IP Library Granted Patent US 11,221,156
Granted Patent B2
US 11,221,156 · App. 16/389,731 · Granted Jan 11, 2022

Central plant control system with decaying capacity adjustment

Inventors: Graeme Willmott (West Milwaukee, WI); Matthew J. Asmus (Watertown, WI); Jared W. Fread (Milwaukee, WI); Ryan C. Beaty (Milwaukee, WI); Shawn A. Schlagenhaft (Fond du Lac, WI)
Assignee: Johnson Controls Tyco IP Holdings LLP
F24F11/38F24F11/64F24F11/65G05B19/042F24F2140/00F24F2140/60G05B2219/2614
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,221,156
App. No.
16/389,731
Granted
Jan 11, 2022
Kind
B2
Abstract

Disclosed herein are related to a method, a system, and a non-transitory computer readable medium storing instructions for operating a group of central plant equipment to serve thermal energy loads of a building or building system. In one approach, a base capacity of one or more devices of the group of central plant equipment is identified. A change in requested load allocated to the one or more devices crossing the base capacity at a crossover time may be detected. In one approach, an adjusted capacity of the one or more devices is set such that the adjusted capacity is offset from the base capacity before the crossover time and decays toward the base capacity during a decay period after the crossover time. The requested load allocated may be compared with the adjusted capacity after the crossover time. The group of central plant equipment may be operated according to the comparison.

Claims (42)

1. A method for operating a group of central plant equipment to serve thermal energy loads of a building or building system, the method comprising:

identifying a base capacity of one or more devices of the group of central plant equipment;

detecting a change in requested load allocated to the one or more devices crossing the base capacity at a crossover time;

setting an adjusted capacity of the one or more devices such that the adjusted capacity is offset from the base capacity before the crossover time and decays toward the base capacity during a decay period after the crossover time;

comparing the requested load allocated to the one or more devices with the adjusted capacity after the crossover time; and

operating the group of central plant equipment based on whether the requested load allocated to the one or more devices is above or below the adjusted capacity.

2. The method of claim 1 , wherein setting the adjusted capacity of the one or more devices includes linearly decaying the adjusted capacity toward the base capacity during the decay period.

3. The method of claim 1 , wherein setting the adjusted capacity of the one or more devices includes non-linearly decaying the adjusted capacity toward the base capacity during the decay period.

4. The method of claim 1 , wherein setting the adjusted capacity of the one or more devices includes offsetting the adjusted capacity prior to the crossover time to be higher than the base capacity, and decreasing the adjusted capacity toward the base capacity during the decay period.

5. The method of claim 4 , wherein operating the group of central plant equipment includes:

activating a device of the one or more devices, in response to the adjusted capacity dropping below the requested load.

6. The method of claim 1 , wherein setting the adjusted capacity of the one or more devices includes offsetting the adjusted capacity prior to the crossover time to be lower than the base capacity, and increasing the adjusted capacity toward the base capacity during the decay period.

7. The method of claim 6 , wherein operating the group of central plant equipment includes:

deactivating a device of the one or more devices, in response to the adjusted capacity rising above the requested load.

8. A non-transitory computer readable medium for operating a group of central plant equipment to serve thermal energy loads of a building or building system, the non-transitory computer readable medium storing instructions when executed by a processor cause the processor to:

identify a base capacity of one or more devices of the group of central plant equipment;

detect a change in requested load allocated to the one or more devices crossing the base capacity at a crossover time;

set an adjusted capacity of the one or more devices such that the adjusted capacity is offset from the base capacity before the crossover time and decays toward the base capacity during a decay period after the crossover time;

compare the requested load allocated to the one or more devices with the adjusted capacity after the crossover time; and

operate the group of central plant equipment based on whether the requested load allocated to the one or more devices is above or below the adjusted capacity.

9. The non-transitory computer readable medium of claim 8 , wherein the instructions when executed by the processor cause the processor to set the adjusted capacity of the one or more devices further include instructions when executed by the processor cause the processor to linearly decay the adjusted capacity toward the base capacity during the decay period.

10. The non-transitory computer readable medium of claim 8 , wherein the instructions when executed by the processor cause the processor to set the adjusted capacity of the one or more devices further include instructions when executed by the processor cause the processor to non-linearly decay the adjusted capacity toward the base capacity during the decay period.

11. The non-transitory computer readable medium of claim 8 , wherein the instructions when executed by the processor cause the processor to set the adjusted capacity of the one or more devices further include instructions when executed by the processor cause the processor to offset the adjusted capacity prior to the crossover time to be higher than the base capacity, and decrease the adjusted capacity toward the base capacity during the decay period.

12. The non-transitory computer readable medium of claim 11 , wherein the instructions when executed by the processor cause the processor to operate the group of central plant equipment further include instructions when executed by the processor cause the processor to:

activate a device of the one or more devices, in response to the adjusted capacity dropping below the requested load.

13. The non-transitory computer readable medium of claim 8 , wherein the instructions when executed by the processor cause the processor to set the adjusted capacity of the one or more devices further include instructions when executed by the processor cause the processor to offset the adjusted capacity prior to the crossover time to be lower than the base capacity, and increase the adjusted capacity toward the base capacity during the decay period.

14. The non-transitory computer readable medium of claim 13 , wherein the instructions when executed by the processor cause the processor to operate the group of central plant equipment further include instructions when executed by the processor cause the processor to:

deactivate a device of the one or more devices, in response to the adjusted capacity rising above the requested load.

15. A system for operating a group of central plant equipment to serve thermal energy loads of a building or building system, comprising:

a processor; and

a non-transitory computer readable medium storing instructions when executed by the processor cause the processor to:

identify a base capacity of one or more devices of the group of central plant equipment;

detect a change in requested load allocated to the one or more devices crossing the base capacity at a crossover time;

set an adjusted capacity of the one or more devices such that the adjusted capacity is offset from the base capacity before the crossover time and decays toward the base capacity during a decay period after the crossover time;

compare the requested load allocated to the one or more devices with the adjusted capacity after the crossover time; and

operate the group of central plant equipment based on whether the requested load allocated to the one or more devices is above or below the adjusted capacity.

16. The system of claim 15 , wherein the instructions when executed by the processor cause the processor to set the adjusted capacity of the one or more devices further include instructions when executed by the processor cause the processor to linearly decay the adjusted capacity toward the base capacity during the decay period.

17. The system of claim 15 , wherein the instructions when executed by the processor cause the processor to set the adjusted capacity of the one or more devices further include instructions when executed by the processor cause the processor to non-linearly decay the adjusted capacity toward the base capacity during the decay period.

18. The system of claim 15 , wherein the instructions when executed by the processor cause the processor to set the adjusted capacity of the one or more devices further include instructions when executed by the processor cause the processor to offset the adjusted capacity prior to the crossover time to be higher than the base capacity, and decrease the adjusted capacity toward the base capacity during the decay period.

19. The system of claim 18 , wherein the instructions when executed by the processor cause the processor to operate the group of central plant equipment further include instructions when executed by the processor cause the processor to:

activate a device of the one or more devices, in response to the adjusted capacity dropping below the requested load.

20. The system of claim 15 , wherein the instructions when executed by the processor cause the processor to set the adjusted capacity of the one or more devices further include instructions when executed by the processor cause the processor to offset the adjusted capacity prior to the crossover time to be lower than the base capacity, and increase the adjusted capacity toward the base capacity during the decay period.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 9, 2024
From: JOHNSON CONTROLS TYCO IP HOLDINGS LLP
To: TYCO FIRE & SECURITY GMBH
Reel/Frame 067056/0552 →
NUNC PRO TUNC ASSIGNMENT Recorded Feb 4, 2022
From: JOHNSON CONTROLS TECHNOLOGY COMPANY
To: JOHNSON CONTROLS TYCO IP HOLDINGS LLP
Reel/Frame 058959/0764 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 4, 2019
From: WILLMOTT, GRAEME; ASMUS, MATTHEW J.; FREAD, JARED W.; BEATY, RYAN C.; SCHLAGENHAFT, SHAWN A.
To: JOHNSON CONTROLS TECHNOLOGY COMPANY
Reel/Frame 049365/0962 →