IP Library Granted Patent US 10,925,006
Granted Patent B2
US 10,925,006 · App. 16/482,274 · Granted Feb 16, 2021

Terminal apparatus and method

Inventors: Wataru Ouchi (Sakai, JP); Shoichi Suzuki (Sakai, JP); Tomoki Yoshimura (Sakai, JP); Liqing Liu (Sakai, JP)
Assignees: SHARP KABUSHIKI KAISHA; FG INNOVATION COMPANY LIMITED
H04W52/146H04L5/0082H04W72/042H04W72/0446H04W80/08
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,925,006
App. No.
16/482,274
Granted
Feb 16, 2021
Kind
B2
Abstract

Included is an uplink power control unit configured not to apply a first correction value obtained from a TPC command included in a first DCI format to transmit power for a PUSCH and applies a second correction value obtained from a TPC command included in a second DCI format to transmit power for an sPUSCH, in a case that a subframe m is later than a subframe n, that a subframe m+B for transmitting the sPUSCH is earlier than a subframe n+A for transmitting the PUSCH, and that a transmission subframe for the PUSCH and a transmission subframe for the sPUSCH belong to an identical uplink power control subframe set in a first serving cell.

Claims (29)

1. A terminal apparatus comprising:

a receiver configured to receive a Downlink Control Information (DCI) format including a Transmission Power Control (TPC) command;

a transmitter configured to transmit, in a case that a first DCI format is detected in a subframe n, a Physical Uplink Shared Channel (PUSCH) corresponding to the first DCI format in a subframe n+A, and transmit, in a case that a second DCI format is detected in a subframe m, a shortened PUSCH (sPUSCH) corresponding to the second DCI format in a subframe m+B, the B being a smaller value than the A; and

an uplink power control unit configured not to apply a first correction value obtained from the TPC command included in the first DCI format to transmit power for the PUSCH and to apply a second correction value obtained from the TPC command included in the second DCI format to transmit power for the sPUSCH, in a case that the subframe m is later than the subframe n, that the subframe m+B for transmitting the sPUSCH is earlier than the subframe n+A for transmitting the PUSCH, and that a transmission subframe for the PUSCH and a transmission subframe for the sPUSCH belong to an identical uplink power control subframe set in a first serving cell.

2. The terminal apparatus according to claim 1 , wherein

the uplink power control unit

applies the first correction value to the transmit power for the PUSCH, and

applies the second correction value to the transmit power for the sPUSCH,

in a case that the subframe m is later than the subframe n, that the subframe m+B for transmitting the sPUSCH is later than the subframe n+A for transmitting the PUSCH, and that the transmission subframe for the PUSCH and the transmission subframe for the sPUSCH belong to the identical uplink power control subframe set in the first serving cell.

3. The terminal apparatus according to claim 1 , wherein

the uplink power control unit

applies the first correction value to the transmit power for the PUSCH, and

applies the second correction value to the transmit power for the sPUSCH,

in a case that the subframe m is earlier than the subframe n, that the subframe m+B for transmitting the sPUSCH is earlier than the subframe n+A for transmitting the PUSCH, and that the transmission subframe for the PUSCH and the transmission subframe for the sPUSCH belong to the identical uplink power control subframe set in the first serving cell.

4. The terminal apparatus according to claim 1 , wherein

the uplink power control unit

applies the first correction value to the transmit power for the PUSCH, and

applies the second correction value to the transmit power for the sPUSCH,

in a case that the transmission subframe for the PUSCH and the transmission subframe for the sPUSCH belong to different uplink power control subframe sets in the first serving cell.

5. The terminal apparatus according to claim 1 , wherein the uplink power control unit does not apply the second correction value to the transmit power for the PUSCH in a case that transmission of the PUSCH and transmission of the sPUSCH collide in a first subframe in the first serving cell and that the transmission of the sPUSCH is included in a second slot in the first subframe.

6. The terminal apparatus according to claim 5 , wherein the uplink power control unit applies the first correction value and the second correction value in a subframe immediately subsequent to the first subframe, in a case that the transmission of the PUSCH and the transmission of the sPUSCH collide in the first subframe in the first serving cell and that the transmission of the sPUSCH is included in a second slot in the first subframe.

7. The terminal apparatus according to claim 5 , wherein

the transmitter drops the transmission of the PUSCH in a case that the transmission of the PUSCH and the transmission of the sPUSCH collide in the first subframe in the first serving cell and that the transmission of the sPUSCH is included in a first slot in the first subframe, and

the uplink power control unit applies the second correction value and does not apply the first correction value to the transmit power for the sPUSCH in the first subframe in the first serving cell.

8. A method comprising the steps of:

receiving a Downlink Control Information (DCI) format including a Transmission Power Control (TPC) command;

transmitting, in a case that a first DCI format is detected in a subframe n, a Physical Uplink Shared Channel (PUSCH) corresponding to the first DCI format in a subframe n+A;

transmitting, in a case that a second DCI format is detected in a subframe m, a shortened PUSCH (sPUSCH) corresponding to the second DCI format in a subframe m+B, the B being a smaller value than the A; and

not applying a first correction value obtained from the TPC command included in the first DCI format to transmit power for the PUSCH and applying a second correction value obtained from the TPC command in the second DCI format to transmit power for the sPUSCH, in a case that the subframe m is later than the subframe n, that the subframe m+B for transmitting the sPUSCH is earlier than the subframe n+A for transmitting the PUSCH, and that a transmission subframe for the PUSCH and a transmission subframe for the sPUSCH belong to an identical uplink power control subframe set in a first serving cell.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 31, 2023
From: SHARP KABUSHIKI KAISHA; SHARP CORPORATION
To: SHARP KABUSHIKI KAISHA
Reel/Frame 063815/0589 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 15, 2023
From: SHARP KABUSHIKI KAISHA; FG INNOVATION COMPANY LIMITED
To: SHARP KABUSHIKI KAISHA; SHARP CORPORATION
Reel/Frame 062389/0715 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 2, 2019
From: OUCHI, WATARU; SUZUKI, SHOICHI; YOSHIMURA, TOMOKI; LIU, LIQING
To: SHARP KABUSHIKI KAISHA; FG INNOVATION COMPANY LIMITED
Reel/Frame 049940/0458 →