IP Library Granted Patent US 11,187,078
Granted Patent B2
US 11,187,078 · App. 16/477,981 · Granted Nov 30, 2021

Method for evaluating connectivity between a first well and a second well in a hydrocarbon production field and related system

Inventor: Pierre Thore (Pau, FR)
Assignee: TOTAL SA
E21B49/008G01N15/0826
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,187,078
App. No.
16/477,981
Granted
Nov 30, 2021
Kind
B2
Abstract

A method includes obtaining a first time series of a first well parameter from the first well and a second time series of a second well parameter from the second well, processing the first time series to obtain a processed first time series, filtering the second time series by removing dynamic variations from the second time series to obtain a filtered second time series representative of static variations of the second time series, and determining a correlation between the processed first time series and the filtered second time series at various time shifts between the processed first time series and the filtered second time series, and determining a maximal correlation coefficient and a time shift at maximal correlation between the processed first time series and the filtered second time series, the maximal correlation coefficient being representative of the connectivity between the first well and the second well.

Claims (34)

1. A method for evaluating connectivity between a first well and a second well in a hydrocarbon production field comprising:

obtaining a first time series of a first well parameter from the first well and a second time series of a second well parameter from the second well, wherein the second time series are obtained by a BHP gauge at a bottom of the second well,

processing the first time series to obtain a processed first time series,

filtering the second time series by removing dynamic variations from the second time series to obtain a filtered second time series representative of static variations of the second time series,

determining a correlation between said processed first time series and said filtered second time series at various time shifts between said processed first time series and said filtered second time series,

determining a maximal correlation coefficient and a time shift at maximal correlation between said processed first time series and said filtered second time series, the maximal correlation coefficient being representative of the connectivity between the first well and the second well, and

displaying, through a graphical user interface, the maximal correlation coefficient and the time shift at the maximal correlation on a geographical map indicating the connectivity between the first well and the second well.

2. The method according to claim 1 , wherein the first well parameter and the second well parameter are each chosen among bottom hole pressure, injection rate, fluid salinity or fluid temperature.

3. The method according to claim 1 , wherein the first well is an injection well or a production well and the second well is a production well.

4. The method according to claim 1 , wherein the filtering step comprises a sub-step of filtering the second time series to remove the dynamic variations from the second time series to obtain a corrected second time series, representative of the static variations of the second time series, the filtering being made with a non-linear filter.

5. The method according to claim 4 , wherein the non-linear filter is a median filter.

6. The method according to claim 1 , wherein the processing step and/or the filtering step comprise a sub-step of filtering a field depletion.

7. The method according to claim 6 , wherein the filtering step is made with a mean filter.

8. The method according to claim 1 , wherein the method further comprises a step of determining a confidence index of the connectivity between the first well and the second well.

9. The method according to claim 1 , wherein the method further comprises a step of mapping the maximal correlation coefficient and/or the time shift at maximal correlation in the hydrocarbon production field.

10. The method according to claim 1 , wherein the first well is an injection well and the first well parameter is an injection rate, the processing step comprising a sub-step of calculating a pressure time series at a given distance from the first well, from an injection rate time series of the first well.

11. The method according to claim 1 , wherein the first well is a production well and the processing step comprises a step of filtering the first well time series by removing dynamic variations from the first time series to obtain a corrected first time series representative of static variations of the first time series.

12. The method according to claim 1 , wherein the first well and the second well are production wells and the method further comprises calculating a first location curve of an injection well connected to the first well and to the second well, based on a time shift at maximal correlation between the first time series of the first well and the second time series of the second well.

13. The method according to claim 12 , wherein the method further comprises calculating a second location curve of the injection well connected to the first well and to the second well, based on a time shift at maximal correlation between the first time series of the first well and an additional second time series of an additional second well connected to said injection well, the intersection of the first location curve and of the second location curve indicating the location of said injection well connected to the first well, to the second well and to the additional second well.

14. The method according to claim 1 , wherein the first well and the second well are production wells and the method further comprises determining an average diffusivity based on the time shift at maximal correlation between the first time series of the first well and the second time series of the second well and based on the location of an injection well connected to the first well and to the second well.

15. A computer program product comprising software instructions which, when executed by a computer, carry out the method according to claim 1 .

16. A system for evaluating connectivity between a first well and a second well in a hydrocarbon production field comprising:

a data recovery module for obtaining a first time series of a first well parameter from the first well and a second time series of a second parameter from the second well, wherein the second time series are obtained by a BHP gauge at a bottom of the second well,

a processing module for processing the first time series to obtain a processed first time series,

a filtering module for filtering the second time series by removing dynamic variations from the second time series to obtain a filtered second time series representative of static variations of the second time series,

a correlation module for determining a correlation between said processed first time series and said filtered second time series at various time shifts between said processed first time series and said filtered second time series, and for determining a maximal correlation coefficient and a time shift at maximal correlation between said processed first time series and said filtered second time series, the maximal correlation coefficient being representative of the connectivity between the first well and the second well, and

a display unit for presenting the maximal correlation coefficient and the time shift at the maximal correlation on a geographical map indicating the connectivity between the first well and the second well.

17. A method for evaluating connectivity between a first well and a second well in a hydrocarbon production field comprising:

obtaining a first time series of a first well parameter from the first well and a second time series of a second well parameter from the second well, wherein the second time series are obtained by a fluid salinity sensor arranged in the second well or by a temperature sensor arranged in the second well,

processing the first time series to obtain a processed first time series,

filtering the second time series by removing dynamic variations from the second time series to obtain a filtered second time series representative of static variations of the second time series,

determining a correlation between said processed first time series and said filtered second time series at various time shifts between said processed first time series and said filtered second time series,

determining a maximal correlation coefficient and a time shift at maximal correlation between said processed first time series and said filtered second time series, the maximal correlation coefficient being representative of the connectivity between the first well and the second well, and

displaying, through a graphical user interface, the maximal correlation coefficient and the time shift at the maximal correlation on a geographical map indicating the connectivity between the first well and the second well.

Assignments (3)
CORRECTIVE ASSIGNMENT TO CORRECT THE NAME OF THE ASSIGNEE PREVIOUSLY RECORDED AT REEL: 67096 FRAME: 87. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT. Recorded Jun 26, 2024
From: TOTALENERGIES SE (PREVIOUSLY TOTAL SA THEN TOTAL SE)
To: TOTALENERGIES ONETECH
Reel/Frame 068051/0530 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 12, 2024
From: TOTALENERGIES SE (PREVIOUSLY TOTAL SA THEN TOTAL SE)
To: TOTALENERGIES ONETECH (PREVIOUSLY TOTALENERGIES ONE TECH)
Reel/Frame 067096/0087 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 6, 2019
From: THORE, PIERRE
To: TOTAL SA
Reel/Frame 050291/0516 →
Continuity (1)
Related Publication 20190360331A1 · Nov 28, 2019
Cited By (1)
US 12,234,718