IP Library Granted Patent US 11,081,889
Granted Patent B2
US 11,081,889 · App. 16/729,100 · Granted Aug 3, 2021

Systems and methods for remote or local shut-off of a photovoltaic system

Inventors: Maxym Makhota (Cupertino, CA); Daniel Eizips (Sunnyvale, CA); Dan Kikinis (Los Altos, CA)
Assignee: Tigo Energy, Inc.
H02J3/383G05B9/02H01L31/02021H02J1/00H02J3/38H02M7/44H02S40/30G06F11/0736G06F11/0757G06F11/0793Y02E10/50
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,081,889
App. No.
16/729,100
Granted
Aug 3, 2021
Kind
B2
Abstract

Systems and methods for shut-down of a photovoltaic system. In one embodiment, a method implemented in a computer system includes: communicating, via a central controller, with a plurality of local management units (LMUs), each of the LMUs coupled to control a respective solar module; receiving, via the central controller, a shut-down signal from a user device (e.g., a hand-held device, a computer, or a wireless switch unit); and in response to receiving the shut-down signal, shutting down operation of the respective solar module for each of the LMUs.

Claims (49)

1. A solar module, comprising:

a photovoltaic panel having an output;

a local management unit connected to the photovoltaic panel to receive the output as input, the local management unit having:

a communication module to receive communications from a remote unit, the communications configured to cause the solar module to change from a first mode of outputting power to a second mode of being shut down from outputting power;

a controller;

a switch configured to connect the output of the photovoltaic panel for providing an operating voltage to the controller;

a first circuit path to provide power from the output of the photovoltaic panel to the controller in the first mode; and

a second circuit path to provide power from the output of the photovoltaic panel to the controller in the second mode;

wherein in the first mode, the switch is open;

wherein in the second mode, the controller causes the local management unit to shut down outputting power from the solar module, and causes the switch to close.

2. The solar module of claim 1 , wherein the communications include heartbeat signals from a central controller.

3. The solar module of claim 2 , wherein the communication module is configured to receive the heartbeat signals via a wireless communication channel.

4. The solar module of claim 2 , wherein the communication module is configured to receive the heartbeat signals via wiring connected to output terminals of the local management unit.

5. The solar module of claim 4 , wherein the local management unit includes a power converter configured to convert the input to an output on the output terminals of the local management unit.

6. The solar module of claim 2 , wherein the local management unit is configured to change from the first mode to the second mode in response to an instance of time out of the heartbeat signals.

7. The solar module of claim 1 , wherein the communications include a shutdown command from a controller remote from the solar module.

8. The solar module of claim 7 , wherein the local management unit is configured to change from the first mode to the second mode in response to the shutdown command.

9. The solar module of claim 1 , wherein the local management unit is configured to change from the first mode to the second mode after detecting a fault.

10. The solar module of claim 9 , wherein the fault is detected in power bus wiring, in a junction box, or in a head end.

11. A method implemented in a solar module, the method comprising:

generating, by a photovoltaic panel, an output;

receiving, in a local management unit connected to the photovoltaic panel, the output as input, the local management unit having a controller and a communication module to receive communications from a remote unit, the communications configured to cause the solar module to change from a first mode of outputting power to a second mode of being shut down from outputting power;

providing power using a first circuit path from the output of the photovoltaic panel to the controller in the first mode;

providing power using a second circuit path from the output of the photovoltaic panel to the controller in the second mode, wherein a switch connects the output of the photovoltaic panel to provide an operating voltage to the controller; and

causing, by the controller in the second mode, the local management unit to shut down outputting power from the solar module, and to close the switch.

12. The method of claim 11 , wherein the communications include heartbeat signals from a central controller.

13. The method of claim 12 , wherein the communication module is configured to receive the heartbeat signals via a wireless communication channel.

14. The method of claim 12 , wherein the communication module is configured to receive the heartbeat signals via wiring connected to output terminals of the local management unit.

15. The method of claim 14 , wherein the local management unit includes a power converter configured to convert the input to an output on the output terminals of the local management unit.

16. The method of claim 12 , wherein the local management unit is configured to change from the first mode to the second mode in response to an instance of time out of the heartbeat signals.

17. The method of claim 11 , wherein the communications include a shutdown command from a controller remote from the solar module.

18. A system, comprising:

a remote unit; and

a solar module comprising:

a photovoltaic panel having an output;

a local management unit connected to the photovoltaic panel to receive the output as input, the local management unit having:

a communication module to receive communications from the remote unit, the communications configured to cause the solar module to change from a first mode of outputting power to a second mode of being shut down from outputting power;

a controller;

a switch configured to connect the output of the photovoltaic panel for providing an operating voltage to the controller;

a first circuit path to provide power from the output of the photovoltaic panel to the controller in the first mode; and

a second circuit path to provide power from the output of the photovoltaic panel to the controller in the second mode;

wherein in the first mode, the switch is open;

wherein in the second mode, the controller causes the local management unit to shut down outputting power from the solar module, and causes the switch to close.

19. The solar module of claim 1 , wherein the switch is a first switch, the local management unit further having:

a second switch configured to connect the output of the photovoltaic panel to string wiring for outputting power from the solar module;

wherein in the first mode, the controller causes the second switch to close.

20. The solar module of claim 1 , wherein:

the local management unit further has a diode; and

the first switch connects the diode to the output of the photovoltaic panel, and the diode is configured to provide a voltage drop for providing the operating voltage to the controller when in the second mode.

Assignments (8)
SECURITY INTEREST Recorded Mar 31, 2026
From: TIGO ENERGY, INC.
To: WELLS FARGO BANK, NATIONAL ASSOCIATION
Reel/Frame 075306/0414 →
TERMINATION AND RELEASE OF SECURITY INTEREST IN INTELLECTUAL PROPERTY RECORDED AT REEL 52252, FRAME 0289 Recorded Mar 30, 2026
From: GALLAGHER IP SOLUTIONS LLC, AS SUCCESSOR TO NEWLIGHT CAPITAL, LLC; UMB BANK, NATIONAL ASSOCIATION
To: TIGO ENERGY, INC.
Reel/Frame 075311/0457 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 20, 2026
From: TIGO ENERGY, INC.
To: TIGO ENERGY INNOVATIONS LLC
Reel/Frame 074447/0465 →
CORRECTIVE ASSIGNMENT TO CORRECT THE NATURE OF CONVEYANCE PREVIOUSLY RECORDED AT REEL: 58755 FRAME: 516. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT. Recorded Oct 2, 2025
From: TIGO ENERGY, INC.
To: NEWLIGHT CAPITAL LLC
Reel/Frame 072868/0423 →
RELEASE OF SECURITY INTEREST Recorded Feb 22, 2023
From: NEWLIGHT CAPITAL LLC; UMB BANK, NATIONAL ASSOCIATION, AS TRUSTEE
To: TIGO ENERGY, INC.
Reel/Frame 062821/0250 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 18, 2022
From: TIGO ENERGY, INC.
To: NEWLIGHT CAPITAL LLC
Reel/Frame 058755/0516 →
SECURITY INTEREST Recorded Mar 27, 2020
From: TIGO ENERGY, INC.
To: NEWLIGHT CAPITAL, LLC; UMB BANK, NATIONAL ASSOCIATION, AS TRUSTEE
Reel/Frame 052252/0289 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 31, 2019
From: MAKHOTA, MAXYM; EIZIPS, DANIEL; KIKINIS, DAN
To: TIGO ENERGY, INC.
Reel/Frame 051394/0004 →
Cited By (2)
US 12,433,063 US 12,519,423