IP Library Granted Patent US 11,215,375
Granted Patent B2
US 11,215,375 · App. 16/590,783 · Granted Jan 4, 2022

Building control system with heat disturbance estimation and prediction

Inventors: Anas W. I. Alanqar (Milwaukee, WI); Fang Du (Milwaukee, WI); Michael J. Wenzel (Grafton, WI); Matthew J. Ellis (Milwaukee, WI); Mohammad N. Elbsat (Milwaukee, WI)
Assignee: Johnson Controls Tyco IP Holdings LLP
F24F11/30F24F11/56F24F11/61F24F11/65G05B13/048F24F2110/10F24F2140/00
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,215,375
App. No.
16/590,783
Filed
Oct 2, 2019
Granted
Jan 4, 2022
Kind
B2
Examiner
GAMI, TEJAL
Art Unit
2117
USPC
700/277
Abstract

An environmental control system for a building including heating, ventilation, or air conditioning (HVAC) equipment that operates to affect a zone of the building and a controller including a processing circuit. The processing circuit is configured to estimate a thermal resistance between air of the zone and of an external space using values of a temperature of the zone air, a temperature of the external space air, and a heat transfer rate of the HVAC equipment, each value corresponding to a different time step within a time period. The processing circuit is configured to use the thermal resistance, time step specific values of the temperatures, and time step specific values of the heat transfer rate to estimate corresponding values of a heat disturbance. The processing circuit is configured to operate the HVAC equipment using a model-based control technique based on the heat disturbance values.

Claims (48)

1. An environmental control system for a building, the system comprising:

heating, ventilation, or air conditioning (HVAC) equipment that operates to affect a variable state or condition of a zone of the building; and

a controller comprising a processing circuit configured to:

estimate a thermal resistance between air of the zone and air of an external space outside the zone using a plurality of values of a temperature of the air of the zone, a temperature of the air of the external space, and a heat transfer rate of the HVAC equipment that provides heating or cooling to the zone, each of the plurality of values corresponding to a different time step within a time period;

for a plurality of time steps within the time period, use the thermal resistance between the air of the zone and the air of the external space, a time step specific value of the temperature of the air of the zone, a time step specific value of the temperature of the air of the external space, and a time step specific value of the heat transfer rate of the HVAC equipment to estimate a corresponding time step specific value of a heat disturbance; and

operate the HVAC equipment over the time period using a model-based control technique based on the time step specific values of the heat disturbance.

2. The system of claim 1 , wherein the time period is a historical time period, and wherein the processing circuit is further configured to perform a system identification process based on the time step specific values of the heat disturbance for the historical time period to identify a predictive model configured to predict future time step specific values of the heat disturbance, wherein the predictive model is used in the model-based control technique.

3. The system of claim 2 , wherein the system identification process comprises identifying a scaling parameter that scales the future time step specific values of the heat disturbance.

4. The system of claim 1 , wherein the processing circuit is configured to identify a Kalman gain and a stochastic model of the heat disturbance based on the time step specific values of the heat disturbance or predicted heat disturbance values based on the time step specific values of the heat disturbance, the Kalman gain and the stochastic model used in the model-based control technique.

5. The system of claim 4 , wherein identifying the Kalman gain and the stochastic model comprises performing a multi-step system identification process.

6. The system of claim 1 , wherein the processing circuit is configured to filter the time step specific values of the heat disturbance through at least one of:

an anti-spike filter; or

a smoothing filter.

7. The system of claim 1 , wherein the processing circuit is configured to generate a predictive model configured to predict future values of the heat disturbance by fitting the time step specific values of the heat disturbance to at least one of:

a Gaussian function;

a sinusoid function; or

a user-defined function.

8. A method for operating heating, ventilation, or air conditioning (HVAC) equipment of a building, the method comprising:

estimating a thermal resistance between air of a zone of the building and air of an external space outside the zone using a plurality of values of a temperature of the air of the zone, a temperature of the air of the external space, and a heat transfer rate of the HVAC equipment that provides heating or cooling to the zone, each of the plurality of values corresponding to a different time step within a time period;

for a plurality of time steps within the time period, using the thermal resistance between the air of the zone and the air of the external space, a time step specific value of the temperature of the air of the zone, a time step specific value of the temperature of the air of the external space, and a time step specific value of the heat transfer rate of the HVAC equipment to estimate a corresponding time step specific value of a heat disturbance; and

operating the HVAC equipment over the time period using a model-based control technique based on the time step specific values of the heat disturbance.

9. The method of claim 8 , wherein the time period is a historical time period, the method further comprising performing a system identification process based on the time step specific values of the heat disturbance for the historical time period to identify a predictive model configured to predict future time step specific values of the heat disturbance, wherein the predictive model is used in the model-based control technique.

10. The method of claim 9 , wherein the system identification process comprises identifying a scaling parameter that scales the future time step specific values of the heat disturbance.

11. The method of claim 8 , further comprising identifying a Kalman gain and a stochastic model of the heat disturbance based on the time step specific values of the heat disturbance or predicted heat disturbance values based on the time step specific values of the heat disturbance, the Kalman gain and the stochastic model used in the model-based control technique.

12. The method of claim 11 , wherein identifying the Kalman gain and the stochastic model comprises performing a multi-step system identification process.

13. The method of claim 8 , further comprising filtering the time step specific values of the heat disturbance through at least one of:

an anti-spike filter; or

a smoothing filter.

14. The method of claim 8 , further comprising generating a predictive model configured to predict future time step specific values of the heat disturbance by fitting the time step specific values of the heat disturbance to at least one of:

a Gaussian function;

a sinusoid function; or

a user-defined function.

15. A controller for operating heating, ventilation, or air conditioning (HVAC) equipment of a building, the controller comprising:

one or more processors; and

one or more non-transitory computer-readable media storing instructions that, when executed by the one or more processors, cause the one or more processors to perform operations comprising:

estimating a thermal resistance between air of a zone of the building and air of an external space outside the zone using a plurality of values of a temperature of the air of the zone, a temperature of the air of the external space, and a heat transfer rate of the HVAC equipment that provides heating or cooling to the zone, each of the plurality of values corresponding to a different time step within a time period;

for a plurality of time steps within the time period, using the thermal resistance between the air of the zone and the air of the external space, a time step specific value of the temperature of the air of the zone, a time step specific value of the temperature of the air of the external space, and a time step specific value of the heat transfer rate of the HVAC equipment to estimate a corresponding time step specific value of a heat disturbance; and

operating the HVAC equipment over the time period using a model-based control technique based on the time step specific values of the heat disturbance.

16. The controller of claim 15 , wherein the time period is a historical time period, the operations further comprising performing a system identification process based on the time step specific values of the heat disturbance for the historical time period to identify a predictive model configured to predict future time step specific values of the heat disturbance, wherein the predictive model is used in the model-based control technique.

17. The controller of claim 16 , wherein the system identification process comprises identifying a scaling parameter that scales the future time step specific values of the heat disturbance.

18. The controller of claim 15 , the operations further comprising performing a multi-step system identification process based on the time step specific values of the heat disturbance or predicted heat disturbance values based on the time step specific values of the heat disturbance to identify a Kalman gain and a stochastic model of the heat disturbance, the Kalman gain and the stochastic model used in the model-based control technique.

19. The controller of claim 15 , the operations further comprising filtering the time step specific values of the heat disturbance through at least one of:

an anti-spike filter; or

a smoothing filter.

20. The controller of claim 15 , the operations further comprising generating a predictive model configured to predict future time step specific values of the heat disturbance by fitting the time step specific values of the heat disturbance to at least one of:

a Gaussian function;

a sinusoid function; or

a user-defined function.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 9, 2024
From: JOHNSON CONTROLS TYCO IP HOLDINGS LLP
To: TYCO FIRE & SECURITY GMBH
Reel/Frame 067056/0552 →
NUNC PRO TUNC ASSIGNMENT Recorded Feb 4, 2022
From: JOHNSON CONTROLS TECHNOLOGY COMPANY
To: JOHNSON CONTROLS TYCO IP HOLDINGS LLP
Reel/Frame 058959/0764 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 14, 2020
From: ALANQAR, ANAS W.I.; DU, FANG; WENZEL, MICHAEL J.; ELLIS, MATTHEW J.; ELBSAT, MOHAMMAD N.
To: JOHNSON CONTROLS TECHNOLOGY COMPANY
Reel/Frame 052393/0605 →
Continuity (2)
Continuation In Part 16418715 · May 21, 2019
Related Publication 20200370771A1 · Nov 26, 2020
Cited By (3)
US 12,399,467 US 12,406,193 US 12,624,854