IP Library Granted Patent US 11,125,449
Granted Patent B2
US 11,125,449 · App. 16/370,208 · Granted Sep 21, 2021

Systems and methods for transitioning between a cooling operating mode and a reheat operating mode

Inventors: Norman J. Blanton (Norman, OK); Stephen C. Wilson (Oklahoma City, OK); Paul S. Willmus (Norman, OK); Bradford G. Briley (Norman, OK)
Assignee: Johnson Controls Technology Company
F24F3/153F24F11/0008
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,125,449
App. No.
16/370,208
Granted
Sep 21, 2021
Kind
B2
Abstract

A heating, ventilation, and/or air conditioning (HVAC) system, includes a cooling circuit, a reheat circuit, and a control system. The cooling circuit includes a condenser, a compressor, an evaporator, and a multi-directional valve, and the HVAC system is configured to circulate refrigerant through the cooling circuit in a cooling operating mode. The reheat circuit includes a reheat heat exchanger, the compressor, the evaporator, and the multi-directional valve, and the HVAC system is configured to circulate refrigerant through the reheat circuit in a reheat operating mode. The control system is configured to execute a switch between the cooling operating mode and the reheat operating mode by sending a signal to the multi-directional valve to adjust from a first position to a second position, interrupting a voltage provided to the compressor at a first time, and restoring application of the voltage to the compressor at a second time that is subsequent to the first time.

Claims (34)

1. A heating, ventilation, and/or air conditioning (HVAC) system, comprising:

a cooling circuit including a condenser, a compressor, an evaporator, and a multi-directional valve, wherein the HVAC system is configured to circulate refrigerant through the cooling circuit in a cooling operating mode;

a reheat circuit including a reheat heat exchanger, the compressor, the evaporator, and the multi-directional valve, wherein the HVAC system is configured to circulate refrigerant through the reheat circuit in a reheat operating mode; and

a control system configured to execute a switch between the cooling operating mode and the reheat operating mode by sending a signal to the multi-directional valve to adjust from a first position to a second position, interrupting a voltage provided to the compressor while sending the signal to the multidirectional valve, after sending the signal to the multi-directional valve, or both, and restoring application of the voltage to the compressor subsequent to interrupting the voltage.

2. The HVAC system of claim 1 , wherein the control system includes a time delay relay configured to execute a time delay and to restore application of the voltage to the compressor after the time delay.

3. The HVAC system of claim 2 , wherein the time delay relay is external to a main controller of the control system.

4. The HVAC system of claim 2 , wherein the time delay relay is integral to a main controller of the control system.

5. The HVAC system of claim 2 , wherein the time delay is between twenty seconds and ten minutes.

6. The HVAC system of claim 1 , wherein the control system is configured to interrupt the voltage provided to the compressor based on the signal.

7. The HVAC system of claim 1 , wherein the voltage is a first voltage, wherein the HVAC system includes a recovery circuit extending between the condenser and the compressor and including a recovery valve, and wherein the control system is configured to execute the switch by interrupting or providing a second voltage to the recovery valve.

8. The HVAC system of claim 7 , comprising an additional recovery circuit extending between the reheat heat exchanger and the compressor and including an additional recovery valve, wherein the control system is configured to execute the switch by interrupting or providing a third voltage to the additional recovery valve.

9. The HVAC system of claim 7 , wherein the control system is configured to interrupt or provide the second voltage to open the recovery valve to direct refrigerant from the cooling circuit or the reheat circuit to the recovery circuit.

10. The HVAC system of claim 1 , wherein the controller is configured to restore application of the voltage to the compressor subsequent to interrupting the voltage based on execution of a time delay.

11. The HVAC system of claim 10 , wherein the controller is configured to execute the time delay based on the signal sent to the multi-directional valve to adjust from the first position to the second position.

12. A control system for a heating, ventilation, and/or air conditioning (HVAC) system, wherein the control system comprises:

a multi-directional valve configured to receive refrigerant from a compressor of the HVAC system and configured to actuate to direct refrigerant through a cooling circuit of the HVAC system in a cooling operating mode and through a reheat circuit of the HVAC system in a reheat operating mode; and

a controller configured to:

send a signal to actuate the multi-directional valve to switch from the cooling operating mode to the reheat operating mode;

interrupt a voltage provided to the compressor based on the signal;

execute a time delay based on the signal; and

restore application of the voltage to the compressor after execution of the time delay.

13. The control system of claim 12 , wherein the multi-directional valve is configured to between from the cooling operating mode to the reheat operating mode prior to expiration of the time delay.

14. The control system of claim 12 , wherein the controller is configured to send the signal based upon a determination that a humidity measurement of a conditioned space serviced by the HVAC system exceeds a humidity set point.

15. The control system of claim 12 , wherein the time delay is between one minute and three minutes.

16. The control system of claim 12 , wherein the voltage is a first voltage, and the controller is configured to interrupt or provide a second voltage to a recovery valve to enable recovery of refrigerant from the cooling circuit or the reheat circuit.

17. The control system of claim 16 , wherein the controller is configured to interrupt or provide the second voltage based on the signal.

18. A heating, ventilation, and/or air conditioning (HVAC) system, comprising:

a cooling circuit including a condenser, a compressor, an evaporator, and a multi-directional valve, wherein the HVAC system is configured to circulate refrigerant through the cooling circuit in a cooling operating mode;

a reheat circuit including a reheat heat exchanger, the compressor, the evaporator, and the multi-directional valve, wherein the HVAC system is configured to circulate refrigerant through the reheat circuit in a reheat operating mode; and

a control system configured to make a determination to transition operation of the HVAC system from the cooling operating mode to the reheat operating mode, wherein the control system is configured to send a signal to the multi-directional valve to adjust from a first position to a second position based on the determination, interrupt a voltage provided to the compressor based on the determination and based on sending the signal to the multi-directional valve, execute a time delay based on the determination, and restore application of the voltage to the compressor at a conclusion of the time delay.

19. The HVAC system of claim 18 , wherein the control system is configured to execute the time delay based on interruption of the voltage provided to the compressor.

20. The HVAC system of claim 18 , wherein the control system is configured to execute the time delay based on the signal.

21. The HVAC system of claim 18 , comprising a time delay relay configured to execute the time delay.

22. The HVAC system of claim 18 , wherein the control system is configured to make the determination based on an indication that a humidity measurement of a conditioned space serviced by the HVAC system is above a humidity set point, and wherein the determination includes a determination to transition from the cooling operating mode to the reheat operating mode.

Assignments (5)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 30, 2025
From: JOHNSON CONTROLS TECHNOLOGY COMPANY
To: JOHNSON CONTROLS TYCO IP HOLDINGS LLP
Reel/Frame 072298/0096 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 24, 2025
From: TYCO FIRE & SECURITY GMBH
To: JOHNSON CONTROLS LIGHT COMMERCIAL IP GMBH
Reel/Frame 070179/0435 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 24, 2024
From: JOHNSON CONTROLS TYCO IP HOLDINGS LLP
To: TYCO FIRE & SECURITY GMBH
Reel/Frame 067832/0947 →
NUNC PRO TUNC ASSIGNMENT Recorded Feb 4, 2022
From: JOHNSON CONTROLS TECHNOLOGY COMPANY
To: JOHNSON CONTROLS TYCO IP HOLDINGS LLP
Reel/Frame 058959/0764 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 6, 2019
From: BLANTON, NORMAN J.; WILSON, STEPHEN C.; WILLMUS, PAUL S.; BRILEY, BRADFORD G.
To: JOHNSON CONTROLS TECHNOLOGY COMPANY
Reel/Frame 049094/0265 →