink Control Information (DCI) indicating a BWP switching from the first BWP to a second BWP;

determine whether to switch to the second BWP in response to receiving the DCI;

in a case that the UE determines to switch to the second BWP:

stop the RA procedure that is ongoing on the first BWP;

determine whether the second BWP is configured with an RA resource; and

initiate, after determining that the second BWP is not configured with the RA resource, a new RA procedure on an initial BWP, the UE being informed of the initial BWP via system information received from the BS; and

in a case that the UE determines not to switch to the second BWP:

continue with the RA procedure that is ongoing on the first BWP; and

stop a BWP inactivity timer.

2. The UE of claim 1 , wherein the at least one processor is further configured to execute the computer-executable instructions to:

perform the new RA procedure on the initial BWP by using a group of RA parameters with configured values and using a group of UE variables with reset values.

3. The UE of claim 2 , wherein the group of UE variables comprises at least one of a preamble counter and a power ramping counter.

4. The UE of claim 1 , wherein the at least one processor is further configured to execute the computer-executable instructions to:

initiate the new RA procedure on the second BWP after determining that the second BWP is configured with the RA resource.

5. A method performed by a User Equipment (UE), the method comprising:

receiving a configuration of a first Bandwidth Part (BWP) through Radio Resource Control (RRC) signaling from a Base Station (BS);

initiating a Random Access (RA) procedure on the first BWP;

receiving Downlink Control Information (DCI) indicating a BWP switching from the first BWP to a second BWP;

determining whether to switch to the second BWP in response to receiving the DCI;

in a case that the UE determines to switch to the second BWP:

stopping the RA procedure that is ongoing on the first BWP;

determining whether the second BWP is configured with an RA resource; and

initiating, after determining that the second BWP is not configured with the RA resource, a new RA procedure on an initial BWP, the UE being informed of the initial BWP via system information received from the BS; and

in a case that the UE determines not to switch to the second BWP:

continuing with the RA procedure that is ongoing on the first BWP; and

stopping a BWP inactivity timer.

6. The method of claim 5 , further comprising:

performing the new RA procedure on the initial BWP by using a group of RA parameters with configured values and using a group of UE variables with reset values.

7. The method of claim 6 , wherein the group of UE variables comprises at least one of a preamble counter and a power ramping counter.

8. The method of claim 5 , further comprising:

initiating the new RA procedure on the second BWP after determining that the second BWP is configured with the RA resource.

Assignments (4)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 24, 2024
From: FG INNOVATION COMPANY LIMITED
To: SHARP KABUSHIKI KAISHA
Reel/Frame 069029/0001 →
CORRECTIVE ASSIGNMENT TO CORRECT THE RECEIVING PARTY STATE/COUNTRY PREVIOUSLY RECORDED ON REEL 049297 FRAME 0824. ASSIGNOR(S) HEREBY CONFIRMS THE CHANGE OF NAME. Recorded Aug 20, 2019
From: FG INNOVATION IP COMPANY LIMITED
To: FG INNOVATION COMPANY LIMITED
Reel/Frame 050111/0503 →
CHANGE OF NAME Recorded May 28, 2019
From: FG INNOVATION IP COMPANY LIMITED
To: FG INNOVATION COMPANY LIMITED
Reel/Frame 049297/0824 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 23, 2018
From: CHEN, HUNG-CHEN; CHOU, CHIE-MING; WEI, CHIA-HUNG; TSENG, YUNG-LAN
To: FG INNOVATION IP COMPANY LIMITED
Reel/Frame 047567/0844 →
Continuity (2)
Provisional Application 62590381 · Nov 24, 2017
Related Publication 20190166529A1 · May 30, 2019