IP Library Granted Patent US 10,684,598
Granted Patent B1
US 10,684,598 · App. 16/240,028 · Granted Jun 16, 2020

Building management system with efficient model generation for system identification

Inventors: Anas W. I. Alanqar (Milwaukee, WI); Matthew J. Ellis (Milwaukee, WI); Michael J. Wenzel (Grafton, WI); Juan Esteban Tapiero Bernal (Wauwatosa, WI)
Assignee: Johnson Controls Technology Company
G05B15/02G05B23/0235G06Q10/04G05B2219/2642
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,684,598
App. No.
16/240,028
Granted
Jun 16, 2020
Kind
B1
Abstract

A building management system includes building equipment operable generate training data relating to behavior of a building system and a controller configured to perform a system identification process that includes generating a prediction error function based on the training data and a system model, generating initial guesses of one or more parameters of the system model, running an optimization problem of the prediction error function for a first group of iterations, discarding, after the first group of iterations, a portion of the initial guesses based on one or more criteria and ranking a remaining portion of the initial guesses, running the optimization problem of the prediction error function for a top-ranked initial guess of the remaining portion to local optimality to identify a first set of values of the one or more parameters, and identifying the one or more parameters as having the first set of values.

Claims (58)

1. A building management system comprising:

building equipment operable to heat or cool a building and generate training data relating to behavior of a building system; and

a controller configured to perform a system identification process to identify one or more parameters of a system model that predicts the behavior of the building system, the one or more parameters comprising at least one of one or more model parameters or one or more Kalman gain parameters, the system identification process comprising:

generating a prediction error function based on the training data and the system model;

generating a plurality of initial guesses of the one or more parameters;

for each initial guess, running an optimization problem of the prediction error function for a first group of iterations;

after the first group of iterations, discarding a portion of the initial guesses based on one or more criteria and ranking a remaining portion of the initial guesses;

running the optimization problem of the prediction error function for a top-ranked initial guess of the remaining portion to local optimality or for a second group of iterations to identify a first set of values of the one or more parameters;

determining whether the first set of values of the one or more parameters satisfies a condition; and

in response to a determination that the first set of values satisfies the condition, identifying the one or more parameters as having the first set of values;

wherein the controller is configured to operate the building equipment to heat or cool the building by performing a predictive control process that uses the system model with the one or more parameters identified by the system identification process.

2. The building management system of claim 1 , wherein the controller is further configured to, in response to determining that the first set of values does not satisfy the condition:

discard the top-ranked initial guess;

run the optimization problem for a new top-ranked initial guess to local optimality or for the second group of iterations to identify a second set of values of the one or more parameters;

determine whether the second set of values satisfies the condition; and

in response to a determination that the second set of values satisfies the condition, select the second set of values for the one or more parameters.

3. The building management system of claim 1 , wherein the controller is configured to discard initial guesses that violate physical laws relating to the one or more parameters.

4. The building management system of claim 3 , wherein determining that the first set of values satisfies the condition comprises determining that the first set of values conforms with the physical laws relating to the one or more parameters.

5. The building management system of claim 1 , wherein the controller is configured to discard the portion of the initial guesses based on one or more criteria by determining that a first initial guess and a second initial guess lead toward a same local optimum after the first group of iterations and, in response, discarding the first initial guess.

6. The building management system of claim 1 , wherein the controller is configured to discard the portion of the initial guesses based on one or more criteria by discarding initial guesses that lead to an unstable, uncontrollable, or unobservable system after the first group of iterations.

7. The building management system of claim 1 , wherein the controller is configured to discard the portion of the initial guesses based on one or more criteria by discarding initial guesses that lead to a matrix with a condition number greater than a threshold number.

8. The building management system of claim 1 , wherein each of the plurality of initial guesses provides a stable system.

9. The building management system of claim 1 , wherein the controller is configured to detect and remove saturation data from the training data.

10. The building management system of claim 1 , wherein the prediction error function comprises a multi-step ahead prediction error function.

11. A method for generating a system model for a building system and controlling building equipment in accordance with the system model, comprising:

operating the building equipment to generate training data relating to behavior of the building system;

defining a prediction error function based on the training data and the system model;

identifying values for one or more parameters of the system model by optimizing the prediction error function, wherein optimizing the prediction error function comprises:

generating a plurality of initial guesses of the one or more parameters;

for each initial guess, running an optimization problem of the prediction error function for a first group of iterations;

after the first group of iterations, discarding a portion of the initial guesses based on one or more criteria and ranking a remaining portion of the initial guesses;

running the optimization problem of the prediction error function for a top-ranked initial guess of the remaining portion to local optimality or for a second group of iterations to identify a first set of values of the one or more parameters;

determining whether the first set of values of the one or more parameters satisfies a condition; and

in response to a determination that the first set of values satisfies the condition, defining the one or more parameters as having the first set of values; and

operating the building equipment to heat or cool the building system by applying the system model in a predictive controller to generate control inputs for the building equipment.

12. The method of claim 11 , further comprising, in response to determining that the first set of values does not satisfy the condition:

discarding the top-ranked initial guess;

running the optimization problem of the prediction error function for a new top-ranked initial guess to local optimality or for the second group of iterations to identify a second set of values of the one or more parameters;

determining whether the second set of values satisfies the condition; and

in response to a determination that the second set of values satisfies the condition, selecting the second set of values for the one or more parameters.

13. The method of claim 11 , comprising discarding initial guesses that violate physical laws relating to the one or more parameters and the behavior of the building system.

14. The method of claim 13 , wherein determining that the first set of values satisfies the condition comprises determining that the first set of values conforms with the physical laws.

15. The method of claim 11 , wherein discarding the portion of the initial guesses based on one or more criteria comprises determining that a first initial guess and a second initial guess lead toward a same local optimum after the first group of iterations and, in response, discarding the first initial guess.

16. The method of claim 11 , wherein discarding the portion of the initial guesses based on one or more criteria comprises discarding initial guesses that lead to an unstable, uncontrollable, or unobservable system after the first group of iterations.

17. The method of claim 11 , wherein discarding the portion of the initial guesses based on one or more criteria comprises discarding initial guesses that lead to a matrix with a condition number greater than a threshold number after the first group of iterations.

18. The method of claim 11 , wherein each of the plurality of initial guesses provides a stable system.

19. The method of claim 11 , comprising detecting and removing saturation data from the training data.

20. A method for generating a system model for a building system and controlling building equipment in accordance with the system model, comprising:

operating the building equipment to generate training data relating to behavior of the building system;

defining a prediction error function based on the training data and the system model;

identifying values for one or more parameters of the system model based on the prediction error function by:

generating a plurality of initial guesses of the one or more parameters;

for each initial guess, performing a first group of iterations using the prediction error function;

after the first group of iterations, discarding a portion of the initial guesses based on one or more criteria and ranking a remaining portion of the initial guesses;

performing a second group of iterations using the prediction error function for a top-ranked initial guess of the remaining portion to identify a first set of values of the one or more parameters;

determining whether the first set of values of the one or more parameters satisfies a condition; and

in response to a determination that the first set of values satisfies the condition, defining the one or more parameters as having the first set of values; and

operating the building equipment to heat or cool the building system by applying the system model in a predictive controller to generate control inputs for the building equipment.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 9, 2024
From: JOHNSON CONTROLS TYCO IP HOLDINGS LLP
To: TYCO FIRE & SECURITY GMBH
Reel/Frame 067056/0552 →
NUNC PRO TUNC ASSIGNMENT Recorded Feb 4, 2022
From: JOHNSON CONTROLS TECHNOLOGY COMPANY
To: JOHNSON CONTROLS TYCO IP HOLDINGS LLP
Reel/Frame 058959/0764 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 12, 2019
From: ALANQAR, ANAS W.I.; ELLIS, MATTHEW J.; WENZEL, MICHAEL J.; BERNAL, JUAN ESTEBAN TAPIERO
To: JOHNSON CONTROLS TECHNOLOGY COMPANY
Reel/Frame 048576/0540 →
Cited By (4)
US 12,265,918 US 12,271,945 US 12,561,709 US 12,613,888