IP Library Granted Patent US 11,623,281
Granted Patent B2
US 11,623,281 · App. 16/273,099 · Granted Apr 11, 2023

Build material application device

Inventors: Viktor Dering (Coburg, DE); Alexander Hofmann (Weismain, DE); Daniel Winiarski (Bad Staffelstein, DE)
Assignee: CONCEPT LASER GMBH
B22F12/00B29C64/214B33Y40/00B22F10/10B22F2999/00B33Y30/00
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,623,281
App. No.
16/273,099
Granted
Apr 11, 2023
Kind
B2
Abstract

Build material application device for additively manufacturing a three-dimensional object, the build material application device comprising: at least one blade-like build material application member; at least one support unit for supporting the blade-like build material application member, wherein the support unit comprises at least two support unit members defining a receiving section for receiving a blade-like build material application member, a first support unit member is moveably supported relative to a second support unit member between a first operating position, in which a holding force is exertable or exerted on a blade-like build material application member received in the receiving section, and a second operating position, in which no holding force is exertable or exerted on a blade-like build material application member received in the receiving section.

Claims (22)

1. A build material application device for additively manufacturing at least one three-dimensional object by successive layerwise selective irradiation and consolidation of layers of build material with at least one energy beam, the build material application device comprising:

at least one build material application member; and

at least one support unit for supporting the build material application member, wherein:

the support unit comprises a first support unit member and a second support unit member, the first and second support unit members defining a receiving section therebetween configured for receiving the at least one build material application member which is to be supported with the support unit, wherein the first support unit member is moveably supported relative to the second support unit member between a first operating position, in which a holding force is exerted on the at least one build material application member within the receiving section, and a second operating position, in which no holding force is exerted on the at least one build material application member within the receiving section.

2. The build material application device according to claim 1 , wherein the receiving section has a gap shaped configuration.

3. The build material application device according to claim 1 , wherein the receiving section comprises at least one inserting region through which the at least one build material application member is insertable in the receiving section, wherein the inserting region is arranged in such a manner that the at least one build material application member is insertable into the receiving section in an inserting direction parallel to a longitudinal direction of the support unit members.

4. The build material application device according to claim 1 , wherein the receiving section comprises at least one inserting region through which the at least one build material application member is insertable in the receiving section, wherein the receiving section is arranged in such a manner that the at least one build material application member is insertable into the receiving section in an inserting direction transverse to the longitudinal direction of the support unit members.

5. The build material application device according to claim 1 , further comprising a build material application member supply device configured to supply the at least one build material application member or an endless build material application member material configured to be received in the receiving section.

6. The build material application device according to claim 5 , wherein the build material application member supply device comprises a build material application member storage supply unit configured to store the at least one build material application member.

7. The build material application device according to claim 5 , wherein the build material application member supply device comprises an endless build material application member material supply unit configured to store an endless build material application member material which needs to be shaped so as to form the at least one build material application member.

8. The build material application device according to claim 7 , further comprising a shaping unit which is configured to cut a strip of build material application member material in pre-definable or pre-defined dimensions of the at least one build material application member usable or used in the build material application device when the strip of build material application member material is inserted in the receiving section.

9. The build material application device according to claim 1 , further comprising a receiving unit for receiving used build material application members as they are removed from the receiving section.

10. The build material application device according to claim 1 , wherein the support unit is moveably supported at least in a receiving position in which receiving the at least one build material application member from a build material application member supply device in the receiving section is possible.

11. The build material application device according to claim 1 , wherein the support unit is moveably supported at least in a receiving position in which at least in a removal position in which removing the at least one build material application member from the receiving section in a receiving unit is possible.

12. The build material application device according to claim 1 , further comprising a handling device configured to handle the at least one build material application member or an endless build material application member material which is to be received in the receiving section.

13. The build material application device according to claim 1 , further comprising an adjusting device configured to adjust the position and/or orientation of the at least one build material application member with regard to a desired position and/or orientation in the receiving section.

14. The build material application device according to claim 13 , wherein the adjusting device comprises at least one stopper element configured to co-act with the at least one build material application member being received in the receiving section so as to adjust the position and/or orientation of the at least one build material application member with regard to the desired position and/or orientation in the receiving section.

15. The build material application device according to claim 14 , wherein the at least one stopper element is moveably supported relative to the support unit between a first operational position, in which it co-acts with the at least one build material application member being received in the receiving section so as to adjust the position and/or orientation of the at least one build material application member with regard to a desired position and/or orientation in the receiving section, and a second operational position, in which it does not co-act with the at least one build material application member being received in the receiving section so as to adjust the position and/or orientation of the at least one build material application member with regard to the desired position and/or orientation in the receiving section.

16. A method for replacing a build material application member supported in a receiving section of a support unit of a build material application device, the method comprising:

moving a first support unit member of the support unit relative to a second support unit member of the support unit from a first operating position, in which a holding force is exerted on at least one build material application member within the receiving section, to a second operating position, in which no holding force is exerted on the at least one build material application member within the receiving section; or

moving a first support unit member of the support unit relative to a second support unit member of the support unit from a second operating position, in which a no holding force is exerted on the at least one build material application member within the receiving section, to a first operating position, in which a holding force is exerted on the at least one build material application member within the receiving section; whereby

the at least one build material application member is inserted into the receiving section or the build material application member is removed from the receiving section when the first support unit member is in the second position.

Assignments (2)
MERGER AND CHANGE OF NAME Recorded Feb 28, 2020
From: CL SCHUTZRECHTSVERWALTUNGS GMBH; CONCEPT LASER GMBH
To: CONCEPT LASER GMBH
Reel/Frame 052048/0799 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 13, 2019
From: DERING, VIKTOR; HOFMANN, ALEXANDER; WINIARSKI, DANIEL
To: CL SCHUTZRECHTSVERWALTUNGS GMBH
Reel/Frame 048320/0569 →
Priority Claims (1)
EP 18161050 · Mar 9, 2018 · regional
Continuity (1)
Related Publication 20190275586A1 · Sep 12, 2019