IP Library Granted Patent US 10,697,369
Granted Patent B2
US 10,697,369 · App. 16/346,328 · Granted Jun 30, 2020

Method for shutting down a gas turbine and a steam turbine of a combined cycle power plant at the same time

Inventors: Marc Borowski (Moers, DE); Edwin Gobrecht (Ratingen, DE); Matthias Heue (Bochum, DE); Matthias Migl (Munich, DE); Erich Schmid (Nuremberg, DE)
Assignee: Siemens Aktiengesellschaft
F02C6/04F01D13/00F01D21/12F01K13/02F02C9/00F05D2270/11Y02E20/16
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,697,369
App. No.
16/346,328
Granted
Jun 30, 2020
Kind
B2
Abstract

A method for operating a combined cycle power plant, wherein the combined cycle power plant has a gas turbine and a steam turbine and also a shutting-down device, and wherein, for shutting down the gas turbine and the steam turbine, the gas turbine and the steam turbine are operated within a time window that extends from the beginning of the shutting-down procedure at a first time to the falling of the steam temperature to a lower limit value at a second time by the shutting device in such a way that the gas turbine and the steam turbine are relieved substantially at the same time and the block power falls to zero, thermal energy that is stored in the combined cycle power plant preventing immediate falling of a steam temperature to operation below a minimum power output of the gas turbine within the time window.

Claims (9)

1. A method for shutting down a combined cycle power plant, wherein the combined cycle power plant comprises a gas turbine and a steam turbine, the method comprising:

operating the gas turbine and the steam turbine within a time window that extends from a first time to a second time;

beginning a shutdown procedure of the combined cycle power plant at the first time;

decreasing a steam temperature during the time window such that the steam temperature reaches a lower limit value at the second time;

decreasing an output power of the gas turbine at the first time;

decreasing an output power of the steam turbine at the first time;

ceasing operation of the gas turbine at the second time such that the output power of the gas turbine is zero at the second time;

ceasing operation of the steam turbine at the second time such that the output power of the steam turbine is zero at the second time;

wherein ceasing operation of the gas turbine and ceasing operation of the steam turbine reduces an output power of the combined cycle power plant to zero.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 5, 2021
From: SIEMENS AKTIENGESELLSCHAFT
To: SIEMENS ENERGY GLOBAL GMBH & CO. KG
Reel/Frame 056501/0020 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 30, 2019
From: BOROWSKI, MARC; GOBRECHT, EDWIN; HEUE, MATTHIAS; MIGL, MATTHIAS; SCHMID, ERICH
To: SIEMENS AKTIENGESELLSCHAFT
Reel/Frame 049036/0069 →