IP Library Granted Patent US 11,309,702
Granted Patent B2
US 11,309,702 · App. 16/287,571 · Granted Apr 19, 2022

Systems and methods for islanding protection

Inventors: Khoi Vu (Cary, NC); Salman Khalid Gill (Raleigh, NC)
Assignee: HITACHI ENERGY SWITZERLAND AG
H02H3/38H02H1/0007
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,309,702
App. No.
16/287,571
Granted
Apr 19, 2022
Kind
B2
Abstract

Illustrative embodiments of systems and methods for detecting and responding to islanding of distributed energy resources are disclosed. In at least one illustrative embodiment, a method may include measuring voltage and current at a connection point between a distributed energy resource and an electrical grid, determining a Thévenin impedance of the electrical grid based upon the voltage and current measurements, and determining whether the Thévenin impedance has exceeded a predetermined threshold. In some embodiments, the method may further include disconnecting the distributed energy resource from the electrical grid in response to determining that the Thévenin impedance has exceeded the predetermined threshold.

Claims (48)

1. A method comprising:

measuring voltage and current at a connection point between a distributed energy resource and an electrical grid;

determining a Thévenin impedance of the electrical grid based upon the voltage and current measurements;

setting a predetermined threshold, wherein setting the predetermined threshold comprises:

determining a first range of possible values for the Thévenin impedance under a normal condition using a computer simulation;

determining a second range of possible values for the Thévenin impedance under an islanding condition using a computer simulation; and

determining whether an overlap exists between the first and second ranges of possible values for the Thévenin impedance; and

determining whether the Thévenin impedance has exceeded the predetermined threshold.

2. The method of claim 1 , further comprising disconnecting the distributed energy resource from the electrical grid in response to determining that the Thévenin impedance has exceeded the predetermined threshold.

3. The method of claim 2 , further comprising:

determining, in response to disconnecting the distributed energy resource from the electrical grid, a subsequent Thévenin impedance of the electrical grid; and

re-connecting, in response to determining that the subsequent Thévenin impedance is below the predetermined threshold, the distributed energy resource to the electrical grid.

4. The method of claim 1 , further comprising setting the predetermined threshold based at least on a location of the distributed energy resource.

5. The method of claim 1 , further comprising:

setting, in response to determining that the overlap exists, a first predetermined threshold and a second predetermined threshold;

determining whether the Thévenin impedance has exceeded the first predetermined threshold; and

disconnecting the distributed energy resource from the electrical grid in response to determining that the Thévenin impedance has exceeded the first predetermined threshold.

6. The method of claim 5 , further comprising:

determining, in response to disconnecting the distributed energy resource from the electrical grid, a subsequent Thévenin impedance of the electrical grid;

determining whether the Thévenin impedance has exceeded the second predetermined threshold; and

re-connecting, in response to determining that the subsequent Thévenin impedance is below the second predetermined threshold, the distributed energy resource to the electrical grid.

7. The method of claim 1 , wherein the normal condition includes the distributed energy resource providing power to the electrical grid, and wherein the islanding condition includes the distributed energy resource continuing to provide power to a subsection of the electrical grid after the subsection of the electrical grid has been isolated from a remainder of the electrical grid.

8. The method of claim 1 , wherein the distributed energy resource includes at least one of a solar panel, a hydro system, a wind turbine, a geothermal power system, a biomass power system, and a diesel generator.

9. A system comprising:

a distributed energy resource; and

a connection device coupled to the distributed energy resource to control distribution of power from the distributed energy resource to an electrical grid, wherein the connection device is configured to:

measure voltage and current at a connection point between the distributed energy resource and the electrical grid;

determine a Thévenin impedance of the electrical grid based upon the voltage and current measurements;

set a predetermined threshold, wherein to set the predetermined threshold comprises to:

determine a first range of possible values for the Thévenin impedance under a normal condition using a computer simulation;

determine a second range of possible values for the Thévenin impedance under an islanding condition using a computer simulation; and

determine whether an overlap exists between the first and second ranges of possible values for the Thévenin impedance; and

determine whether the Thévenin impedance has exceeded the predetermined threshold.

10. The system of claim 9 , wherein the connection device is further configured to disconnect the distributed energy resource from the electrical grid in response to a determination that the Thévenin impedance has exceeded the predetermined threshold.

11. The system of claim 10 , wherein the connection device is further configured to:

determine, in response to a disconnection of the distributed energy resource from the electrical grid, a subsequent Thévenin impedance of the electrical grid; and

re-connect, in response to a determination that the subsequent Thévenin impedance is below the predetermined threshold, the distributed energy resource to the electrical grid.

12. The system of claim 9 , wherein the connection device is further configured to set the predetermined threshold based at least on a location of the distributed energy resource.

13. The system of claim 9 , wherein the connection device is further configured to:

set, in response to a determination that the overlap exists, a first predetermined threshold and a second predetermined threshold;

determine whether the Thévenin impedance has exceeded the first predetermined threshold; and

disconnect the distributed energy resource from the electrical grid in response to a determination that the Thévenin impedance has exceeded the first predetermined threshold.

14. The system of claim 13 , wherein the connection device is further configured to:

determine, in response to a disconnection of the distributed energy resource from the electrical grid, a subsequent Thévenin impedance of the electrical grid;

determine whether the Thévenin impedance has exceeded the second predetermined threshold; and

re-connect, in response to a determination that the subsequent Thévenin impedance is below the second predetermined threshold, the distributed energy resource to the electrical grid.

15. The system of claim 9 , wherein the normal condition includes the distributed energy resource providing power to the electrical grid, and wherein the islanding condition includes the distributed energy resource continuing to provide power to a subsection of the electrical grid after the subsection of the electrical grid has been isolated from a remainder of the electrical grid.

16. The system of claim 9 , wherein the distributed energy resource includes at least one of a solar panel, a hydro system, a wind turbine, a geothermal power system, a biomass power system, and a diesel generator.

Assignments (4)
MERGER Recorded Nov 13, 2023
From: HITACHI ENERGY SWITZERLAND AG
To: HITACHI ENERGY LTD
Reel/Frame 065548/0905 →
CHANGE OF NAME Recorded Dec 31, 2021
From: ABB POWER GRIDS SWITZERLAND AG
To: HITACHI ENERGY SWITZERLAND AG
Reel/Frame 058601/0692 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 6, 2020
From: ABB SCHWEIZ AG
To: ABB POWER GRIDS SWITZERLAND AG
Reel/Frame 052916/0001 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 27, 2019
From: VU, KHOI; GILL, SALMAN KHALID
To: ABB SCHWEIZ AG
Reel/Frame 048458/0432 →