IP Library Granted Patent US 11,311,660
Granted Patent B2
US 11,311,660 · App. 16/645,372 · Granted Apr 26, 2022

Uterine distension fluid management system and method

Inventors: David J. Holigan (Marlborough, MA); Joanna Myczkowska (Marlborough, MA); William Lucas Churchill (Marlborough, MA); Danny Macari (Marlborough, MA)
Assignee: Hologic, Inc.
A61M1/777A61M2205/18A61M2205/3393A61M2205/50A61M2205/581A61M2205/583
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,311,660
App. No.
16/645,372
Granted
Apr 26, 2022
Kind
B2
Abstract

A method for operating a fluid management system includes automatically detecting an unstable condition in the system, which may include detecting a large change in the supply fluid amount (indicative of a bag change), detecting a large change in the waste fluid amount (indicative of a bag change), or detecting a large difference between the amount of fluid dispensed as measured by the weight data and the amount of fluid dispensed as measured by the flow data (indicative of a blockage in the supply tubing). The method further includes adjusting the operating mode of the system during the unstable condition, which may include switching to using flow data rather than weight data to track the fluid deficit during a supply bag exchange, halting operation of an outflow pump during a waste container exchange, and/or halting operation of the system during a blockage in the supply tubing.

Claims (39)

1. A fluid management system, comprising:

a supply fluid weighing device configured for weighing a supply fluid container;

an inflow pump configured to pump fluid out of the supply fluid container; and

a processor coupled to each of the supply fluid weighing device and the inflow pump, wherein the processor is configured to

determine whether the fluid management system is in a stable condition or an unstable condition,

operate the fluid management system according to a first set of operating conditions when the system is in the stable condition, wherein the first set of operating conditions comprises using weight data obtained from the supply fluid weighing device to calculate the fluid deficit, and

operate the fluid management system according to a second set of operating conditions that are different than the first set of operating conditions when the system is in the unstable condition, wherein operating the fluid management system according to the second set of operating conditions comprises

receiving flow data from the inflow pump; and

using the flow data to calculate a fluid deficit during the unstable condition.

2. The fluid management system of claim 1 , wherein the supply fluid weighing device comprises one or more load cells.

3. The fluid management system of claim 1 , wherein the processor is configured to

obtain a first weight measurement from the supply fluid weighing device;

obtain a second weight measurement from the supply fluid weighing device after obtaining the first weight measurement;

determine a difference between the second weight measurement and the first weight measurement; and

determine whether the system is in the stable condition or the unstable condition based upon the difference between the second weight measurement and the first weight measurement.

4. The fluid management system of claim 3 , wherein the processor is configured to determine that the system is in the stable condition if the difference between the second weight measurement and the first weight measurement is within a predetermined limit.

5. The fluid management system of claim 4 , wherein the processor is configured to determine that the system is in the unstable condition if the difference between the second weight measurement and the first weight measurement exceeds the predetermined limit.

6. The fluid management system of claim 1 , wherein the supply fluid weighing device comprises one or more load cells, and wherein the processor is configured to

obtain a first weight measurement from the supply fluid weighing device;

obtain a second weight measurement from the supply fluid weighing device after obtaining the first weight measurement;

determine a difference between the second weight measurement and the first weight measurement; and

determine whether the system is in the stable condition or the unstable condition based upon the difference between the second weight measurement and the first weight measurement.

7. The fluid management system of claim 6 , wherein the processor is configured to determine that the system is in the stable condition if the difference between the second weight measurement and the first weight measurement is within a predetermined limit, and wherein the processor is configured to determine that the system is in the unstable condition if the difference between the second weight measurement and the first weight measurement exceeds the predetermined limit.

8. A method for operating a fluid management system, the fluid management system comprising a supply fluid container, a supply fluid weighing device operatively coupled with the supply fluid container, an inflow pump configured to pump fluid out of the supply fluid container, a waste fluid container, a waste fluid weighing device operatively coupled with the waste fluid container, an outflow pump configured to pump fluid into the waste fluid container, and a processor operatively coupled to each of the supply fluid weighing device, the waste fluid weighing device, the inflow pump and the outflow pump, the method comprising:

determining whether the fluid management system is in a stable condition or an unstable condition;

operating the fluid management system according to a first set of operating conditions when the system is in the stable condition, wherein the first set of operating conditions comprises calculating the fluid deficit based on respective weight measurements received from the supply fluid weighing device and the waste fluid weighing device; and

operating the fluid management system according to a second set of operating conditions that are different than the first set of operating conditions when the system is in the unstable condition, wherein operating the fluid management system according to the second set of operating conditions comprises

receiving flow data from the inflow pump, and

using the flow data to calculate a fluid deficit during the unstable condition.

9. The method of claim 8 , wherein determining whether the system is in the stable condition or the unstable condition comprises

receiving a current weight measurement from the supply fluid weighing device;

comparing the current weight measurement to a previous weight measurement received from the supply fluid weighing device; and

determining that the system is in the stable condition if the difference between the current weight measurement and the previous weight measurement is within a predetermined limit.

10. The method of claim 9 , further comprising determining that the system is in the unstable condition if the difference between the current weight measurement and the previous weight measurement exceeds the predetermined limit.

11. The method of claim 8 , wherein determining whether the system is in the stable condition or the unstable condition comprises

receiving a current weight measurement from the supply fluid weighing device;

comparing the current weight measurement to a previous weight measurement received from the supply fluid weighing device; and

determining that the system is in the stable condition if the difference between the current weight measurement and the previous weight measurement is within a predetermined limit.

12. The method of claim 11 , further comprising determining that the system is in the unstable condition if the difference between the current weight measurement and the previous weight measurement exceeds the predetermined limit.

Assignments (2)
SECURITY INTEREST Recorded Apr 8, 2026
From: BIOTHERANOSTICS, INC.; GEN-PROBE INCORPORATED; GEN-PROBE PRODESSE, INC.; CYTYC CORPORATION; SUROS SURGICAL SYSTEMS, INC.; GYNESONICS, INC.; BOLDER SURGICAL, LLC; FAXITRON BIOPTICS, LLC; HEALTH BEACONS, INC.; HOLOGIC, INC.
To: ROYAL BANK OF CANADA, AS COLLATERAL AGENT
Reel/Frame 075462/0440 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 6, 2020
From: HOLIGAN, DAVID J.; MYCZKOWSKA, JOANNA; CHURCHILL, WILLIAM LUCAS; MACARI, DANNY
To: HOLOGIC, INC.
Reel/Frame 052042/0682 →
Continuity (2)
Provisional Application 62716300 · Aug 8, 2018
Related Publication 20200297900A1 · Sep 24, 2020