IP Library Granted Patent US 11,140,675
Granted Patent B2
US 11,140,675 · App. 16/578,945 · Granted Oct 5, 2021

Methods of efficient bandwidth part switching in carrier aggregation

Inventors: Pei-Kai Liao (Hsin-Chu, TW); Wei-De Wu (Hsin-Chu, TW); Jia-Hong Syu (Hsin-Chu, TW)
Assignee: MediaTek INC.
H04W72/044H04W72/042H04W72/1205
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,140,675
App. No.
16/578,945
Granted
Oct 5, 2021
Kind
B2
Abstract

A method of supporting active bandwidth part (BWP) switching under carrier aggregation (CA) is proposed. To avoid longer switching delay and multiple interruptions in other component carriers (CCs)/cells, the starting time of the later active BWP switching in one cell should fall outside the switching delay of the earlier active BWP switching in another cell. If the later active BWP switching is DCI-based, then the network should schedule the later active BWP switching outside the switching delay of the earlier active BWP switching. If the later active BWP switching is timer-based, then the UE should not perform the later active BWP switching until the earlier active BWP switching is completed.

Claims (27)

1. A method comprising:

receiving configuration information transmitted from a base station by a user equipment (UE) in a wireless communications network, wherein the UE operates over multiple component carriers (CCs) under carrier aggregation, and wherein the UE is configured with multiple bandwidth parts (BWPs) in each CC;

performing a first active BWP switching in a first CC by the UE upon satisfying a first BWP switch trigger condition;

detecting a second BWP switch trigger condition is satisfied for triggering a second active BWP switching in a second CC; and

determining a time duration of a switching delay of the first active BWP switching in the first CC, wherein the UE is refrained from performing the second active BWP switching if the second BWP switching is triggered during the time duration.

2. The method of claim 1 , wherein the first BWP switch trigger condition is satisfied by receiving a first downlink control information (DCI) for indicating the first active BWP switching for the first CC.

3. The method of claim 1 , wherein the first BWP switch trigger condition is satisfied by detecting that a first BWP inactivity timer for the first CC is expired.

4. The method of claim 1 , wherein the second BWP switch trigger condition is satisfied by receiving a second downlink control information (DCI) in a slot for indicating the second active BWP switching for the second CC.

5. The method of claim 4 , wherein the UE ignores the second DCI or drops the second DCI as an error if the slot overlaps with the time duration.

6. The method of claim 4 , wherein the UE is allowed to perform the second active BWP switching if the slot is a first slot of a set of slots that overlap with the time duration.

7. The method of claim 1 , wherein the second BWP switch condition is satisfied by detecting that a second BWP inactivity timer for the second CC is expired.

8. The method of claim 7 , wherein the UE waits until the first active BWP switching to be completed and then performs the second active BWP switching.

9. The method of claim 1 , wherein the time duration determined in a DCI indicating active BWP switching includes a minimal BWP switching delay required by the UE plus an additional switching delay due to scheduling constraints of the base station.

10. The method of claim 1 , wherein the UE is not required to transmit or receive data over the first CC during the switching delay.

11. A User Equipment (UE) comprising:

a receiver that receives configuration information transmitted from a base station in a wireless communications network, wherein the UE operates over multiple component carriers (CCs) under carrier aggregation, and wherein the UE is configured with multiple bandwidth parts (BWPs) in each CC;

a BWP handling circuit that performs a first active BWP switching in a first CC by the UE upon satisfying a first BWP switch trigger condition; and

a control circuit that detects a second BWP switch trigger condition is satisfied for triggering a second active BWP switching in a second CC, wherein the UE determines a time duration of the first active BWP switching in the first CC, wherein the UE is refrained from performing the second active BWP switching when the second BWP switching is triggered during the time duration.

12. The UE of claim 11 , wherein the first BWP switch trigger condition is satisfied by receiving a first downlink control information (DCI) for indicating the first active BWP switching for the first CC.

13. The UE of claim 11 , wherein the first BWP switch trigger condition is satisfied by detecting that a first BWP inactivity timer for the first CC is expired.

14. The UE of claim 11 , wherein the second BWP switch trigger condition is satisfied by receiving a second downlink control information (DCI) in a slot for indicating the second active BWP switching for the second CC.

15. The UE of claim 14 , wherein the UE ignores the second DCI or drops the second DCI as an error if the slot overlaps with the time duration.

16. The UE of claim 14 , wherein the UE is allowed to perform the second active BWP switching if the slot is a first slot of a set of slots that overlap with the time duration.

17. The UE of claim 11 , wherein the second BWP switch condition is satisfied by detecting that a second BWP inactivity timer for the second CC is expired.

18. The UE of claim 17 , wherein the UE waits until the first active BWP switching to be completed and then performs the second active BWP switching.

19. The UE of claim 11 , wherein the time duration determined in a DCI indicating active BWP switching includes a minimal BWP switching delay required by the UE plus an additional switching delay due to scheduling constraints of the base station.

20. The UE of claim 11 , wherein the UE is not required to transmit or receive data over the first CC during the switching delay.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 7, 2026
From: MEDIATEK INC.
To: HFI INNOVATION INC.
Reel/Frame 075025/0575 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 23, 2019
From: LIAO, PEI-KAI; WU, WEI-DE; SYU, JIA-HONG
To: MEDIATEK INC.
Reel/Frame 050462/0015 →
Continuity (3)
Provisional Application 62738063 · Sep 28, 2018
Provisional Application 62737225 · Sep 27, 2018
Related Publication 20200107308A1 · Apr 2, 2020