IP Library Granted Patent US 10,844,562
Granted Patent B2
US 10,844,562 · App. 16/434,676 · Granted Nov 24, 2020

Deployment apparatus having a tether arm for an inspection vehicle

Inventors: Gregory A. Cole (West Hartford, CT); William J. Eakins (Bloomfield, CT); Daniel T. Lasko (Bloomfield, CT); Harshang Shah (Bloomfield, CT); Thomas A. Fuhlbrigge (Ellington, CT); Luiz V. Cheim (Raleigh, NC); Poorvi Patel (Ballwin, MO); Biao Zhang (West Hartford, CT); Gregory F. Rossano (Enfield, CT); Saumya Sharma (Hartford, CT); Sangeun Choi (Simsbury, CT)
Assignee: ABB POWER GRIDS SWITZERLAND AG
E02B3/062F03B13/10E02B15/04E02B2017/0095
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,844,562
App. No.
16/434,676
Granted
Nov 24, 2020
Kind
B2
Abstract

A deployment system for an inspection vehicle operable in a housing having a liquid medium is disclosed in the present application. The deployment system includes a mount connectable to the housing through an aperture formed in a wall thereof. An extendable arm is connected to the mount and positioned within the housing. A tether is slidably coupled to the extendable arm and adapted to connect with the inspection vehicle. A control mechanism is operable to control deployment of the tether and the position of the extendable arm.

Claims (38)

1. A deployment apparatus for a submersible inspection vehicle comprising:

a rotatable mount connectable to a housing that is configured to hold a liquid;

an extendable arm connected to the rotatable mount; and

a tether slidably coupled to the extendable arm and adapted to connect with the submersible inspection vehicle during operation,

wherein the submersible inspection vehicle is disposed within the housing and is configured to be deployed via the extendable arm.

2. The deployment apparatus of claim 1 , wherein the extendable arm includes a plurality of telescoping sections operable to extend and retract a distal end of the extendable arm.

3. The deployment apparatus of claim 1 , wherein the extendable arm includes a plurality of scissor jack links operable to extend and retract a distal end of the extendable arm.

4. The deployment apparatus of claim 1 , wherein the extendable arm includes a plurality of elongate articulating legs operable to move relative to one another.

5. The deployment apparatus of claim 4 further comprising a pivot joint connected between adjacent articulating legs.

6. The deployment apparatus of claim 5 , wherein the pivot joint is a spherical joint to permit angular rotation in any direction.

7. The deployment apparatus of claim 1 , further comprising an actuator system coupled to the extendable arm.

8. The deployment apparatus of claim 7 , wherein the actuator system includes at least one of an electronic actuator and a mechanical actuator.

9. The deployment apparatus of claim 7 , wherein the actuator system includes at least one of a pulley, a cable and a biasing member.

10. The deployment apparatus of claim 1 , wherein the mount is rotatable; and further comprising an electric motor operably coupled to the rotatable mount to control a position of the extendable arm.

11. The deployment apparatus of claim 1 , further comprising: a resting fixture adapted to engage with a wall of the housing; and an actuating rod extending through the resting fixture being operably connected to the extendable arm.

12. The deployment apparatus of claim 1 , further comprising a control system operable to release or retract the tether and control movement of the extendable arm during operation of the inspection vehicle.

13. The deployment apparatus of claim 1 , wherein the tether includes at least one of a mechanical, electrical and pneumatic connection operably coupled with the inspection vehicle.

14. A method for deploying an inspection vehicle within a housing at least partially filled with a liquid medium, the method comprising:

positioning a rotatable mount with an extendable arm proximate an access port located in a wall of the housing;

running, via a distal end of the extendable arm, a tether line between a control mechanism and the inspection vehicle;

rotating the arm with the rotatable mount to a desired angular location;

moving the distal end of the extendable arm to a desired distance from the rotatable mount; and

lowering the inspection vehicle into the liquid medium with the tether line.

15. The method of claim 14 further comprising sending control signals to the inspection vehicle through the tether line.

16. The method of claim 15 further comprising moving the vehicle through the liquid in response to the control signals.

17. The method of claim 16 further comprising moving the extendable arm in response to movement of the inspection vehicle.

18. The method of claim 14 , further comprising maneuvering the tether around components internal to the housing with the extendable arm.

19. A deployment system for an inspection vehicle comprising: a resting fixture configured to engage with a housing over an aperture formed in a wall of the housing; a mount extending from the resting fixture being configured to fit through the aperture; an extendable arm connected to the mount; a tether engaged along portions of the extendable arm, the tether connectable with the inspection vehicle; and a control mechanism operable to deploy the inspection vehicle from the extendable arm into a liquid medium within the housing.

20. The deployment system of claim 19 wherein the extendable arm includes a plurality of telescoping sections operable to extend and retract relative to the mount.

21. The deployment system of claim 19 , wherein the extendable arm includes a scissor jack mechanism to extend and retract relative to the mount.

22. The deployment system of claim 19 , wherein the extendable arm includes a plurality of elongate articulating legs.

23. The deployment system of claim 22 further comprising a pivot joint connected between adjacent articulating legs.

24. The deployment system of claim 19 , wherein the mount is rotatable relative to the housing.

25. The deployment system of claim 19 , further comprising an actuator system coupled to the extendable arm, the actuator system operable to move portions of the extendable arm.

26. The deployment system of claim 25 , wherein the actuator system includes at least one of an electronic actuator and a mechanical actuator.

27. The deployment system of claim 26 , wherein the electric actuator is one of a linear actuator and a rotating actuator.

28. The deployment system of claim 25 wherein the actuator system further comprises an actuator rod connected to the extendable arm.

29. The deployment system of claim 19 , wherein the control system is operable to move the extendable arm in response to movement of the inspection vehicle.

Assignments (4)
MERGER Recorded Nov 13, 2023
From: HITACHI ENERGY SWITZERLAND AG
To: HITACHI ENERGY LTD
Reel/Frame 065549/0576 →
CHANGE OF NAME Recorded Dec 31, 2021
From: ABB POWER GRIDS SWITZERLAND AG
To: HITACHI ENERGY SWITZERLAND AG
Reel/Frame 058666/0540 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 14, 2020
From: COLE, GREGORY A.; EAKINS, WILLIAM J.; LASKO, DANIEL T.; SHAH, HARSHANG; FUHLBRIGGE, THOMAS A.; CHEIM, LUIZ V.; PATEL, POORVI; ZHANG, BIAO; ROSSANO, GREGORY F.; SHARMA, SAUMYA; CHOI, SANGEUN
To: ABB SCHWEIZ AG
Reel/Frame 054052/0284 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 6, 2020
From: ABB SCHWEIZ AG
To: ABB POWER GRIDS SWITZERLAND AG
Reel/Frame 052916/0001 →