Control parameter optimizing system that optimizes values of control parameters of an existing power plant

Inventors: Yasuhiro Yoshida (Tokyo, JP); Takuya Yoshida (Tokyo, JP); Takaaki Sekiai (Tokyo, JP); Yuya Tokuda (Tokyo, JP); Kazunori Yamanaka (Yokohama, JP); Atsushi Yamashita (Yokohama, JP); Norihiro Iyanaga (Yokohama, JP)
Assignee: Mitsubishi Power, Ltd.
G05B19/41835G05B11/01G05B13/042G05B15/02G05B19/4183G05B2219/32015G05B2219/37591
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,048,239
App. No.
16/514,332
Granted
Jun 29, 2021
Kind
B2
Abstract

A control parameter optimizing system and an operation optimizing apparatus equipped therewith are provided, the system being applicable to an existing plant without modifying the control panel or equipment of the plant, the system further being capable of optimizing the operation control of the plant in accordance with diverse operational requirements. The system includes an objective function setting section, a plant model, and a control parameter optimizing section. The control parameter optimizing section includes an optimization control parameter selecting section and an optimization control parameter adjusting section. The optimization control parameter selecting section selects as an optimization control parameter the control parameter for optimizing an objective function based on control logic information extracted from a power plant. The optimization control parameter adjusting section adjusts the value of the optimization control parameter using the plant model in such a manner as to optimize the objective function.

Claims (24)

1. A control parameter optimizing system comprising:

an objective function setting section that sets an objective function to be optimized in controlling an operation of an existing power plant;

a plant model that simulates the operation of the existing power plant and calculates a process amount of the existing power plant and a value of the objective function;

a control parameter optimizing section that optimizes values of control parameters of the existing power plant using the plant model in such a manner as to optimize the objective function;

a control parameter setting section that extracts control parameters from a control parameter information of the existing power plant and sets the extracted control parameters to the plant model;

a physical parameter setting section that extracts physical parameters from a plant characteristic information of the existing power plant and sets the extracted physical parameters to the plant model; and

a design parameter setting section that extracts design parameters from a plant design information of the existing power plant and sets the extracted design parameters to the plant model, wherein

the control parameter optimizing section includes:

an optimization control parameter selecting section that, based on control logic information extracted from a control logic database of the existing power plant, selects a control parameter from the control parameters as an optimization control parameter that is for use in optimizing the objective function; and

an optimization control parameter adjusting section that adjusts the value of the optimization control parameter using the plant model in such a manner as to optimize the objective function, and

the objective function is a start-up time, a rate of load change, an equipment lifetime consumption, a fuel cost, or a generation efficiency, which is defined by a function of a plant process amount.

2. The control parameter optimizing system according to claim 1 , wherein

the control parameter setting section is configured to extract, from the control parameter information, control parameters necessary for creating a control model in the plant model and set the extracted control parameters to the control model, or input the control logic information instead of the control parameter information.

3. The control parameter optimizing system according to claim 1 , wherein

the physical parameter setting section is configured to extract, from the plant characteristic information, physical parameters necessary for creating a physical model in the plant model and set the extracted physical parameters to the physical model, or input a plant operation data of the existing power plant.

4. The control parameter optimizing system according to claim 1 , wherein

the design parameter setting section is configured to extract, from the plant design information, design parameters necessary for creating a physical model in the plant model and set the extracted design parameters to the physical model.

5. The control parameter optimizing system according to claim 2 , wherein

if a name of a parameter extracted by the control parameter setting section, the physical parameter setting section, or the design parameter setting section does not match any one of names of parameters registered in the plant model, the name of the extracted parameter is displayed along with a name of a registered parameter which is similar to the name of the extracted parameter in a mutually corresponding manner on an external monitor.

6. An operation control optimizing apparatus comprising:

a control parameter optimizing system according to claim 1 ;

a plant operation limiting value calculating section that calculates an operation limiting value of the existing power plant based on the plant characteristic information and the plant design information; and

an optimum solution selecting section that, from a plurality of optimum solutions calculated by the control parameter optimizing section, selects an optimum solution meeting the operation limiting value as an optimum solution to be reflected in controlling the operation of the existing power plant, wherein

the operation limiting value is a limiting value on a lifetime consumption of component devices, a temperature, a pressure, or a rate of load change of the existing power plant.

Assignments (1)
CHANGE OF NAME Recorded Oct 28, 2020
From: MITSUBISHI HITACHI POWER SYSTEMS, LTD.
To: MITSUBISHI POWER, LTD.
Reel/Frame 054200/0348 →