IP Library Granted Patent US 10,936,042
Granted Patent B2
US 10,936,042 · App. 16/793,180 · Granted Mar 2, 2021

Method and apparatus for supplying power to a processor

Inventors: Jing Chen (Epping, AU); Tao Yang (Shanghai, CN); Jesse Xizhi Cui (Shanghai, CN)
Assignee: EMC IP Holding Company, LLC
G06F1/324G06F1/206G06F1/263G06F1/3287G06F1/3293Y02D10/00
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,936,042
App. No.
16/793,180
Granted
Mar 2, 2021
Kind
B2
Abstract

Embodiments of the present disclosure provide a method, an apparatus, an additional power supply, and a mainboard system for supplying power to a processor. The method comprises determining whether an additional power supply is able to provide extra power required by a processor in response to receiving a first signal from a power supply unit that supplies power to the processor. The first signal indicates that the power required by the processor exceeds maximum power that can be provided by the power supply unit. The method further comprises supplying power to the processor by at least the additional power supply in response to determining that the additional power supply is able to provide extra power. The embodiments of the present disclosure can supply the required extra power to the processor from the additional power supply so as to optimize the performance of the processor in an acceleration mode.

Claims (29)

1. A method for supplying power to a processor, comprising:

in response to receiving a first signal, at a microprocessor included within a battery on bus, from a power supply unit that supplies power to a central processing unit (“CPU”), determining, at the microprocessor, whether an additional power supply is able to provide extra power required by the CPU, the first signal defining a CPU acceleration mode indicating that power required by the CPU exceeds maximum power that can be provided by the power supply unit, wherein the power supply unit transmits the first signal as a logic signal to the battery on bus instead of to the CPU during an interval when power demand by the CPU exceeds peak power of the power supply unit; and

in response to determining that the additional power supply is able to provide the extra power, supplying power from the battery on bus to the CPU by at least the additional power supply.

2. The method according to claim 1 , further comprising:

in response to determining that the additional power supply is unable to provide the extra power, transmitting a second signal to the CPU so as to reduce a clock frequency of the CPU.

3. The method according to claim 1 , further comprising:

in response to discontinuation of the first signal from the power supply unit, stopping the supplying power to the CPU by the additional power supply.

4. The method according to claim 1 , further comprising:

in response to the power supply unit powering down, supplying power to the CPU by the additional power supply.

5. An apparatus for supplying power to a central processing unit (“CPU”), comprising:

a battery on bus including a microprocessor, the microprocessor is configured to, in response to receiving a first signal from a power supply unit that supplies power to a CPU, determine whether an additional power supply is able to provide extra power required by the CPU, the first signal defining a CPU acceleration mode indicating that power required by the CPU exceeds maximum power that can be provided by the power supply unit, wherein the battery on bus receives the first signal as a logic signal from the power supply unit during an interval when power demand by the CPU exceeds peak power of the power supply unit, and wherein the battery on bus is configured to, in response to determining that the additional power supply is able to provide the extra power, cause at least the additional power supply to supply power from the battery on bus to the CPU.

6. The apparatus according to claim 5 , wherein the first signal is received via a first reserved pin of the apparatus.

7. The apparatus according to claim 5 , further comprising:

a second signal transmitting module configured to, in response to determining that the additional power supply is unable to provide the extra power, transmit a second signal to the CPU so as to reduce a clock frequency of the CPU.

8. The apparatus according to claim 7 , wherein the second signal is transmitted via a second reserved pin of the apparatus.

9. The apparatus according to claim 5 , wherein in response to discontinuation of the first signal from the power supply unit, the microprocessor being further configured to cause the additional power supply to stop supplying power to the CPU.

10. The apparatus according to claim 5 , wherein in response to the power supply unit powering down, the microprocessor being further configured to cause the additional power supply to supply power to the CPU.

11. An additional power supply for supplying power to a central processing unit (“CPU”), comprising:

an apparatus for controlling power supply to the CPU, the apparatus including a battery on bus including a microprocessor configured to:

in response to receiving a first signal from a power supply unit that supplies power to a CPU, determine whether the additional power supply is able to provide extra power required by the CPU, the first signal defining a CPU acceleration mode indicating that power required by the CPU exceeds maximum power that can be provided by the power supply unit, wherein the battery on bus receives the first signal as a logic signal from the power supply unit during an interval when power demand by the CPU exceeds peak power of the power supply unit; and

in response to determining that the additional power supply is able to provide the extra power, cause at least the additional power supply to supply power from the battery on bus to the CPU.

12. The additional power supply according to claim 11 , wherein the first signal is received via a first reserved pin of the apparatus.

13. The additional power supply according to claim 11 , wherein the apparatus is further configured to:

in response to determining that the additional power supply is unable to provide the extra power, transmit a second signal to the CPU so as to reduce a clock frequency of the CPU.

14. The additional power supply according to claim 13 , wherein the second signal is transmitted via a second reserved pin of the apparatus.

15. The additional power supply according to claim 11 , wherein the apparatus is further configured to:

in response to discontinuation of the first signal from the power supply unit, cause the additional power supply to stop supplying power to the CPU.

16. The additional power supply according to claim 11 , wherein the apparatus is further configured to:

in response to the power supply unit powering down, cause the additional power supply to supply power to the CPU.

Assignments (13)
RELEASE OF SECURITY INTEREST IN PATENTS PREVIOUSLY RECORDED AT REEL/FRAME (052851/0917) Recorded Jun 23, 2022
From: THE BANK OF NEW YORK MELLON TRUST COMPANY, N.A., AS NOTES COLLATERAL AGENT
To: DELL PRODUCTS L.P.; EMC IP HOLDING COMPANY LLC
Reel/Frame 060436/0509 →
RELEASE OF SECURITY INTEREST IN PATENTS PREVIOUSLY RECORDED AT REEL/FRAME (052852/0022) Recorded Jun 23, 2022
From: THE BANK OF NEW YORK MELLON TRUST COMPANY, N.A., AS NOTES COLLATERAL AGENT
To: DELL PRODUCTS L.P.; EMC IP HOLDING COMPANY LLC
Reel/Frame 060436/0582 →
RELEASE OF SECURITY INTEREST IN PATENTS PREVIOUSLY RECORDED AT REEL/FRAME (052851/0081) Recorded Jun 23, 2022
From: THE BANK OF NEW YORK MELLON TRUST COMPANY, N.A., AS NOTES COLLATERAL AGENT
To: DELL PRODUCTS L.P.; EMC IP HOLDING COMPANY LLC
Reel/Frame 060436/0441 →
RELEASE OF SECURITY INTEREST IN PATENTS PREVIOUSLY RECORDED AT REEL/FRAME (053311/0169) Recorded Jun 23, 2022
From: THE BANK OF NEW YORK MELLON TRUST COMPANY, N.A., AS NOTES COLLATERAL AGENT
To: DELL PRODUCTS L.P.; EMC CORPORATION; EMC IP HOLDING COMPANY LLC
Reel/Frame 060438/0742 →
RELEASE OF SECURITY INTEREST IN PATENTS PREVIOUSLY RECORDED AT REEL/FRAME (053546/0001) Recorded Jun 23, 2022
From: THE BANK OF NEW YORK MELLON TRUST COMPANY, N.A., AS NOTES COLLATERAL AGENT
To: DELL MARKETING L.P. (ON BEHALF OF ITSELF AND AS SUCCESSOR-IN-INTEREST TO CREDANT TECHNOLOGIES, INC.); DELL INTERNATIONAL L.L.C.; DELL PRODUCTS L.P.; DELL USA L.P.; EMC CORPORATION; DELL MARKETING CORPORATION (SUCCESSOR-IN-INTEREST TO FORCE10 NETWORKS, INC. AND WYSE TECHNOLOGY L.L.C.); EMC IP HOLDING COMPANY LLC
Reel/Frame 071642/0001 →
RELEASE OF SECURITY INTEREST AT REEL 052771 FRAME 0906 Recorded Nov 2, 2021
From: CREDIT SUISSE AG, CAYMAN ISLANDS BRANCH
To: DELL PRODUCTS L.P.; EMC IP HOLDING COMPANY LLC
Reel/Frame 058001/0298 →
SECURITY INTEREST Recorded Jun 5, 2020
From: DELL PRODUCTS L.P.; EMC IP HOLDING COMPANY LLC
To: THE BANK OF NEW YORK MELLON TRUST COMPANY, N.A., AS COLLATERAL AGENT
Reel/Frame 052852/0022 →
SECURITY INTEREST Recorded Jun 5, 2020
From: DELL PRODUCTS L.P.; EMC IP HOLDING COMPANY LLC; THE BANK OF NEW YORK MELLON TRUST COMPANY, N.A., AS COLLATERAL AGENT
To: THE BANK OF NEW YORK MELLON TRUST COMPANY, N.A., AS COLLATERAL AGENT
Reel/Frame 052851/0081 →
SECURITY INTEREST Recorded Jun 5, 2020
From: DELL PRODUCTS L.P.; EMC IP HOLDING COMPANY LLC
To: THE BANK OF NEW YORK MELLON TRUST COMPANY, N.A., AS COLLATERAL AGENT
Reel/Frame 052851/0917 →
SECURITY INTEREST Recorded Jun 5, 2020
From: DELL PRODUCTS L.P.; EMC CORPORATION; EMC IP HOLDING COMPANY LLC
To: THE BANK OF NEW YORK MELLON TRUST COMPANY, N.A., AS COLLATERAL AGENT
Reel/Frame 053311/0169 →
SECURITY AGREEMENT Recorded May 28, 2020
From: DELL PRODUCTS L.P.; EMC IP HOLDING COMPANY LLC
To: CREDIT SUISSE AG, CAYMAN ISLANDS BRANCH
Reel/Frame 052771/0906 →
SECURITY AGREEMENT Recorded Apr 22, 2020
From: CREDANT TECHNOLOGIES INC.; DELL INTERNATIONAL L.L.C.; DELL MARKETING L.P.; DELL PRODUCTS L.P.; DELL USA L.P.; EMC CORPORATION; FORCE10 NETWORKS, INC.; WYSE TECHNOLOGY L.L.C.; EMC IP HOLDING COMPANY LLC
To: THE BANK OF NEW YORK MELLON TRUST COMPANY, N.A.
Reel/Frame 053546/0001 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 18, 2020
From: CHEN, JING; YANG, TAO; CUI, JESSE XIZHI
To: EMC IP HOLDING COMPANY LLC
Reel/Frame 051844/0405 →
Priority Claims (1)
CN 201511001586.4 · Dec 28, 2015 · national
Continuity (2)
Continuation 15382979 · Dec 19, 2016
Related Publication 20200183475A1 · Jun 11, 2020