IP Library Granted Patent US 11,765,729
Granted Patent B2
US 11,765,729 · App. 16/412,299 · Granted Sep 19, 2023

Uplink channel transmission in dual connectivity

Inventors: Seunghee Han (San Jose, CA); Youn Hyoung Heo (Seoul, KR); Yujian Zhang (Beijing, CN); Hong He (Sunnyvale, CA)
Assignee: APPLE INC.
H04W72/21H04W16/32H04W52/146H04W52/281H04W52/346H04W52/367H04W72/569H04L1/1887H04L5/0055H04W52/325
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,765,729
App. No.
16/412,299
Granted
Sep 19, 2023
Kind
B2
Abstract

Technology for dual connectivity is disclosed. A user equipment (UE) can identify a first physical channel that includes a first uplink control information (UCI) and a second physical channel that includes a second UCI. The UE can select a priority level for the first physical channel and a priority level for the second physical channel. The UE can apply power scaling to a first physical channel transmission or a second physical channel transmission if a total transmit power of the UE would exceed a specific value during a period of time. The UE can scale a transmit power for the second physical channel if the priority level for the first physical channel is higher than the priority level for the second physical channel depending on a type of first UCI and a type of second UCI.

Claims (36)

1. A user equipment (UE) configured for dual connectivity, the UE having one or more processors configured to:

identify a physical random access channel (PRACH) of a Master Cell Group (MCG);

identify a physical uplink control channel (PUCCH) of a Secondary Cell Group (SCG);

select a priority level for the PRACH of the MCG and a priority level for the PUCCH of the SCG, wherein the priority level for the PRACH and the priority level for the PUCCH is determined based on one of: a cell index, a cell group, a quality of service (QoS) or a service type associated with the PRACH and the PUCCH; and

drop one of the PRACH or the PUCCH when the PRACH and the PUCCH are scheduled to be transmitted in an overlapping time period and a total transmit power of the UE would exceed a specific value, wherein the PRACH or the PUCCH is dropped based on the priority level for the PRACH of the MCG relative to the priority level for the PUCCH of the SCG and a remaining PRACH or PUCCH is transmitted from the UE.

2. The UE of claim 1 , wherein the one or more processors are further configured to:

transmit the PRACH to a primary cell (PCell) or a secondary cell (SCell) of the MCG; or

transmit the PUCCH to a special secondary cell (SCell) of the SCG.

3. The UE of claim 1 , wherein the one or more processors are further configured to:

drop the PRACH when the priority level for the PRACH is less than the priority level for the PUCCH; or

drop the PUCCH when the priority level for the PRACH is greater than the priority level for the PUCCH.

4. The UE of claim 1 , wherein the specific value is configured as a maximum transmit power (PcMAX) such that the total transmit power for the PRACH and the PUCCH shall not exceed the specific value on an overlapping time period.

5. A method of a user equipment (UE) configured for dual connectivity, comprising:

identifying a physical random access channel (PRACH) of a Master Cell Group (MCG);

identifying a physical uplink control channel (PUCCH) of a Secondary Cell Group (SCG);

selecting a priority level for the PRACH of the MCG and a priority level for the PUCCH of the SCG, wherein the priority level for the PRACH and the priority level for the PUCCH is determined based on one of: a cell index, a cell group, a quality of service (QoS) or a service type associated with the PRACH and the PUCCH; and

dropping one of the PRACH or the PUCCH when the PRACH and the PUCCH are scheduled to be transmitted in an overlapping time period and a total transmit power of the UE would exceed a specific value, wherein the PRACH or the PUCCH is dropped based on the priority level for the PRACH of the MCG relative to the priority level for the PUCCH of the SCG and a remaining PRACH or PUCCH is transmitted from the UE.

6. The method of claim 5 , further comprising:

transmitting the PRACH to a primary cell (PCell) or a secondary cell (SCell) of the MCG; or

transmitting the PUCCH to a special secondary cell (SCell) of the SCG.

7. The method of claim 5 , further comprising:

dropping the PRACH when the priority level for the PRACH is less than the priority level for the PUCCH; or

dropping the PUCCH when the priority level for the PRACH is greater than the priority level for the PUCCH.

8. The method of claim 5 , wherein the specific value is configured as a maximum transmit power (PcMAX) such that the total transmit power for the PRACH and the PUCCH shall not exceed the specific value on an overlapping time period.

9. A non-transitory computer-readable medium comprising instructions to cause a user equipment (UE) configured for dual connectivity, upon execution of the instructions by one or more processors of the UE to:

identify a physical random access channel (PRACH) of a Master Cell Group (MCG);

identify a physical uplink control channel (PUCCH) of a Secondary Cell Group (SCG);

select a priority level for the PRACH of the MCG and a priority level for the PUCCH of the SCG, wherein the priority level for the PRACH and the priority level for the PUCCH is determined based on one of: a cell index, a cell group, a quality of service (QoS) or a service type associated with the PRACH and the PUCCH; and

drop one of the PRACH or the PUCCH when the PRACH and the PUCCH are scheduled to be transmitted in an overlapping time period and a total transmit power of the UE would exceed a specific value, wherein the PRACH or the PUCCH is dropped based on the priority level for the PRACH of the MCG relative to the priority level for the PUCCH of the SCG and a remaining PRACH or PUCCH is transmitted from the UE.

10. The non-transitory computer-readable medium of claim 9 , further comprising instructions to cause the UE to:

transmit the PRACH to a primary cell (PCell) or a secondary cell (SCell) of the MCG; or

transmit the PUCCH to a special secondary cell (SCell) of the SCG.

11. The non-transitory computer-readable medium of claim 9 , further comprising instructions to cause the UE to:

drop the PRACH when the priority level for the PRACH is less than the priority level for the PUCCH; or

drop the PUCCH when the priority level for the PRACH is greater than the priority level for the PUCCH.

12. The non-transitory computer-readable medium of claim 9 , wherein the specific value is configured as a maximum transmit power (PcMAX) such that the total transmit power for the PRACH and the PUCCH shall not exceed the specific value on an overlapping time period.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 20, 2020
From: INTEL CORPORATION
To: APPLE INC.
Reel/Frame 052916/0308 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 19, 2019
From: HAN, SEUNGHEE; HEO, YOUN HYOUNG; ZHANG, YUJIAN; HE, HONG
To: INTEL CORPORATION
Reel/Frame 049808/0766 →