IP Library Patent Application 16560932
Patent Application
App. No. 16/560,932

MMW PHYSICAL LAYER DOWNLINK CHANNEL SCHEDULING AND CONTROL SIGNALING

Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US None
App. No.
16/560,932
Abstract

A wireless transmit/receive unit (WTRU) (e.g., a millimeter WTRU (mWTRU)) may receive a first control channel using a first antenna pattern. The WTRU may receive a second control channel using a second antenna pattern. The WTRU tray demodulate and decode the first control channel. The WTRU may demodulate and decode the second control channel. The WTRU may determine, using at least one of: the decoded first control channel or the second control channel, beam scheduling information associated with the WTRU and whether the WTRU is scheduled for an mmW segment. The WTRU may form a receive beam using the determined beam scheduling information. The WTRU receive the second control channel using the receive beam. The WTRU determine, by demodulating and decoding the second control channel, dynamic per-TTI scheduling information related to a data channel associated with the second control channel.

Claims (41)

1 . A control signaling and scheduling method performed by a wireless transmit/receive unit (WTRU), the method comprising:

receiving a first control channel using a first antenna pattern;

receiving a second control channel using a second antenna pattern;

demodulating and decoding the first control channel;

demodulating and decoding the second control channel;

determining, using at least one of: the decoded first control channel or the decoded second control channel, beam scheduling information associated with the WTRU and whether the WTRU is scheduled for a millimeter wave (mmW) segment;

on a condition that the WTRU is scheduled for the mmW segment

forming a receive beam using the determined beam scheduling information,

receiving the second control channel using the receive beam, and

determining, by demodulating and decoding the second control channel, dynamic per-transmission time interval (TTI) scheduling information related to a data channel associated with the second control channel.

2 . The method of claim 1 , further comprising receiving the data channel using the dynamic per-TTI scheduling information.

3 . The method of claim 1 , wherein the first control channel is configured per beam of the WTRU.

4 . The method of claim 1 , wherein the first control channel is one of: a common physical downlink directional control channel (PDDCCH), a physical downlink control channel (PDCCH), an enhanced PDCCH (EPDCCH), or a millimeter wave physical downlink control channel (mmPDCCH), and the common PDDCCH is read by a plurality of WTRUs.

5 . The method of claim 1 , wherein the first control channel is carried using a first mmW beam or an LTE beam and the second control channel is carried using a second mmW beam, wherein the first mmW beam or the LTE beam is wider than the second mmW beam.

6 . The method of claim 1 , wherein the beam scheduling information associated with the WTRU comprises transmit and receive beam scheduling information.

7 . The method of claim 1 , wherein the second control channel is a dedicated PDDCCH and comprises one or more of modulation and coding scheme (MCS), or new data indicator (NDI).

8 . The method of claim 1 , wherein the data channel is a physical downlink directional data channel (PDDDCH).

9 . The method of claim 1 further comprising determining a validity period associated with per-TTI scheduling information and applying the per-TTI scheduling information to one or more mmW TTIs.

10 . The method of claim 9 , wherein the per-TTI scheduling information is identical for a plurality of consecutive TTIs within a subframe.

11 . The method of claim 1 , wherein resource allocation of one or more of the first control channel or the second control channel is received from a network via higher layer signaling.

12 . A wireless transmit/receive unit (WTRU) comprising:

a processor configured to at least:

receive a first control channel using a first antenna pattern;

receive a second control channel using a second antenna pattern;

demodulate and decode the first control channel;

demodulate and decode the second control channel;

determine, using at least one of: the decoded first control channel or the decoded second control channel, beam scheduling information associated with the WTRU and whether the WTRU is scheduled for a millimeter wave (mmW) segment;

on a condition that the WTRU is scheduled for the mmW segment

form a receive beam using the determined beam scheduling information,

receive the second control channel using the receive beam, and

determine, by demodulating and decoding the second control channel, dynamic per-transmission time interval (TTI) scheduling information related to a data channel associated with the second control channel.

13 . The WTRU of claim 12 , wherein the processor is further configured to receive the data channel using the dynamic per-TTI scheduling information.

14 . The WTRU of claim 12 , wherein the first control channel is configured per beam of the WTRU.

15 . The WTRU of claim 12 , wherein the first control channel is one of: a common physical downlink directional control channel (PDDCCH), a physical downlink control channel (PDCCH), an enhanced PDCCH (EPDCCH), or a millimeter wave physical downlink control channel (mmPDCCH), and the common PDDCCH is read by a plurality of WTRUs.

16 . The WTRU of claim 12 , wherein the first control channel is carried using a first mmW beam or an LTE beam and the second control channel is carried using a second mmW beam, wherein the first mmW beam or the LTE beam is wider than the second mmW beam.

17 . The WTRU of claim 12 , wherein the beam scheduling information associated with the WTRU comprises transmit and receive beam scheduling information.

18 . The WTRU of claim 12 , wherein the second control channel is a dedicated PDDCCH and comprises one or more of modulation and coding scheme (MCS), or new data indicator (NDI).

19 . The WTRU of claim 12 , wherein the data channel is a physical downlink directional data channel (PDDDCH).

20 . The WTRU of claim 12 , wherein the processor is further configured to determine a validity period associated with per-TTI scheduling information and apply the per-TTI scheduling information to one or more mmW TTIs.

21 . The WTRU of claim 20 , wherein the per-TTI scheduling information is identical for a plurality of consecutive TTIs within a subframe.

22 . The WTRU of claim 12 , wherein resource allocation of one or more of the first control channel or the second control channel is received from a network via higher layer signaling.