IP Library Granted Patent US 11,132,892
Granted Patent B1
US 11,132,892 · App. 16/740,720 · Granted Sep 28, 2021

Abberation detection technology

Inventor: Stephen Scott Trundle (Falls Church, VA)
Assignee: Alarm.com Incorporated
G08B29/185G05B19/042G06F11/00G08B29/04G08B13/00G08B25/14
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,132,892
App. No.
16/740,720
Granted
Sep 28, 2021
Kind
B1
Abstract

In some implementations, techniques are described for detecting abnormal installations in a property monitored by a monitoring (e.g., security) system. For instance, an aberration engine may be used to detect an abnormal sensor or system installation within a property based on comparing detected installation data against local installation patterns of local providers within a certain proximity to the property. In some examples, the attributes (e.g., installation time, components used, number of tests performed, etc.) of a monitoring system installation, including installation of components of the monitoring system, may be compared to average installation times of other nearby installations to detect abnormalities in the installation.

Claims (67)

1. A method performed by one or more computers, the method comprising:

obtaining current installation data for a property indicating an installation of a monitoring system in the property;

obtaining aggregate installation data for multiple other properties, the aggregate installation data indicating successful installation events at the multiple other properties;

detecting an aberration associated with the installation of the monitoring system at the property based on the current installation data and the aggregate installation data; and

performing an action related to the installation of the monitoring system at the property based on the aberration associated with the installation of the monitoring system at the property.

2. The method of claim 1 , wherein:

the aggregate installation data identifies an average timing of the past installations of monitoring systems at the multiple other properties; and

detecting the aberration associated with the installation of the monitoring system at the property comprises:

detecting a particular timing of the installation of the monitoring system at the property, and

detecting that the particular timing is longer than the average timing of the past installations of monitoring systems at the multiple other properties.

3. The method of claim 1 , wherein:

the aggregate installation data identifies a combination of types of components installed in past installations of monitoring systems at the multiple other properties

detecting the aberration associated with the installation of the monitoring system at the property comprises:

detecting a particular combination of types of components being installed in the installation of the monitoring system at the property; and

determining that the particular combination of types of components fail to match the combination of types of components installed in a threshold percentage of the past installations.

4. The method of claim 3 , wherein detecting the aberration associated with the installation of the monitoring system at the property comprises detecting that the installation of the monitoring system at the property lacks at least one component installed in the threshold percentage of the past installations.

5. The method of claim 1 , wherein:

the aggregate installation data identifies an order in which components that have been installed in past installations of monitoring systems at the multiple other properties; and

detecting the aberration associated with the installation of the monitoring system at the property comprises:

detecting a particular order in which components that have been installed in the installation of the monitoring system at the property, and

determining that the particular order fails to match the order in which components that have been installed in past installations of monitoring systems at the multiple other properties.

6. The method of claim 1 , wherein performing the action related to the installation of the monitoring system at the property comprises transmitting, to a security provider, a communication identifying the aberration associated with the installation of the monitoring system at the property.

7. The method of claim 1 , wherein performing the action related to the installation of the monitoring system at the property comprises transmitting, to a user associated with the property, a communication identifying the aberration associated with the installation of the monitoring system at the property.

8. A non-transitory computer-readable storage device encoded with computer program instructions that, when executed by one or more computers, cause the one or more computers to perform operations comprising:

obtaining current installation data for a property indicating an installation of a monitoring system in the property;

obtaining aggregate installation data for multiple other properties, the aggregate installation data indicating successful installation events at the multiple other properties;

detecting an aberration associated with the installation of the monitoring system at the property based on the current installation data and the aggregate installation data; and

performing an action related to the installation of the monitoring system at the property based on the aberration associated with the installation of the monitoring system at the property.

9. The non-transitory computer-readable storage device of claim 8 , wherein:

the aggregate installation data identifies an average timing of the past installations of monitoring systems at the multiple other properties; and

detecting the aberration associated with the installation of the monitoring system at the property comprises:

detecting a particular timing of the installation of the monitoring system at the property, and

detecting that the particular timing is longer than the average timing of the past installations of monitoring systems at the multiple other properties.

10. The non-transitory computer-readable storage device of claim 8 , wherein:

the aggregate installation data identifies a combination of types of components installed in past installations of monitoring systems at the multiple other properties

detecting the aberration associated with the installation of the monitoring system at the property comprises:

detecting a particular combination of types of components being installed in the installation of the monitoring system at the property; and

determining that the particular combination of types of components fail to match the combination of types of components installed in a threshold percentage of the past installations.

11. The non-transitory computer-readable storage device of claim 10 , wherein detecting the aberration associated with the installation of the monitoring system at the property comprises detecting that the installation of the monitoring system at the property lacks at least one component installed in the threshold percentage of the past installations.

12. The non-transitory computer-readable storage device of claim 8 , wherein:

the aggregate installation data identifies an order in which components that have been installed in past installations of monitoring systems at the multiple other properties; and

detecting the aberration associated with the installation of the monitoring system at the property comprises:

detecting a particular order in which components that have been installed in the installation of the monitoring system at the property, and

determining that the particular order fails to match the order in which components that have been installed in past installations of monitoring systems at the multiple other properties.

13. A system comprising:

one or more processors; and

one or more non-transitory computer-readable storage devices storing instructions that, when executed by the one or more processors, cause the one or more processors to perform operations comprising:

obtaining current installation data for a property indicating an installation of a monitoring system in the property;

obtaining aggregate installation data for multiple other properties, the aggregate installation data indicating successful installation events at the multiple other properties;

detecting an aberration associated with the installation of the monitoring system at the property based on the current installation data and the aggregate installation data; and

performing an action related to the installation of the monitoring system at the property based on the aberration associated with the installation of the monitoring system at the property.

14. The system of claim 13 , wherein:

the aggregate installation data identifies an average timing of the past installations of monitoring systems at the multiple other properties; and

detecting the aberration associated with the installation of the monitoring system at the property comprises:

detecting a particular timing of the installation of the monitoring system at the property, and

detecting that the particular timing is longer than the average timing of the past installations of monitoring systems at the multiple other properties.

15. The system of claim 13 , wherein:

the aggregate installation data identifies a combination of types of components installed in past installations of monitoring systems at the multiple other properties

detecting the aberration associated with the installation of the monitoring system at the property comprises:

detecting a particular combination of types of components being installed in the installation of the monitoring system at the property; and

determining that the particular combination of types of components fail to match the combination of types of components installed in a threshold percentage of the past installations.

16. The system of claim 15 , wherein detecting the aberration associated with the installation of the monitoring system at the property comprises detecting that the installation of the monitoring system at the property lacks at least one component installed in the threshold percentage of the past installations.

17. The system of claim 13 , wherein:

the aggregate installation data identifies an order in which components that have been installed in past installations of monitoring systems at the multiple other properties; and

detecting the aberration associated with the installation of the monitoring system at the property comprises:

detecting a particular order in which components that have been installed in the installation of the monitoring system at the property, and

determining that the particular order fails to match the order in which components that have been installed in past installations of monitoring systems at the multiple other properties.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 9, 2020
From: TRUNDLE, STEPHEN SCOTT
To: ALARM.COM INCORPORATED
Reel/Frame 052356/0016 →
Continuity (4)
Continuation 16152884 · Oct 5, 2018
Continuation 15706964 · Sep 18, 2017
Continuation 15282842 · Sep 30, 2016
Substitution 62235048 · Sep 30, 2015
Cited By (1)
US 12,567,319