IP Library Granted Patent US 11,453,981
Granted Patent B2
US 11,453,981 · App. 16/660,629 · Granted Sep 27, 2022

Rail plate retainer with stabilized gripping jaws for use with rail tie exchanger

Inventors: Patrick Joseph Pritzl (Franksville, WI); Kyle Matthew Neubauer (Greenfield, WI); Gregory John Long (Mount Pleasant, WI); Ryan Matthew Holschbach (Mukwonago, WI); James W. Boyd (New Berlin, WI)
Assignee: NORDCO INC.
E01B29/32E01B29/10
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,453,981
App. No.
16/660,629
Granted
Sep 27, 2022
Kind
B2
Abstract

A rail tie plate retaining workhead is provided for use in conjunction with a rail tie replacement machine moving along a railroad track having a pair of rails. The workhead includes a workhead frame configured for movement along the track relative to the rail tie replacement machine, and a pair of plate retaining frames, each frame associated with a respective one of the rails, and being connected to the workhead frame. Each plate retaining frame has at least one rail guide wheel connected to the retaining frame using a fluid powered cylinder, the wheels vertically reciprocating between an extended position, in which the workhead is raised to a travel position, and a retracted position, in which the workhead is lowered to a working position in operational relationship with at least one targeted rail tie plate.

Claims (23)

1. A rail tie plate retaining workhead for use in conjunction with a rail tie exchanger moving along a railroad track having a pair of rails, said workhead comprising:

a workhead frame configured for movement along the track relative to the rail tie replacement machine;

a pair of plate retaining frames, each said plate retaining frame associated with a respective one of the rails, and being connected to said workhead frame;

each said plate retaining frame having at least one rail guide wheel connected to said retaining frame using a fluid powered cylinder, said wheels vertically reciprocating between an extended position, in which said workhead is raised to a travel position, and a retracted position, in which said workhead is lowered to a working position in operational relationship with at least one targeted rail tie plate; and

a ballast scraper assembly mounted to said workhead frame between said plate retaining frames.

2. The rail tie plate retaining workhead of claim 1 , further including a pair of opposed rail tie plate gripping jaws connected to each said plate retaining frame, said jaws being configured for reciprocating along a direction parallel to the rails between a plate release position and a plate grabbing position.

3. The rail tie plate retaining workhead of claim 2 , wherein each said plate retaining frame has a pair of spaced, parallel guide shafts, and a pair of said jaws are slidable along said guide shafts between a plate release position and a plate grabbing position.

4. The rail tie plate retaining workhead of claim 1 , wherein said ballast scraper includes vertically reciprocating scraper blades for engaging an upper surface of a tie being replaced.

5. The rail tie plate retaining workhead of claim 4 , wherein said ballast scraper includes two pair of independently operating scraper blades.

6. The rail tie plate retaining workhead of claim 4 , wherein said scraper blades are provided with an LVDT for adjusting a height of the blades relative to a bottom surface of a tie plate grasped in said gripping jaws.

7. The rail tie plate retaining workhead of claim 1 , wherein said ballast scraper is oriented transversely to said plate retaining frames.

8. The rail tie plate retaining workhead of claim 1 further including a rail clamp associated with each said plate retainer frame.

9. A rail tie plate retaining workhead for use in conjunction with a rail tie replacement machine moving along a railroad track having a pair of rails, said workhead comprising:

a workhead frame configured for movement along the track relative to the rail tie replacement machine;

a pair of plate retaining frames, each said plate retaining frame associated with a respective one of the rails, and being connected to said workhead frame;

a pair of opposed rail tie plate gripping jaws connected to each said plate retaining frame, said jaws being configured for reciprocating along a direction parallel to the rails between a plate release position and a plate grabbing position, wherein each said plate retaining frame has a pair of spaced, parallel guide shafts, and a pair of said jaws are slidable along said guide shafts between a plate release position and a plate grabbing position; and

a ballast scraper assembly mounted to said workhead frame between said plate retaining frames.

10. The rail plate retaining workhead of claim 9 , wherein each said plate retaining frame has at least one rail guide wheel connected to said retaining frame using a fluid powered cylinder, said wheels vertically reciprocating between an extended position, in which said workhead is raised to a travel position, and a retracted position, in which said workhead is lowered to a working position in operational relationship with at least one targeted rail tie plate.

11. The rail tie plate retaining workhead of claim 10 , wherein said ballast scraper includes vertically reciprocating scraper blades for engaging an upper surface of a tie being replaced.

12. The rail tie plate retaining workhead of claim 11 , wherein said ballast scraper includes two pair of independently operating scraper blades.

13. The rail tie plate retaining workhead of claim 11 , wherein said scraper blades are provided with an LVDT for adjusting a height of the blades relative to a bottom surface of a tie plate grasped in said gripping jaws.

14. The rail tie plate retaining workhead of claim 10 , wherein said ballast scraper is oriented transversely to said plate retaining frames.

15. The rail tie plate retaining workhead of claim 9 further including a rail clamp associated with each said plate retainer frame.

Assignments (3)
PATENT RELEASE AND REASSIGNMENT Recorded Apr 5, 2021
From: ARES CAPITAL CORPORATION
To: NORDCO, INC.
Reel/Frame 055818/0612 →
SECURITY INTEREST Recorded May 7, 2020
From: NORDCO INC.
To: ARES CAPITAL CORPORATION, AS AGENT
Reel/Frame 052604/0195 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 22, 2019
From: PRITZL, PATRICK JOSEPH; NEUBAUER, KYLE MATTHEW; LONG, GREGORY JOHN; HOLSCHBACH, RYAN MATTHEW; BOYD, JAMES W.
To: NORDCO INC.
Reel/Frame 050795/0529 →
Continuity (2)
Provisional Application 62751319 · Oct 26, 2018
Related Publication 20200131716A1 · Apr 30, 2020