IP Library Granted Patent US 10,873,329
Granted Patent B2
US 10,873,329 · App. 16/385,020 · Granted Dec 22, 2020

High reliability AC load switching circuit

Inventors: Yuequan Hu (Cary, NC); Amruteshwar Hiremath (Morrisville, NC); Kory A. Liszt (Apex, NC)
Assignee: Ideal Industries Lighting LLC
H03K17/68H02H9/002H03K2217/0009
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,873,329
App. No.
16/385,020
Granted
Dec 22, 2020
Kind
B2
Abstract

A high reliability AC load switching circuit is disclosed. In some embodiments, the AC load switching circuit includes a high-speed switch connected between the load and the voltage source, a cutoff switch connected between the load and the voltage source in parallel with the high-speed switch, and a level detector connected to the voltage source and to a control input of the high-speed switch. The high-speed switch may be a solid-state switch, for example, a TRIAC or a bidirectional switch, and the cutoff switch may be an electromechanical switch, for example, a relay. In some embodiments a snubber is connected in parallel with a solid-state switch. In some embodiments a microcontroller is connected to an electromechanical switch and the level detector. In some embodiments, both a first cutoff switch and a second cutoff switch are used.

Claims (31)

1. A switching circuit to selectively connect a load to a voltage source, the switching circuit comprising:

a high-speed switch connected between the load and the voltage source;

a snubber connected in parallel with the high-speed switch;

a cutoff switch connected between the load and the voltage source in parallel with the high-speed switch;

a level detector and control circuit connected to the voltage source and to a control input of the high-speed switch, wherein the control input is further connected to a portion of the switching circuit that is between the load and an output of the high-speed switch and between the load and an output of the cutoff switch; and

a controller comprising a first enabling input connected to the level detector and control circuit and a second enabling input connected to the cutoff switch, the controller further comprising a processor and memory storing at least one of firmware and software that is executable such that: the first enabling input is activated in response to a powering on signal received from the controller and the level detector and control circuit turns on the high-speed switch at a zero crossing of the voltage source, and the second enabling input is activated independent of the operation of the high-speed switch after the high-speed switch is turned on to turn on the cutoff switch, the high-speed switch remaining turned on after the cutoff switch is turned on.

2. The switching circuit of claim 1 wherein the high-speed switch comprises a solid-state switch.

3. The switching circuit of claim 2 wherein the solid-state switch comprises a triode for alternating current (TRIAC).

4. The switching circuit of claim 2 wherein the solid-state switch comprises bidirectional switch.

5. The switching circuit of claim 1 wherein the cutoff switch comprises an electromechanical switch and further comprising:

a transistor connected to the controller; and

a resistor connected between the transistor and the electromechanical switch.

6. The switching circuit of claim 1 further comprising a second cutoff switch connected in series with the high-speed switch.

7. The switching circuit of claim 6 wherein the cutoff switch, the second cutoff switch, or both the cutoff switch and the second cutoff switch each comprise an electromechanical switch.

8. The switching circuit of claim 7 wherein the electromechanical switch comprises a relay.

9. The switching circuit of claim 6 wherein the second cutoff switch is connected between the high-speed switch and the voltage source.

10. The switching circuit of claim 6 wherein the second cutoff switch is connected between the high-speed switch and the load.

11. A method of selectively connecting a load to an AC voltage through a switching circuit comprising a controller comprising a first enabling input connected to a level detector and control circuit and a second enabling input connected to a cutoff switch, the controller further comprising a processor and memory storing at least one of firmware and software, the method comprising:

activating the first enabling input from the controller in response to a powering on signal received from the controller to thereby enable the level detector and control circuit to turn on a solid-state switch between the AC voltage and the load at zero-crossing of the AC voltage;

suppressing voltage spikes and/or dampening ringing to prevent misfiring of the solid-state switch using a snubber connected in parallel with the solid-state switch; and

activating a second enabling input from the controller to close a first electromechanical switch connected in parallel with the solid-state switch independent of the operation of the solid-state switch after the turning on of the solid-state switch to turn on the cutoff switch, maintaining the solid-state switch turned on after the cutoff switch is turned on using a control input of the solid-state switch that is connected between the load and an output of the solid-state switch and between the load and an output of the cutoff switch.

12. The method of claim 11 further comprising:

in response to a powering off signal received by the controller, deactivating the first electromechanical switch; and

turning off the solid-state switch after deactivating the first electromechanical switch.

13. The method of claim 11 further comprising activating a second electromechanical switch connected in series with the solid-state switch prior to turning on the solid-state switch and in response to activation of the switching circuit.

14. The method of claim 13 further comprising:

deactivating the first electromechanical switch;

turning off the solid-state switch; and

deactivating the second electromechanical switch.

15. The method of claim 11 wherein the solid-state switch comprises bidirectional switch.

16. The switching circuit of claim 1 wherein the high-speed switch is configured to remain turned on for an entire duration that the cutoff switch is turned on.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 22, 2026
From: LUMEN ACQUISITION HOLDINGS, LLC
To: LED-IP MANAGEMENT, LLC
Reel/Frame 075624/0358 →
SECURITY INTEREST Recorded Sep 13, 2023
From: IDEAL INDUSTRIES LIGHTING LLC
To: FGI WORLDWIDE LLC
Reel/Frame 064897/0413 →