IP Library Granted Patent US 11,745,449
Granted Patent B2
US 11,745,449 · App. 16/660,258 · Granted Sep 5, 2023

Adhesive barrier design to ensure proper paste flow during blade close process

Inventors: Amir Salimi (Providence, RI); Christopher Raine (Cranston, RI)
B29C70/742B29C70/42B29C70/682B29C70/845
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,745,449
App. No.
16/660,258
Granted
Sep 5, 2023
Kind
B2
Abstract

Devices, systems, and methods of improving paste flow during the manufacture of wind turbine blades are provided. When the first turbine blade half is aligned with the second turbine blade half, a gap is formed between the first shell and the bond cap. The assembly includes a first mold half corresponding to the first turbine blade half and a second mold half corresponding to the second turbine blade half. When the first mold is aligned with the second mold, a second gap is formed. A first barrier is disposed within the first gap and a second barrier disposed within the second gap thereby fluidly sealing a volume defined by the first gap and the second gap to direct adhesive paste flow along the blade span between the adjoining leading and trailing edges.

Claims (20)

1. An assembly comprising:

a first turbine blade half comprising a first shell defining a first perimeter and a first interface surface extending along the first perimeter;

a second turbine blade half comprising a second shell defining a second perimeter and a second interface surface extending along the second perimeter, the second blade half comprising a bond cap extending from the perimeter where, when the first interface surface is aligned with the second interface surface, a first gap is formed between the first shell and the bond cap;

a first mold half comprising a first mold surface corresponding to the first shell;

a second mold half comprising a first mold surface corresponding to the second shell where, when the first mold half is aligned with the second mold half, a second gap is formed between the first mold half and the second mold half, wherein the first gap is in fluid communication with the second gap;

a first barrier disposed within the first gap; and

a second barrier disposed within the second gap thereby fluidly sealing a volume defined by the first gap and the second gap, the second barrier including a vent operable to selectively open or close;

wherein the vent is formed by at least a portion of one of the first mold half or the second mold half, and at least a portion of the second barrier;

wherein upon closure of the first mold half and the second mold half, a paste exits the vent.

2. The assembly of claim 1 , further comprising the paste is disposed on the first interface surface and/or the second interface surface.

3. The assembly of claim 1 , wherein the width of the first gap is between about 2 mm and 15 mm.

4. The assembly of claim 1 , wherein the width of the second gap is between about 2 mm and 15 mm.

5. The assembly of claim 1 , wherein the vent is one of a plurality of vents on the second barrier.

6. The assembly of claim 5 , wherein the plurality of vents are spaced at a predetermined distance from one another.

7. The assembly of claim 1 , wherein a plurality of first and second barriers are uniformly spaced along a leading and trailing edge of the first blade half and the second blade half.

8. The assembly of claim 1 , wherein the first barrier is permanently attached to at least one of the first turbine blade half and the second turbine blade half.

9. The assembly of claim 1 , wherein the second barrier is removably attached to at least one of the first mold half and the second mold half.

10. The assembly of claim 1 , wherein the vent on the second barrier is cylindrically shaped.

11. The assembly of claim 1 , wherein the vent on the second barrier is asymmetrically shaped.

12. The assembly of claim 1 , wherein the vent on the second barrier includes an inspection window to visually confirm the applied paste is free of voids.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 10, 2024
From: SALIMI, AMIR; RAINE, CHRISTOPHER
To: TPI COMPOSITES, INC.
Reel/Frame 066083/0530 →
SECURITY INTEREST Recorded Dec 14, 2023
From: TPI COMPOSITES, INC.
To: OAKTREE FUND ADMINISTRATION, LLC
Reel/Frame 066014/0207 →
Continuity (2)
Provisional Application 62748835 · Oct 22, 2018
Related Publication 20200122416A1 · Apr 23, 2020