IP Library Granted Patent US 10,801,270
Granted Patent B2
US 10,801,270 · App. 16/309,875 · Granted Oct 13, 2020

Jack-up rig for performing multiple independent operations simultaneously

Inventors: Marco Plano (Kristiansand, NO); Roar Berge (Kristiansand, NO)
Assignee: National Oilwell Varco Norway AS
E21B15/003E02B17/021E21B15/02E02B17/02
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,801,270
App. No.
16/309,875
Granted
Oct 13, 2020
Kind
B2
Abstract

Disclosed is a jack-up rig that includes a cantilever platform mounted on a buoyant hull. At least two drilling assemblies are provided on the cantilever platform, each of the drilling assemblies being movable relative to the cantilever platform and being moveable independently from the other drilling assembly or assemblies. Each of the drilling assemblies is also movable within a plane that is parallel to the cantilever platform in both X-direction as well as Y-direction which is orthogonal to the X-direction.

Claims (11)

1. Jack-up rig comprising:

a cantilever platform mounted on a buoyant hull;

at least two drilling assemblies disposed on the cantilever platform, wherein each of the drilling assemblies is movable relative to the cantilever platform and movable independently from the other drilling assembly or assemblies, respectively;

wherein each of the drilling assemblies is movable within a plane parallel to the cantilever platform in both X-direction (X) as well as Y-direction (Y) orthogonal to the X-direction (X);

wherein the drilling assemblies are provided on a skid system, wherein the skid system is provided on the cantilever platform, and wherein the skid system comprises:

XY-rails provided on the cantilever platform, wherein the XY-rails are arranged to form an array of rails;

at least two XY-support frames mounted on the XY-rails such that the XY-support frames can slide both directions in accordance with the respective directions of the XY-rails; and

one respective drilling support structure on each one of the XY-support frames.

2. The jack-up rig in accordance with claim 1 , wherein at least one further skid system is provided between each respective drilling support structure and respective XY-support frame configured to enable at least one extra translation degree-of-freedom.

3. The jack-up rig in accordance with claim 1 , further comprising respective skid-manipulators mounted for skidding.

4. The jack-up rig in accordance with claim 1 , wherein each drilling assembly comprises a drilling unit placed on the drilling support structure.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 7, 2023
From: NOV INTERNATIONAL HOLDINGS C.V.
To: GRANT PRIDECO, INC.
Reel/Frame 063888/0818 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 2, 2023
From: NATIONAL OILWELL VARCO NORWAY AS
To: NOV INTERNATIONAL HOLDINGS C.V.
Reel/Frame 064367/0415 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 13, 2018
From: PLANO, MARCO; BERGE, ROAR
To: NATIONAL OILWELL VARCO NORWAY AS,
Reel/Frame 047772/0471 →
Priority Claims (1)
EP 16176113 · Jun 24, 2016 · regional
Continuity (1)
Related Publication 20190136637A1 · May 9, 2019