IP Library Granted Patent US 10,917,892
Granted Patent B2
US 10,917,892 · App. 16/375,159 · Granted Feb 9, 2021

Method for performing bandwidth part switching by a user equipment

Inventors: Yoonoh Yang (Seoul, KR); Sangwook Lee (Seoul, KR); Suhwan Lim (Seoul, KR); Manyoung Jung (Seoul, KR); Jinyup Hwang (Seoul, KR)
Assignee: LG Electronics Inc.
H04W72/0453H04W84/042
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,917,892
App. No.
16/375,159
Granted
Feb 9, 2021
Kind
B2
Abstract

The present invention discloses a method of performing Bandwidth Part (BWP) switching by a user equipment (UE). The method comprises scheduling to receive a Synchronization Signal Block (SSB) during a first period; determining whether to perform the BWP switching based on the first period and a second period representing time duration for performing the BWP switching; and when the first period and the second period do not overlap, performing the BWP switching.

Claims (39)

1. A method of performing Bandwidth Part (BWP) switching by a user equipment (UE), the method comprising:

scheduling to receive a Synchronization Signal Block (SSB) during a first period;

determining whether to perform the BWP switching based on the first period and a second period representing a time duration for performing the BWP switching; and

based on that the first period and the second period do not overlap, performing the BWP switching,

wherein a starting point of the BWP switching is earlier than a starting point of receiving the SSB by at least the second period.

2. The method of claim 1 , further comprising receiving, from a base station, a request for the BWP switching,

wherein the UE determines whether to perform the BWP switching based on the request.

3. The method of claim 1 , further comprising driving a timer for the BWP switching,

wherein the UE determines whether to perform the BWP switching based on the timer.

4. The method of claim 1 , wherein based on the first period and the second period overlapping, the BWP switching is not performed.

5. A user equipment (UE) configured to perform Bandwidth Part (BWP) switching, the UE comprising:

a transceiver; and

a processor configured to control the transceiver,

wherein the processor is further configured to:

schedule to receive a Synchronization Signal Block (SSB) during a first period;

determine whether to perform the BWP switching based on the first period and a second period representing a time duration for performing the BWP switching; and

perform the BWP switching based on that the first period and the second period do not overlap,

wherein a timing to start the BWP switching is earlier than a timing to start receiving the SSB by at least the second period.

6. The UE of claim 5 , wherein the processor is further configured to:

receive, from a base station through the transceiver, a request for the BWP switching, and

determine whether to perform the BWP switching based on the request.

7. The UE of claim 5 , wherein the processor is further configured to:

drive a timer for the BWP switching; and

determine whether to perform the BWP switching based on the timer.

8. The UE of claim 5 , wherein based on the first period and the second period overlapping, the BWP switching is not performed.

9. A processing apparatus configured to control a user equipment (UE) to perform Bandwidth Part (BWP) switching, the processing apparatus comprising:

at least one processor, and

at least one computer memory operably connected to the at least one processor and storing instructions that, based on being executed by the at least one processor, perform operations comprising:

scheduling to receive a Synchronization Signal Block (SSB) during a first period;

determining whether to perform the BWP switching based on the first period and a second period representing a time duration for performing the BWP switching; and

performing the BWP switching based on that the first period and the second period do not overlap,

wherein a timing to start the BWP switching is earlier than a timing to start receiving the SSB by at least the second period.

10. The processing apparatus of claim 9 , wherein the operations further comprise:

receiving, from a base station, a request for the BWP switching, and

determining whether to perform the BWP switching based on the request.

11. The processing apparatus of claim 9 , wherein the operations further comprise:

driving a timer for the BWP switching; and

determining whether to perform the BWP switching based on the timer.

12. The processing apparatus of claim 9 , wherein based on the first period and the second period overlapping, the BWP switching is not performed.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 28, 2020
From: YANG, YOONOH; LEE, SANGWOOK; LIM, SUHWAN; JUNG, MANYOUNG; HWANG, JINYUP
To: LG ELECTRONICS INC.
Reel/Frame 052777/0150 →
Priority Claims (1)
KR 10-2018-0039234 · Apr 4, 2018 · national
Continuity (1)
Related Publication 20190313410A1 · Oct 10, 2019