IP Library Granted Patent US 11,441,211
Granted Patent B2
US 11,441,211 · App. 16/328,906 · Granted Sep 13, 2022

Method for producing alloy steel

Inventors: Woong Hee Han (Gwangyang-si, KR); Chong Tae Ahn (Gwangyang-si, KR); Soo Chang Kang (Gwangyang-si, KR); Jun Jeong Beak (Gwangyang-si, KR); Min Ho Song (Gwangyang-si, KR)
Assignee: POSCO
C22C33/04C22C33/06C22C38/04C21C7/076
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,441,211
App. No.
16/328,906
Granted
Sep 13, 2022
Kind
B2
Abstract

Provided is a method for producing alloy steel, the method comprising producing first alloy steel in a temperature holding furnace; maintaining the first alloy steel at a temperature of no lower than a melting point in the temperature holding furnace; and producing second alloy steel having an alloy content lower than the alloy content in the first alloy steel by melt mixing of the first alloy steel and molten steel. In the producing of the alloy steel, melting and storing of the ferroalloy are continuously performed, and thus, the temperature drop of the ferroalloy may be suppressed or prevented.

Claims (23)

1. A method for producing alloy steel, the method comprising:

producing first alloy steel in a temperature holding furnace shielded from the outside;

maintaining the first alloy steel at a temperature of no lower than a melting point in the temperature holding furnace;

preparing molten steel;

tapping the first alloy steel from the temperature holding furnace; and

producing second alloy steel having an alloy content lower than an alloy content in the first alloy steel by mixing the first alloy steel and the molten steel,

wherein the maintaining of the first alloy steel at the temperature of no lower than the melting point comprises: raising the alloy content in the first alloy steel more than the alloy content in the second alloy steel by performing at least once adding at least one of a solid ferroalloy and a molten ferroalloy into the first alloy steel; and removing nitrogen in the first alloy steel in the temperature holding furnace.

2. The method of claim 1 , wherein, in the maintaining of the first alloy steel at the temperature of no lower than the melting point, the alloy content in the first alloy steel is controlled to be greater than 25 wt % and no greater than 50 wt %.

3. The method of claim 2 , wherein at least anyone of the producing of the first alloy steel and the maintaining of the first alloy steel at the temperature of no lower than the melting point comprises: supplying the temperature holding furnace with a heat source.

4. The method of claim 3 , wherein

the producing of the second alloy steel comprises mixing fourth alloy steel which is produced by adding, into the second molten steel, at least any one of a solid ferroalloy and a molten ferroalloy in the tapping of the completely refined second molten steel, and

an alloy content in the fourth alloy steel is lower than the alloy content in the first alloy steel.

5. The method of claim 1 , wherein the producing of the first alloy steel in the temperature holding furnace comprises:

charging first molten steel in the temperature holding furnace; and

adding at least any one of a solid ferroalloy and a molten ferroalloy into the first molten steel.

6. The method of claim 5 , wherein

the charging of the first molten steel into the temperature holding furnace comprises introducing, into the temperature holding furnace, slag to be positioned on a melt surface of the first molten steel, and

in the maintaining of the first alloy steel at the temperature of no lower than the melting point, a slag layer is formed on the melt surface of the first alloy steel by using the slag.

7. The method of claim 1 , wherein the producing of the first alloy steel in the temperature holding furnace comprises:

tapping completely refined first molten steel;

adding, into the first molten steel, at least any one of a solid ferroalloy and a molten ferroalloy and producing third alloy steel;

charging the third alloy steel into the temperature holding furnace; and

adding, into the third alloy steel, at least any one of a solid ferroalloy and a molten ferroalloy and producing first alloy steel having an alloy content more than an alloy content in the third alloy steel.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 26, 2022
From: POSCO HOLDINGS INC.
To: POSCO CO., LTD
Reel/Frame 061778/0785 →
CHANGE OF NAME Recorded Sep 28, 2022
From: POSCO
To: POSCO HOLDINGS INC.
Reel/Frame 061561/0923 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 27, 2019
From: HAN, WOONG HEE; AHN, CHONG TAE; KANG, SOO CHANG; BEAK, JUN JEONG; SONG, MIN HO
To: POSCO
Reel/Frame 048455/0290 →
Priority Claims (1)
KR 10-2016-0110210 · Aug 29, 2016 · national
Continuity (1)
Related Publication 20190211425A1 · Jul 11, 2019