IP Library Granted Patent US 10,659,155
Granted Patent B2
US 10,659,155 · App. 16/576,518 · Granted May 19, 2020

Submarine cable network architecture

Inventors: Stephen Gregory Grubb (Atherton, CA); Timothy Edward Stuch (Livermore, CA); Andrew James Palmer-Felgate (Chichester, GB)
Assignee: Facebook, Inc.
H04B10/07955G02B6/4427H01B7/14H04B10/0793H04B10/808
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,659,155
App. No.
16/576,518
Granted
May 19, 2020
Kind
B2
Abstract

A system comprises a trunk submarine cable, an offshore optical and power switching unit connected to the trunk submarine cable, and a plurality of feeder submarine cables connected to the offshore switching unit. The offshore switching unit is configured to dynamically connect data communication channels of a selected feeder submarine cable among the plurality of feeder submarine cables with data communication channels of the trunk submarine cable.

Claims (35)

1. A system, comprising:

a trunk submarine cable;

an offshore switching unit connected to the trunk submarine cable; and

a plurality of feeder submarine cables connected to the offshore switching unit, wherein the offshore switching unit is configured to dynamically connect a data communication channel of a selected feeder submarine cable among the plurality of feeder submarine cables with a data communication channel of the trunk submarine cable;

wherein the offshore switching unit is configured to dynamically switch to a new power scheme using at least the selected feeder submarine cable among the plurality of feeder submarine cables to power the trunk submarine cable based at least in response to a detected reduction in availability of power within the plurality of feeder submarine cables.

2. The system of claim 1 , wherein the offshore switching unit includes a wavelength selective switch component for dynamically connecting the data communication channel of the selected feeder submarine cable.

3. The system of claim 1 , wherein the offshore switching unit includes a power switch branching component for dynamically redistributing power.

4. The system of claim 1 , wherein the offshore switching unit and a terminal end of the trunk submarine cable is positioned in international waters.

5. The system of claim 1 , wherein the plurality of feeder submarine cables connect the offshore switching unit to a plurality of cable landing stations.

6. The system of claim 5 , wherein at least one of the plurality of feeder submarine cables includes an additional conductor for diverting power to a power fault.

7. The system of claim 5 , wherein the plurality of cable landing stations are connected via a festoon network.

8. The system of claim 1 , wherein the trunk submarine cable is a trans-oceanic submarine cable.

9. The system of claim 1 , wherein the trunk submarine cable is connected to a second offshore switching unit.

10. The system of claim 1 , wherein the trunk submarine cable includes strands of optical fibers, a water-resistant gel, and a polyethylene exterior moisture barrier.

11. The system of claim 1 , wherein the trunk submarine cable includes strands of optical fibers, and the strands of optical fibers are enclosed by a metal tube and surrounded by strands of steel wires.

12. The system of claim 1 , wherein the plurality of feeder submarine cables connected to the offshore switching unit includes at least three feeder submarine cables.

13. A method, comprising:

monitoring a status of a channel associated with an offshore switching unit connected to a trunk submarine cable, wherein a plurality of feeder submarine cables are connected to the offshore switching unit;

detecting a reduction in availability of one or more data communication channels of the plurality of feeder submarine cables;

dynamically connecting a data communication channel of a selected feeder submarine cable among the plurality of feeder submarine cables with a data communication channel of the trunk submarine cable; and

dynamically switching to a new power scheme using at least the selected feeder submarine cable among the plurality of feeder submarine cables to power the trunk submarine cable based at least in response to a detected reduction in availability of power within the plurality of feeder submarine cables.

14. The method of claim 13 , wherein the reduction in availability includes an optical connectivity fault or a power fault.

15. The method of claim 13 wherein the offshore switching unit includes a wavelength selective switch component for dynamically connecting the data communication channel of the selected feeder submarine cable.

16. The method of claim 13 , wherein the offshore switching unit includes a power switch branching component for dynamically redistributing power.

17. The method of claim 13 , wherein the plurality of feeder submarine cables connect the offshore switching unit to a plurality of cable landing stations.

18. The method of claim 13 , wherein the trunk submarine cable is connected to a second offshore switching unit.

19. The method of claim 13 , wherein the plurality of feeder submarine cables connected to the offshore switching unit includes at least three feeder submarine cables.

20. A method, comprising:

connecting a first feeder submarine cable to an offshore switching unit;

connecting a second feeder submarine cable to the offshore switching unit;

connecting a first trunk submarine cable to the offshore switching unit;

monitoring a status of a data communication channel associated using the offshore switching unit, the first feeder submarine cable, and the first trunk submarine cable;

detecting a reduction in availability of the data communication channel of the first feeder submarine cable;

dynamically connecting a data communication channel of the second feeder submarine cable with a data communication channel of the trunk submarine cable; and

dynamically switching to a new power scheme using at least the selected feeder submarine cable among the plurality of feeder submarine cables to power the trunk submarine cable based at least in response to a detected reduction in availability of power within the plurality of feeder submarine cables.

Assignments (1)
CHANGE OF NAME Recorded Nov 19, 2021
From: FACEBOOK, INC.
To: META PLATFORMS, INC.
Reel/Frame 058214/0351 →
Continuity (2)
Continuation 16057557 · Aug 7, 2018
Related Publication 20200052788A1 · Feb 13, 2020
Cited By (1)
US 12,483,018