Systems and methods for on-line pigging and spalling of coker furnace outlets

Inventors: Brian Doerksen (Bartlesville, OK); John Ward (Katy, TX); Rick Heniford (Katy, TX); Scott Alexander (Billings, MT); Richard Von Brecht (Katy, TX); Jorge Gonzalez (League City, TX)
Assignee: BECHTEL ENERGY TECHNOLOGIES & SOLUTIONS, INC.
C10B43/06B08B7/0071B08B9/032B08B9/0325B08B9/0328B08B9/055B08B9/0551C10B33/006C10G9/16C10G75/00G05D7/0635G05D16/16C10B55/00
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,286,424
App. No.
16/659,898
Granted
Mar 29, 2022
Kind
B2
Abstract

Systems and methods for safe on-line pigging decoking of a coker furnace tubes and which also permits on-line spalling operations.

Claims (27)

1. A method for on-line pigging in a tube coil for a furnace in a delayed coking system, which comprises:

terminating a process fluid supply flow to the furnace;

introducing high pressurized steam from a first pressurized steam source through the tube coil and a main line, and from a second pressurized steam source through a second line connected to the main line;

isolating a vent, in fluid communication with the second line, from the main line by introducing high pressurized steam from a third pressurized steam source through the second line to maintain a constant pressure against one side of first and second closed valves positioned in fluid communication with the vent between the vent and the main line while introducing the high pressurized steam from the first pressurized steam source and the second pressurized steam source;

terminating the introduction of the high pressurized steam from the first pressurized steam source, the second pressurized steam source and the third pressurized steam source;

isolating a drum input line, in fluid communication with the main line, from a portion of the main line by introducing high pressurized steam from a fourth pressurized steam source through a third line connected to the main line to maintain a constant pressure against one side of third, fourth and fifth valves in fluid communication with the drum input line;

disconnecting the tube coil from the main line and the first pressurized steam source;

connecting the tube coil to a pigging unit after the main line reaches atmospheric pressure; and

introducing water from a water source to the pigging unit for driving a pig through the tube coil.

2. The method of claim 1 , further comprising:

supplying steam to the tube coil and to a closed blowdown system header until the tube coil of the furnace reaches at least about 400° F. and not more than about 700° F. and until the main line is dry, while isolating the vent by introducing the third pressurized steam source to block the first and second closed valves in fluid communication with the vent; and

terminating flow of the steam to the closed blowdown system header and introducing high pressurized steam from a fifth pressurized steam source to block one of the third, fourth and fifth closed valves and a sixth closed valve in fluid communication with the closed blowdown system header; and

resuming the flow of the process fluid supply to the furnace.

3. The method of claim 1 , wherein isolating the vent comprises positioning a flow controller between the third pressurized steam source and the second line.

4. The method of claim 1 , wherein terminating the introduction of the high pressurized steam comprises providing a pressure controller in fluid communication with the fourth pressurized steam source.

5. The method of claim 1 , wherein introducing high pressurized steam from the fourth pressurized steam source comprises introducing the high pressurized steam at a pressure greater than the pressure of high pressurized steam on an opposite side of & one of the third, fourth and fifth closed valves positioned between the third line and the drum input line.

6. The method of claim 2 , wherein supplying steam to the tube coil comprises restricting an opening of the sixth closed valve between the fifth pressurized steam source and the closed blowdown system header to maintain pressure on one of the third, fourth and fifth closed valves positioned between the third line and the drum input line.

7. The method of claim 1 , wherein the high pressurized steam from the third pressurized steam source to the first and second closed valves provides blocking steam.

8. The method of claim 1 , further comprising closing a spectacle blind after terminating the introduction of the high pressurized steam from the first pressurized steam source, the spectacle blind being positioned between one of the first and second closed valves and the vent.

9. The method of claim 1 , wherein the second pressurized steam source provides spool purging steam to the second line.

10. The method of claim 4 , wherein the pressurized steam exiting the pressure controller is spool purging steam.

11. The method of claim 1 , wherein, the fifth pressurized steam source provides a blocking steam purge to a fourth line between the fifth pressurized steam source and a closed blowdown system header.

12. The method of claim 1 , wherein introducing high pressurized steam from the fifth pressurized steam source comprises supplying the high pressurized steam from the first pressurized steam source to an inlet of the tube coil until all output from the tube coil is dispensed to the delayed coking drum or a closed blowdown system header.

13. The method of claim 1 , wherein the high pressurized steam from the fifth pressurized steam source provides blocking steam.

14. The method of claim 1 , wherein disconnecting the tube coil comprises:

disconnecting an inlet swing arm coupled with the tube coil from the process fluid supply and an outlet swing arm coupled with the tube coil from the main line; and

connecting the inlet swing arm to a swing arm coupled with the pigging unit and the outlet swing arm to another swing arm coupled with the pigging unit.

Assignments (2)
CHANGE OF NAME Recorded Aug 24, 2021
From: BECHTEL HYDROCARBON TECHNOLOGY SOLUTIONS, INC.
To: BECHTEL ENERGY TECHNOLOGIES & SOLUTIONS, INC.
Reel/Frame 057282/0092 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 23, 2019
From: DOERKSEN, BRIAN; WARD, JOHN; HENIFORD, RICK; ALEXANDER, SCOTT; VON BRECHT, RICHARD; GONZALES, JORGE
To: BECHTEL HYDROCARBON TECHNOLOGY SOLUTIONS, INC.
Reel/Frame 050799/0821 →