IP Library Granted Patent US 10,933,582
Granted Patent B2
US 10,933,582 · App. 16/576,465 · Granted Mar 2, 2021

Managing powder mobility in binder jetting for additive manufacturing

Inventors: Emanuel Michael Sachs (Newton, MA); George Hudelson (Billerica, MA); Paul A. Hoisington (Hanover, NH); Christopher Benjamin Renner (Cambridge, MA); Keith Roy Vaillancourt (Hudson, NH); Edward Russell Moynihan (Plainfield, NH)
Assignee: Desktop Metal, Inc.
B29C64/165B22F1/0096B22F3/008B22F3/1055B28B1/001B29C64/20B29C64/209B29C64/30B29C64/364B29C64/371B29C64/393B33Y10/00B33Y30/00B33Y50/02B22F2003/1056B22F2999/00
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,933,582
App. No.
16/576,465
Granted
Mar 2, 2021
Kind
B2
Abstract

Devices, systems, and methods are directed to the use of vapor phase change in binder jetting processes for forming three-dimensional objects. In general, a vapor of a first fluid may be directed to a layer of a powder spread across a build volume. The vapor may condense to reduce mobility of the particles of the powder of the layer. For example, the condensing vapor may reduce the likelihood of particle ejection from the layer and, thus, may reduce the likelihood of clogging or otherwise degrading a printhead used to jet a second fluid (e.g., a binder) to the layer. Further, or instead, the condensing vapor may increase the density of the powder in the layer which, when repeated over a plurality of layers forming a three-dimensional object, may reduce the likelihood of slumping of the part during sintering.

Claims (48)

1. A method of forming an object using binder jet additive manufacturing, the method comprising:

forming a layer of powder on a build volume;

directing a first fluid in a vapor phase toward the layer of powder; and

delivering a second fluid to the layer of powder in a two-dimensional pattern, wherein the second fluid is configured to bind at least some of the powder.

2. The method of claim 1 , further comprising condensing the first fluid from the vapor phase to a liquid phase.

3. The method of claim 2 , wherein condensing the first fluid from the vapor phase to the liquid phase precedes delivering the second fluid to the layer of powder.

4. The method of claim 2 , wherein the layer of powder includes a void space between particles of powder, and wherein the first fluid in the liquid phase fills anywhere from 0.1 percent of the void space to 10 percent of the void space.

5. The method of claim 1 , wherein at least a portion of the layer of powder is maintained at a temperature less than a dew point of the first fluid.

6. The method of claim 1 , wherein the first fluid includes one or more of water, acetone, toluene, methyl ethyl ketone, ethanol, isopropyl alcohol, or n-butyl acetate.

7. The method of claim 1 , wherein the layer of powder is a layer of metal powder.

8. The method of claim 1 , wherein the first fluid in the vapor phase is at a temperature less than a boiling point of the first fluid.

9. The method of claim 1 , wherein the first fluid in the vapor phase is at a temperature greater than or equal to a boiling point of the first fluid.

10. The method of claim 1 , wherein directing the first fluid in the vapor phase toward the layer of powder further includes directing a carrier gas toward the layer of powder.

11. The method of claim 10 , wherein the carrier gas includes one or more of nitrogen, argon, or air.

12. The method of claim 10 , wherein the carrier gas is passed through a sparger to mix the carrier gas with the first fluid in the vapor phase.

13. A method of forming an object using binder jet additive manufacturing, the method comprising:

forming a layer of powder within a build chamber;

generating a first fluid in a vapor phase; and

adjusting or maintaining a condition within the build chamber associated with condensation the first fluid from the vapor phase to a liquid phase.

14. The method of claim 13 , further comprising delivering a second fluid to the layer of powder in a two-dimensional pattern, wherein the second fluid is configured to bind at least some of the powder.

15. The method of claim 13 , wherein at least a portion of the layer of powder is maintained at a temperature less than a dew point of the first fluid.

16. The method of claim 13 , wherein the layer of powder is a first layer of powder, the method further comprising:

directing the first fluid in the vapor phase toward the first layer of powder;

condensing the first fluid from the vapor phase to a liquid phase;

delivering a second fluid to the first layer of powder in a first two-dimensional pattern, wherein the second fluid is configured to bind at least some of the powder;

forming a second layer of powder within the build chamber;

directing the first fluid in the vapor phase toward the second layer of powder;

condensing the first fluid from the vapor phase to the liquid phase; and

delivering the second fluid to the second layer of powder in a second two-dimensional pattern.

17. The method of claim 13 , wherein the condition includes at least one of a temperature of powder within the build chamber, a saturation of the first fluid in the vapor phase within the build chamber, or a flow rate of the first fluid in the vapor phase in the build chamber.

18. A method of forming an object using binder jet additive manufacturing, the method comprising:

forming a layer of powder within a build chamber;

generating a first fluid in a vapor phase;

adjusting or maintaining an environment within the build chamber to affect a condensation of the first fluid from the vapor phase to a liquid phase; and

condensing the first fluid from the vapor phase to the liquid phase on at least a portion of the layer of powder.

19. The method of claim 18 , wherein adjusting or maintaining the environment within the build chamber includes controlling a temperature of at least a portion of powder to below a dew point of the first fluid in the vapor phase.

20. A method of forming an object using binder jet additive manufacturing, the method comprising:

forming a layer of powder within a build chamber;

generating a first fluid in a vapor phase;

adjusting or maintaining an environment within the build chamber to affect a condensation of the first fluid from the vapor phase to a liquid phase; and

condensing the first fluid from the vapor phase to the liquid phase on at least a portion of the layer of powder; and

wherein adjusting or maintaining the environment within the build chamber includes controlling a saturation of the first fluid in the vapor phase in the build chamber.

21. A method of forming an object using binder jet additive manufacturing, the method comprising:

forming a layer of powder within a build chamber;

generating a first fluid in a vapor phase;

adjusting or maintaining an environment within the build chamber to affect a condensation of the first fluid from the vapor phase to a liquid phase; and

condensing the first fluid from the vapor phase to the liquid phase on at least a portion of the layer of powder; and

delivering a second fluid to the layer of powder, wherein the second fluid is configured to bind at least some of the powder, and wherein a temperature of the second fluid is delivered to a temperature that is greater than or equal to a temperature of the layer of powder.

Assignments (2)
SECURITY INTEREST Recorded Apr 24, 2026
From: ARC IMPACT ACQUISITION CORPORATION
To: IRON HORSE CREDIT LLC
Reel/Frame 075458/0351 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 6, 2020
From: SACHS, EMANUAL MICHAEL; HUDELSON, GEORGE; HOISINGTON, PAUL A.; RENNER, CHRISTOPHER BENJAMIN; VAILLANCOURT, KEITH ROY; MOYNIHAN, EDWARD RUSSELL
To: DESKTOP METAL, INC.
Reel/Frame 051419/0430 →