IP Library Granted Patent US 10,389,107
Granted Patent B1
US 10,389,107 · App. 16/326,020 · Granted Aug 20, 2019

Protecting a transformer comprising a tap changer

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,389,107
App. No.
16/326,020
Granted
Aug 20, 2019
Kind
B1
Abstract

The invention is concerned with a protection device, method and computer program product for protecting a transformer including a tap changer and a transformer arrangement including a transformer and a protection device. The transformer has at least two magnetically coupled windings with terminals (MT 1 , MT 2 , MT 3 , MT 4 ) at which power enters and exits the transformer and a tap changer having impedance elements and a switch configured to gradually connect the impedance elements when changing between two tap changer positions during a tap changing operation. The method is performed in the protection device and includes: obtaining measurements of power transmission properties (Iin, Uin, Iout, Uout) at the magnetically coupled windings, estimating energy deposited in the impedance elements during a tap changing operation based on the measured physical properties, comparing the estimated deposited energy with a failure threshold, and protecting the transformer in case the threshold is exceeded, wherein the estimating of the deposited energy includes determining the power loss of the transformer between the terminals (MT 1 , MT 2 ) where power enters and the terminals (MT 3 , MT 4 ) where power leaves the transformer and integrating the power loss.

Claims (96)

1. A protection devices for protecting a transformer comprising a tap changer, said transformer having at least two magnetically coupled windings with terminals (MT 1 , MT 2 , MT 3 , MT 4 ) at which power enters and exits the transformer, and the tap changer having impedance elements (R 1 , R 2 ) and a switch configured to gradually connect the impedance elements when changing between two tap changer positions (P 1 , P 4 ) during a tap changing operation, the protection device including:

a control unit operative to

obtain measurements of power transmission properties (Iin, Uin, Iout, Uout) at the magnetically coupled windings,

estimate energy deposited in the impedance elements during a tap changing operation based on the measured power transmission properties,

compare the estimated deposited energy with a failure threshold, and

protect the transformer in case the threshold is exceeded,

wherein the control unit when estimating the deposited energy is further operative to determine the power loss of the transformer between the terminals (MT 1 , MT 2 ) where power enters and the terminals (MT 3 , MT 4 ) where power leaves the transformer and to integrate the power loss.

2. The protection device according to claim 1 , wherein the control unit is further operative to obtain an indication (TC_CTRL) of an imminent tap changing operation and to start comparing the estimated deposited energy with the failure threshold at the point in time at which the indication is obtained.

3. The protection device according to claim 1 , wherein the tap changers has a nominal peak duration energy deposition time (NPDT) and the control unit is operative to perform estimation of deposited energy in a time range Tint that exceeds the nominal peak duration energy deposition time.

4. The protection according to claim 3 , wherein the time range Tint is 10-100 times the nominal peak duration energy deposition time and preferably 25 times the nominal peak duration energy deposition time.

5. The protection device according to claim 3 , wherein the control unit is further operative to obtain an indication (TC_CTRL) of an imminent tap changing operation and to start comparing an estimated deposited energy with the failure threshold at the point in time at which the indication is obtained; and wherein the control unit when integrating is operative to employ the formula

s

s

+

t

s

*

Ploss

-

s

T

int

/

t

s

where s is the integrating result, t s is the sampling time instant, P loss the instantaneous power loss and Tint the integrating time scale.

6. The protection devices according to claim 1 , wherein the control unit is further operative to compare the estimated deposited energy with a regular operation threshold and indicate if the estimated deposited energy does not reach the regular operation threshold.

7. The protection device according to claim 1 , wherein the control unit is operating in real-time during operation of the transformer.

8. The protection device according to claim 2 , wherein the tap changer has a nominal peak duration energy deposition time (NPDT) and the control unit is operative to perform estimation of deposited energy in a time range Tint that exceeds the nominal peak duration energy deposition time.

9. The protection device according to claim 4 , wherein the control unit is further operative to obtain an indication (TC_CTRL) of an imminent tap changing operation and to start comparing the estimated deposited energy with the failure threshold at the point in time at which the indication is obtained; and wherein the control unit when integrating is operative to employ the formula

s

<

-

s

+

t

s

*

Ploss

-

s

Tint

/

ts

where s is the integrating result, t s is the sampling time instant, Ploss the instantaneous power loss and Tint the integrating time scale.

10. The protection device according to claim 2 , wherein the control unit is further operative to compare the estimated deposited energy with a regular operation threshold and indicate if the estimated deposited energy does not reach the regular operation threshold.

11. The protection device according to claim 2 wherein the control unit is operating in real-time during operation of the transformer.

12. A method of protecting a transformers comprising a tap changer, said transformer having at least two magnetically coupled windings with terminals (MT 1 , MT 2 , MT 3 , MT 4 ) at which power enters and exits the transformer and the tap changer ( 16 ) having impedance elements (R 1 , R 2 ) and a switch configured to gradually connect the impedance elements when changing between two tap changer positions (P 1 , P 4 ) during a tap changing operation, the method being performed in a protection devices and including:

obtaining measurements of power transmission properties (Iin, Uin, Iout, Uout) at the magnetically coupled windings,

estimating energy deposited in the impedance elements during a tap changing operation based on the measured physical properties,

comparing the estimated deposited energy with a failure threshold, and

protecting the transformer in case the threshold is exceeded,

wherein the estimating of the deposited energy includes determining the power loss of the transformer between the terminals (MT 1 , MT 2 ) where power enters and the terminals (MT 3 , MT 4 ) where power leaves the transformer and integrating the power loss.

13. The method according to claim 12 , further comprises obtaining an indication (TC_CTRL) of an imminent tap changing operation and the comparing of the estimated deposited energy with the failure threshold is made starting from the point in time at which the indication is obtained.

14. The method according to claim 13 , wherein the tap changer has a nominal peak duration energy deposition time (NPDT) and the estimating of deposited energy is performed in a time range Tint that exceeds the nominal peak duration energy deposition time.

15. The method according to claim 14 , wherein the integrating time Tint is 10-100 times the nominal peak duration energy deposition time and preferably 25 times the nominal peak duration time (NPDT).

16. The method according to claim 14 , wherein the integrating is performed employing

s

s

+

t

s

*

Ploss

-

s

T

int

/

t

s

where s is the integrating result, t s is the sampling time instant, Ploss the instantaneous power loss and Tint the integrating time scale.

17. The method according to claim 15 , wherein the integrating is performed employing

s

s

+

t

s

*

Ploss

-

s

T

int

/

t

s

where s is the integrating result, t s is the sampling time instant, Ploss the instantaneous power loss and Tint the integrating time scale.

18. A computer program product for protecting a transformer comprising a tap changer, said transformer having at least two magnetically coupled windings with terminals (MT 1 , MT 2 , MT 3 , MT 4 ) at which power enters and exits the transformer and the tap changer having impedance elements (R 1 , R 2 ) and a switch configured to gradually connect the impedance elements when changing between two tap changer positions (P 1 , P 4 ) during a tap changing operation, the computer program product including a data carrier with computer program code configured to cause a control unit of a protection device to

obtain measurements of power transmission properties (Iin, Uin, Iout, Uout) at the magnetically coupled windings,

estimate energy deposited in the impedance elements during a tap changing operation based on the measured physical properties,

compare the estimated deposited energy with a failure threshold, and protect the transformer in case the threshold is exceeded,

wherein the estimating of the deposited energy includes determining the power loss of the transformer between the terminals (MT 1 , MT 2 ) where power enters and the terminals (MT 3 , MT 4 ) where power leaves the transformer and integrating the power loss.

Assignments (4)
MERGER Recorded Nov 13, 2023
From: HITACHI ENERGY SWITZERLAND AG
To: HITACHI ENERGY LTD
Reel/Frame 065549/0576 →
CHANGE OF NAME Recorded Dec 31, 2021
From: ABB POWER GRIDS SWITZERLAND AG
To: HITACHI ENERGY SWITZERLAND AG
Reel/Frame 058666/0540 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 6, 2020
From: ABB SCHWEIZ AG
To: ABB POWER GRIDS SWITZERLAND AG
Reel/Frame 052916/0001 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 11, 2019
From: BENGTSSON, TORD; ABEYWICKRAMA, NILANGA
To: ABB SCHWEIZ AG
Reel/Frame 048557/0603 →