Coordinated net-load management

Inventors: Blake Richard Lundstrom (Lakewood, CO); Sourav Kumar Patel (Minneapolis, MN); Murti Salapaka (Plymouth, MN)
Assignees: Alliance for Sustainable Energy, LLC; Regents of the University of Minnesota
H02J13/0017H02J3/12
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,756,570
App. No.
16/298,912
Granted
Aug 25, 2020
Kind
B2
Abstract

A management device includes at least one processor communicatively coupled to at least one energy resource controller controlling at least one energy resource and to at least one deferrable load controller controlling power to at least one deferrable load. The is configured to receive an indication, determined based on a frequency value of an electrical network and a nominal frequency value, that a frequency anomaly event has occurred. Responsive to receiving the indication that the frequency anomaly event has occurred, the processor is also configured to determine, for at least one of the energy resource and the deferrable load, based on the frequency value, the nominal frequency value, and a power value of the electrical network, a respective power command, and cause at least one of the at least one energy resource and the at least one deferrable load to modify operation based on the respective power command.

Claims (78)

1. A device comprising:

at least one processor communicatively coupled to at least one energy resource controller that controls at least one energy resource and to at least one deferrable load controller that controls power to at least one deferrable load, wherein the at least one processor is configured to:

receive an indication, determined based on a frequency value of an electrical network and a nominal frequency value, that a frequency anomaly event has occurred; and

responsive to receiving the indication that the frequency anomaly event has occurred:

determine, for at least one of the at least one energy resource and the at least one deferrable load, based on the frequency value, the nominal frequency value, and a power value of the electrical network, a respective power command; and

cause at least one of the at least one energy resource and the at least one deferrable load to modify operation based on the respective power command.

2. The device of claim 1 , wherein determining the respective power command comprises:

outputting a request for a respective present operating power value from each of the at least one energy resource and the at least one deferrable load;

receiving an indication of the respective present operating power value for each of the at least one energy resource and the at least one deferrable load; and

determining the respective power command based additionally on the respective present operating power value for each of the at least one energy resource and the at least one deferrable load.

3. The device of claim 1 , wherein the respective power command is determined based additionally on a specified control objective.

4. The device of claim 3 , wherein the specified control objective comprises at least one of:

minimizing a total amount of deferrable load that must be curtailed; or

prioritizing unmodified operation of specific ones of the at least one deferrable load.

5. The device of claim 1 , wherein:

the frequency anomaly event comprises an underfrequency event in which the frequency value is smaller than the nominal frequency value less a nominal frequency limit value;

determining the respective power command comprises:

determining, based on a present power value of the electrical network, the frequency value and the nominal frequency value, a necessary power delta value; and

determining whether the necessary power delta value is larger than a difference between a maximum rated power output value for the at least one energy resource and a present power output value for the at least one energy resource; and

causing at least one of the at least one energy resource and the at least one deferrable load to modify operation comprises causing, responsive to determining that the necessary power delta value is not larger than the difference, the at least one energy resource controller to increase a power output of the at least one energy resource by the necessary power delta value.

6. The device of claim 5 , wherein:

the at least one deferrable load comprises a plurality of deferrable loads, each corresponding to a respective present load value in a plurality of present load values;

determining the respective power command further comprises, responsive to determining that the necessary power delta value is larger than the difference, determining, based on the plurality of present load values, a set of deferrable loads in the plurality of deferrable loads that will be curtailed; and

causing at least one of the at least one energy resource and the at least one deferrable load to modify operation comprises causing, responsive to determining the set of deferrable loads, a respective deferrable load controller for each deferrable load in the set of deferrable loads to cease providing power to the deferrable load.

7. The device of claim 1 , wherein:

the at least one processor is communicatively coupled to a second instance of the device; and

the respective power command is determined based additionally on information received from the second instance of the device regarding a net-load unit managed by the second instance of the device.

8. The device of claim 1 , wherein causing the at least one of the at least one energy resource and the at least one deferrable load to modify operation based on the respective power command comprises outputting, to the at least one deferrable load controller, instructions to cease providing power to the at least one deferrable load.

9. The device of claim 1 , wherein causing the at least one of the at least one energy resource and the at least one deferrable load to modify operation based on the respective power command comprises outputting, to the at least one energy resource controller, instructions to modify an operating set point of the at least one energy resource.

10. The device of claim 1 , wherein the at least one processor is configured to cause the at least one of the at least one energy resource and the at least one deferrable load to modify operation within 200 ms after receiving the indication.

11. A system comprising:

a grid point of common coupling (PCC) controller configured to:

measure a frequency value of an electrical distribution network at a point at which the electrical distribution network connects to a consumer electrical system;

determine, based on the frequency value and a nominal frequency value, whether a frequency anomaly event has occurred; and

responsive to determining that the frequency anomaly event has occurred, output an indication of the frequency anomaly event;

a net-load management device comprising at least one processor, wherein the net-load management device is configured to:

receive the indication of the frequency anomaly event;

output a request for a respective present operating power value for at least one deferrable load in the consumer electrical system;

receive an indication of the respective present operating value for the at least one deferrable load;

responsive to receiving the indication of the frequency anomaly event, determine, for the at least one deferrable load, based on the respective present operating value, the frequency value, and a nominal frequency value, a respective power command; and

output an indication of the respective power command; and

at least one deferrable load controller operatively coupled to the at least one deferrable load, the at least one deferrable load controller configured to:

receive the indication of the respective power command; and

cause the at least one deferrable load to modify operation based on the respective power command.

12. The system of claim 11 , wherein:

the net-load management device is further configured to:

output a request for the respective present operating power value for at least one energy resource in the consumer electrical system; and

receive an indication of the respective present operating value for the at least one energy resource;

determining, the respective power command comprises determining a respective power command for at least one of the at least one energy resource and the at least one deferrable load; and

the system further comprises at least one energy resource controller operatively coupled to the at least one energy resource, the at least one energy resource controller configured to:

receive the indication of the respective power command; and

issue a set point to the at least one energy resource based on the respective power command.

13. The system of claim 12 , wherein:

the frequency anomaly event comprises an underfrequency event in which the frequency value is smaller than the nominal frequency value less a nominal frequency limit value;

determining the respective power command comprises:

determining, based on a present power value of the power distribution network, the frequency value and the nominal frequency value, a necessary power delta value; and

determining whether the necessary power delta value is larger than a difference between a maximum rated power output value for the at least one energy resource and a present power output value for the at least one energy resource; and

outputting the indication of the respective power command comprises outputting, responsive to determining that the necessary power delta value is not larger than the difference, an instruction to cause the at least one energy resource controller to increase a power output of the at least one energy resource by the necessary power delta value.

14. The system of claim 13 , wherein:

the at least one deferrable load comprises a plurality of deferrable loads, each corresponding to a respective present load value in a plurality of present load values;

determining the respective power command further comprises, responsive to determining that the necessary power delta value is larger than the difference, determining, based on the plurality of present load values, a set of deferrable loads in the plurality of deferrable loads that will be curtailed; and

outputting the indication of the respective power command comprises outputting, responsive to determining the set of deferrable loads, instructions to a respective deferrable load controller for each deferrable load in the set of deferrable loads to cease providing power to the deferrable load.

15. The system of claim 11 , wherein:

the grid PCC, the net-load management device, and the at least one deferrable load are part of a first net-load unit;

the net-load management device is a first net-load management device;

the first net-load management device is further configured to receive second net-load information about at least one of an energy resource included in a second net-load unit or a deferrable load included in the second net-load unit; and

the first net-load management device is configured to determine the respective power command based additionally on the second net-load information.

16. The system of claim 15 , wherein the first net-load management device is further configured to output, to at least one of a supervisory management device or a second net-load management device that manages the second net-load unit, an indication of the respective present operating value for the at least one deferrable load.

17. The system of claim 11 , wherein the net-load management device is configured to determine the respective power command based additionally on a specified control objective that comprises at least one of:

minimizing a total amount of deferrable load that must be curtailed; or

prioritizing unmodified operation of specific ones of the at least one deferrable load.

18. The system of claim 11 , wherein the at least one deferrable load controller is configured to cause the at least one deferrable load to modify operation by outputting, to the at least one deferrable load, instructions to modify an operating set point of the at least one deferrable load.

19. The system of claim 11 , wherein the at least one deferrable load controller is configured to cause the at least one deferrable load to modify operation by ceasing to provide power to the deferrable load.

20. A method comprising:

receiving, by a computing device comprising at least one processor, an indication, determined based on a frequency value of an electrical network and a nominal frequency value, that a frequency anomaly event has occurred, wherein the computing device is communicatively coupled to at least one energy resource controller that controls at least one energy resource and to at least one deferrable load controller that controls power to at least one deferrable load; and

responsive to receiving the indication that the frequency anomaly event has occurred:

determining, by the computing device and for at least one of the at least one energy resource and the at least one deferrable load, based on the frequency value, the nominal frequency value, and a power value of the electrical network, a respective power command; and

causing, by the computing device, at least one of the at least one energy resource and the at least one deferrable load to modify operation based on the respective power command.

Assignments (4)
CHANGE OF NAME Recorded Dec 16, 2025
From: ALLIANCE FOR SUSTAINABLE ENERGY, LLC
To: ALLIANCE FOR ENERGY INNOVATION, LLC
Reel/Frame 073993/0276 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 22, 2020
From: SALAPAKA, MURTI
To: REGENTS OF THE UNIVERSITY OF MINNESOTA
Reel/Frame 053280/0252 →
CONFIRMATORY LICENSE Recorded Jun 13, 2019
From: NATIONAL RENEWABLE ENERGY LABORATORY
To: UNITED STATES DEPARTMENT OF ENERGY
Reel/Frame 049458/0538 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 11, 2019
From: LUNDSTROM, BLAKE RICHARD; PATEL, SOURAV KUMAR
To: ALLIANCE FOR SUSTAINABLE ENERGY, LLC
Reel/Frame 048565/0848 →