IP Library Granted Patent US 11,369,920
Granted Patent B2
US 11,369,920 · App. 16/731,262 · Granted Jun 28, 2022

Multi-mode air drying system

Inventors: Stefano Vezil (Trieste, IT); Paolo Depiero (Tavagnacco, IT); Giovanni Battista Capellari (Fogliano-Redipuglia, IT)
Assignee: INGERSOLL-RAND INDUSTRIAL U.S., INC.
B01D53/265F25B39/00
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,369,920
App. No.
16/731,262
Granted
Jun 28, 2022
Kind
B2
Abstract

A compressed air drying system is provided for removing moisture from compressed air. The dryer operates in two modes in response to the demand for compressed air. In a first mode of operation, a refrigeration compressor runs continuously and the speed of a condenser fan is varied to maintain a constant cooling temperature. In a second mode of operation, the refrigeration compressor runs intermittently between on and off periods. As result, the cooling temperature fluctuates during the second mode of operation.

Claims (24)

1. A method of drying compressed air, comprising:

supplying compressed air to one side of a first heat exchanger;

supplying refrigerant to another side of the first heat exchanger;

in a first mode when a demand for the compressed air is above a threshold, running a compressor continuously and varying a speed of a condenser fan in response to the demand for the compressed air, the compressor compressing the refrigerant after passing through the first heat exchanger and the condenser fan blowing air across a second heat exchanger to cool and condense the refrigerant after passing through the compressor; and

in a second mode when a demand for the compressed air is below the threshold, running the compressor intermittently between on periods and off periods, the compressed air passing through the first heat exchanger while the refrigerant passes through the first heat exchanger during the on periods, and the compressed air passing through the first heat exchanger without the refrigerant passing through the first heat exchanger during the off periods, wherein in the second mode, the speed of the condenser fan is set to a constant higher speed than the speed of the condenser fan prior to a shift from the first mode to the second mode to maintain a threshold temperature on the one side of the first heat exchanger during the off periods.

2. The method according to claim 1 , wherein each of the off periods is between 2 and 30 minutes.

3. The method according to claim 1 , wherein each of the on periods is between 2 and 30 minutes.

4. The method according to claim 1 , wherein the compressor is a fixed speed compressor.

5. The method according to claim 1 , further comprising preheating and precooling the compressed air in a third heat exchanger, the compressed air passing through one side of the third heat exchanger before passing through the first heat exchanger, and the compressed air passing through another side of the third heat exchanger after passing through the first heat exchanger.

6. The method according to claim 1 , further comprising separating moisture from the compressed air after the compressed air passes through the first heat exchanger.

7. The method according to claim 1 , further comprising converting the refrigerant from a liquid to a gas before the refrigerant passes through the first heat exchanger.

8. The method according to claim 1 , further comprising measuring a first temperature of the refrigerant and determining the on periods and off periods in response to the first temperature.

9. The method according to claim 8 , wherein the first temperature is measured between an expansion valve and the first heat exchanger.

10. The method according to claim 9 , further comprising measuring a second temperature of the refrigerant between the first heat exchanger and the compressor, and determining the on periods and off periods in response to a difference between the first temperature and the second temperature.

11. The method according to claim 1 , wherein the refrigerant passing through the first heat exchanger is cooled below 0° C. during the on periods and the refrigerant within the first heat exchanger warms above 0° C. during the off periods.

12. The method according to claim 11 , wherein the refrigerant passing through the first heat exchanger is cooled to not less than 10° C. during the on periods.

13. The method according to claim 11 , wherein the refrigerant within the first heat exchanger warms to not more than 6° C. during the off periods.

14. The method according to claim 1 , wherein the speed of the condenser fan is varied in the first mode to maintain a constant temperature of the refrigerant such that the speed of the condenser fan is increased to decrease a temperature of the refrigerant and the speed of the condenser fan is decreased to increase the temperature of the refrigerant, the threshold being a speed of the condenser fan in the first mode below a set value.

15. The method according to claim 1 , wherein the condenser fan runs at a constant speed during the on periods.

16. The method according to claim 1 , wherein the condenser fan runs at full speed during the on periods.

17. The method according to claim 1 , wherein each of the off periods is between 2 and 30 minutes, and each of the on periods is between 2 and 30 minutes.

18. The method according to claim 17 , further comprising preheating and precooling the compressed air in a third heat exchanger, the compressed air passing through one side of the third heat exchanger before passing through the first heat exchanger, and the compressed air passing through another side of the third heat exchanger after passing through the first heat exchanger, further comprising separating moisture from the compressed air after the compressed air passes through the first heat exchanger, and further comprising converting the refrigerant from a liquid to a gas before the refrigerant passes through the first heat exchanger.

19. The method according to claim 18 , wherein the compressor is a fixed speed compressor, further comprising measuring a first temperature of the refrigerant and determining the on periods and off periods in response to the first temperature, wherein the refrigerant passing through the first heat exchanger is cooled below 0° C. during the on periods and the refrigerant within the first heat exchanger warms above 0° C. during the off periods.

20. The method according to claim 19 , wherein the refrigerant passing through the first heat exchanger is cooled to not less than 10° C. during the on periods, the refrigerant within the first heat exchanger warms to not more than 6° C. during the off periods, and the condenser fan runs at a constant speed during the on periods.

Assignments (3)
RELEASE OF PATENT SECURITY INTEREST Recorded May 14, 2024
From: CITIBANK, N.A., AS COLLATERAL AGENT
To: HASKEL INTERNATIONAL, LLC; MILTON ROY, LLC; INGERSOLL-RAND INDUSTRIAL U.S., INC.
Reel/Frame 067401/0811 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 5, 2020
From: VEZIL, STEFANO; DEPIERO, PAOLO; CAPELLARI, GIOVANNI BATTISTA
To: INGERSOLL-RAND INDUSTRIAL U.S., INC.
Reel/Frame 052026/0578 →
SECURITY INTEREST Recorded Mar 3, 2020
From: CLUB CAR, LLC; MILTON ROY, LLC; HASKEL INTERNATIONAL, LLC; INGERSOLL-RAND INDUSTRIAL U.S., INC.
To: CITIBANK, N.A., AS ADMINISTRATIVE AGENT AND COLLATERAL AGENT
Reel/Frame 052072/0381 →