IP Library Granted Patent US 11,125,164
Granted Patent B2
US 11,125,164 · App. 16/527,422 · Granted Sep 21, 2021

Baffle with two datum features

Inventors: Scott A. Kovach (Higganum, CT); Tracy A. Propheter-Hinckley (Rocky Hill, CT)
Assignee: RAYTHEON TECHNOLOGIES CORPORATION
F02C7/18F01D5/188F01D5/189F01D9/041B23Q3/063F05D2230/10
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,125,164
App. No.
16/527,422
Granted
Sep 21, 2021
Kind
B2
Abstract

A method of fabricating a baffle for a gas turbine engine component includes providing a baffle that has a baffle wall that circumscribes an open interior region, the baffle wall defining two datum features, wherein at least one of the two datum features is semi-spherical, establishing a fixed reference position of the baffle in a fixture by engaging the two datum features with two corresponding locators on the fixture, and performing at least one operation on the baffle that is dependent upon the reference position.

Claims (26)

1. A method of fabricating a baffle for a gas turbine engine component, the method comprising:

providing a baffle that has a baffle wall that initially is a tube that circumscribes an open interior region, the baffle wall defining first and second datum features, wherein the first datum feature is a semi-spherical dimple that protrudes into the open interior region, the tube has a forward wall, an aft wall, and lateral side walls, the first and second datum features are on the aft wall, the forward wall is curved, and the aft wall is planar;

establishing a fixed reference position of the baffle in a fixture by engaging the two datum features with two corresponding locators on the fixture; and

performing at least one operation on the baffle that is dependent upon the reference position.

2. The method as recited in claim 1 , wherein the second datum feature is also a semi-spherical dimple that protrudes into the open interior region.

3. The method as recited in claim 1 , wherein the at least one operation includes a forming operation.

4. The method as recited in claim 1 , wherein the at least one operation includes an inspection operation.

5. The method as recited in claim 1 , wherein the at least one operation includes a cutting operation.

6. The method as recited in claim 1 , wherein the at least one operation includes a drilling operation.

7. The method as recited in claim 1 , wherein the baffle includes a non-working surface and the first and second datum features are in the non-working surface.

8. The method as recited in claim 1 , wherein the baffle is elongated along a longitudinal direction, and the first and second datum features are spaced-apart in the longitudinal direction and in the same surface.

9. A method of fabricating a baffle for a gas turbine engine component, the method comprising:

providing a baffle that initially is a tube that has first and second datum features that are semi-spherical dimples that protrude into an interior region of the tube, the tube has a forward wall, an aft wall, and lateral side walls, the first and second datum features are on the aft wall, the forward wall is curved, and the aft wall is planar;

nesting the tube in a fixed reference position in a fixture by engaging the first and second datum features with two corresponding locators on the fixture such that in the fixed reference position the tube is fixed (i) in a reference plane that is defined by first and second datum points at the first and second datum features and a third datum point on the tube, (ii) on a reference line that is defined between the first and second datum points, and (iii) at a reference point that is defined by one of the first or second datum points;

performing a cutting operation at a location on the tube that is dependent upon the fixed reference position, the cutting operation removing an end of the tube and creating a free surface; and

performing a drilling operation at multiple locations on the tube that are dependent on the fixed reference position, the drilling operation creating a plurality of impingement orifices.

10. The method as recited in claim 9 , further comprising performing a welding operation to secure an endwall at the free surface.

11. The method as recited in claim 9 , wherein the baffle includes a non-working surface and the first and second datum features are in the non-working surface.

12. The method as recited in claim 9 , wherein the baffle is elongated along a longitudinal direction, and the first and second datum features are spaced-apart in the longitudinal direction and in the same surface.

13. The method as recited in claim 9 , wherein, except for the first and second datum features and the first, second, and third datum points, the tube has no additional datum features or datum points.

14. The method as recited in claim 9 , wherein, prior to the nesting, the tube has no protrusions or dimples except for the first and second datum features.

15. A method of fabricating a baffle for a gas turbine engine component, the method comprising:

providing a baffle that initially is a tube that has first and second datum features that are semi-spherical dimples that protrude into an interior region of the tube, wherein the providing includes forming the tube from a tube blank by expanding the tube blank outwards against a tool wall by application of an internal pressure, the tool wall containing semi-spherical protrusions such that when the tube expands against the tool wall the tube conforms to the protrusions to form the semi-spherical dimples

nesting the tube in a fixed reference position in a fixture by engaging the first and second datum features with two corresponding locators on the fixture such that in the fixed reference position the tube is fixed (i) in a reference plane that is defined by first and second datum points at the first and second datum features and a third datum point on the tube, (ii) on a reference line that is defined between the first and second datum points, and (iii) at a reference point that is defined by one of the first or second datum points;

performing a cutting operation at a location on the tube that is dependent upon the fixed reference position, the cutting operation removing an end of the tube and creating a free surface; and

performing a drilling operation at multiple locations on the tube that are dependent on the fixed reference position, the drilling operation creating a plurality of impingement orifices.

Assignments (4)
CHANGE OF NAME Recorded Jul 27, 2023
From: RAYTHEON TECHNOLOGIES CORPORATION
To: RTX CORPORATION
Reel/Frame 064714/0001 →
CORRECTIVE ASSIGNMENT TO CORRECT THE SPELLING ON THE ADDRESS 10 FARM SPRINGD ROAD FARMINGTONCONNECTICUT 06032 PREVIOUSLY RECORDED ON REEL 057190 FRAME 0719. ASSIGNOR(S) HEREBY CONFIRMS THE CORRECT SPELLING OF THE ADDRESS 10 FARM SPRINGS ROAD FARMINGTON CONNECTICUT 06032. Recorded Aug 19, 2021
From: UNITED TECHNOLOGIES CORPORATION
To: RAYTHEON TECHNOLOGIES CORPORATION
Reel/Frame 057226/0390 →
CHANGE OF NAME Recorded Aug 16, 2021
From: UNITED TECHNOLOGIES CORPORATION
To: RAYTHEON TECHNOLOGIES CORPORATION
Reel/Frame 057190/0719 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 31, 2019
From: KOVACH, SCOTT A.; PROPHETER-HINCKLEY, TRACY A.
To: UNITED TECHNOLOGIES CORPORATION
Reel/Frame 049916/0117 →