IP Library Granted Patent US 11,207,974
Granted Patent B2
US 11,207,974 · App. 16/577,875 · Granted Dec 28, 2021

Multiple gas tank assembly with individual pressure monitoring

Inventors: Nitesh Shroff (Chattanooga, TN); Stanley L. Maroney (Attalla, AL)
Assignee: The Heil Co.
B60K15/07B60K15/073B60K15/077F02D19/027B60K2015/03026
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,207,974
App. No.
16/577,875
Granted
Dec 28, 2021
Kind
B2
Abstract

This disclosure describes an assembly for gas (e.g., compressed natural gas) storage. The assembly includes multiple gas storage tanks, with each tank coupled to a separate sub-assembly that includes a pressure gauge, shutoff valve, and pressure relief device (PRD), providing for independent pressure monitoring, shutoff, and pressure relief for each of the tanks.

Claims (29)

1. A gas storage assembly of a refuse collection vehicle comprising:

a plurality of gas storage tanks consisting of every gas storage tank on the refuse collection vehicle, each respective gas storage tank of the plurality of gas storage tanks coupled to a respective sub-assembly including:

a pressure gauge that measures and displays a pressure in the respective gas storage tank;

a pressure relief device (PRD) that relieves pressure in the respective gas storage tank; and

a shutoff valve that controls a flow of gas to and from the respective gas storage tank.

2. The assembly of claim 1 , further comprising:

a cover that at least partly covers at least one side of the assembly, wherein the cover includes an opening to provide visibility to each respective pressure gauge.

3. The assembly of claim 1 , wherein the gas is compressed natural gas.

4. The assembly of claim 1 , wherein the assembly is attached to a tailgate of the refuse collection vehicle.

5. The assembly of claim 1 , wherein the gas is a fuel for the refuse collection vehicle.

6. The assembly of claim 1 , wherein the sub-assembly further comprises a supply line coupled to the respective gas storage tank and configured to supply a flow of gas to and from the respective gas storage tank.

7. The assembly of claim 1 , wherein;

the sub-assembly further comprises a vent line configured for venting gas from the respective gas storage tank; and

the pressure relief device is coupled to the vent line.

8. The assembly of claim 1 , wherein the sub-assembly further comprises a port coupled to the respective gas storage tank, wherein the port is configured to provide a flow of gas to the respective gas storage tank.

9. The assembly of claim 1 , wherein the sub-assembly includes plumbing configured to separate the pressure gauge and the PRD from the shutoff valve such that the pressure gauge and the PRD remain in fluid communication with the gas storage tank when the shutoff valve is closed.

10. The assembly of claim 1 , wherein the plurality of gas storage tanks are fluidly connected in parallel; wherein the pressure in the respective gas storage tank measured by the pressure gauge is a system pressure across the plurality of gas storage tanks when the shutoff valve is open; and wherein the pressure in the respective gas storage tank measured by the pressure gauge is an individual pressure specific to the respective gas storage tank when the shutoff valve is closed.

11. A vehicle tank pressure control system of a refuse collection vehicle comprising:

multiple pressure gauges, each configured to measure and display the pressure of a respective gas storage tank of a plurality of gas storage tanks, the plurality of gas storage tanks consisting of every gas storage tank mounted on and coupled to the refuse collection vehicle to supply gas for combustion to propel the refuse collection vehicle;

multiple pressure relief devices (PRD), each PRD coupled to a respective one of the pressure gauges to relieve pressure in a respective one of the plurality of gas storage tanks; and

multiple shutoff valves, each shutoff valve coupled to a respective one of the pressure gauges to control a flow of gas to and from a respective one of the gas storage tanks.

12. The system of claim 11 , further comprising:

a cover configured to at least partly cover at least one side of a plurality of associated gas storage tanks, wherein the cover defines one or more openings to provide visibility to the pressure gauges.

13. The system of claim 11 , configured for use with tanks containing compressed natural gas.

14. The system of claim 11 , secured to a tailgate of the refuse collection vehicle.

15. The system of claim 11 , coupled to a drive system of the refuse collection vehicle.

16. The system of claim 11 , further comprising multiple gas supply lines, each gas supply line coupled to an associated gas storage tank to supply a flow of gas to and from the associated gas storage tank.

17. The system of claim 11 , further comprising multiple vent lines, each vent line coupled to a respective one of the PRDs for coupling to an associated gas storage tank and to vent gas from the associated gas storage tank.

18. The system of claim 11 , further comprising multiple ports, each port coupled to an associated gas storage tank to provide a flow of gas to and from the associated gas storage tank.

Assignments (2)
SECURITY INTEREST Recorded Oct 9, 2024
From: THE HEIL CO.; TEREX USA, LLC; TEREX SOUTH DAKOTA, INC.
To: UBS AG, STAMFORD BRANCH
Reel/Frame 069177/0271 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 1, 2019
From: SHROFF, NITESH; MARONEY, STANLEY L.
To: THE HEIL CO.
Reel/Frame 050581/0353 →