IP Library Granted Patent US 11,299,261
Granted Patent B2
US 11,299,261 · App. 16/799,896 · Granted Apr 12, 2022

Landing gear system operation

Inventors: Sean Kerr (Bristol, GB); David Marles (Bristol, GB)
Assignee: Airbus Operations Limited
B64C25/30B64C13/16B64C25/28B64D45/04
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,299,261
App. No.
16/799,896
Granted
Apr 12, 2022
Kind
B2
Abstract

An aircraft landing gear control system 1000 configured to be operably connected to one or more landing gear systems 30, 40 of an aircraft. The aircraft landing gear control system includes a controller 20 configured to: send at least one output for initiating operation of the one or more landing gear systems; determine whether at least one landing gear system of the one or more landing gear systems has failed to operate correctly in response to the at least one output; and determine at least one remedial action to be taken, when the controller determines that the at least one landing gear system has failed to operate correctly.

Claims (63)

1. An aircraft landing gear control system configured to be operably connected to one or more landing gear systems of an aircraft, the aircraft landing gear control system comprising a controller that is configured to:

send at least one output for initiating operation of the one or more landing gear systems;

determine whether at least one landing gear system of the one or more landing gear systems has failed to operate correctly in response to the at least one output; and

determine at least one remedial action to be taken when the controller determines that the at least one landing gear system has failed to operate correctly;

determine one or more reasons for the at least one landing gear system to have failed to operate correctly; and

determine the at least one remedial action to be taken, on the basis of the one or more reasons.

2. The aircraft landing gear control system according to claim 1 , wherein the controller is configured to:

determine the one or more reasons by a process comprising interrogating avionics of the aircraft.

3. The aircraft landing gear control system according to claim 1 , wherein the controller is configured to:

determine the one or more reasons by a process comprising interrogating one or more sensors of the aircraft.

4. The aircraft landing gear control system according to claim 1 , wherein the controller is configured to:

cause identification of the at least one remedial action to be output at a cockpit of the aircraft.

5. The aircraft landing gear control system according to claim 1 , wherein the controller is configured to:

cause initiation of the at least one remedial action.

6. The aircraft landing gear control system according to claim 1 , wherein the controller is configured to:

cause initiation of the at least one remedial action automatically, on the basis of the determination of the at least one remedial action to be taken.

7. The aircraft landing gear control system according to claim 1 , and further comprising:

a user interface operable by a user to manually input a request to perform the at least one remedial action;

wherein the controller is communicatively coupled to the user interface and is configured to:

receive, from the user interface, a signal indicative of user-operation of the user interface to input the request to perform the at least one remedial action; and

cause initiation of the at least remedial action, on the basis of the signal.

8. The aircraft landing gear control system according to claim 1 , wherein the at least one remedial action to be taken comprises one or more of:

determining a flight plan;

executing an aircraft manoeuvre;

reattempting operation of the at least one landing gear system; and

taking one or more actions to counteract asymmetry or pitching of the aircraft.

9. The aircraft landing gear control system of claim 1 , wherein the controller determines the one or more reasons by selecting the one or more reasons from a plurality of reasons stored in memory accessible by the controller, and

wherein the controller determines the one or more remedial actions by selecting the one or more remedial actions from a plurality of remedial actions stored in the memory accessible by the controller.

10. The aircraft landing gear control system of claim 9 , wherein, the plurality of reasons stored in the memory include a plurality of: (i) an unexpected position of a landing gear, a landing gear bay door lock, a lock and/or an actuator, (ii) a fluid pressure and/or fluid flow rate of hydraulics in the one or more landing gear systems being above or below a predetermined fluid value; (iii) electrical current drawn by the one or more landing gear systems exceeding a predetermined current value; and (iv) a failure in a sensor for the one or more landing gear systems.

11. The aircraft landing gear control system of claim 9 , wherein the plurality of remedial actions includes a plurality of: (i) recycling the one or more landing gear systems; (ii) using alterative avionics and/or mechanical systems of the one or more landing gear systems; (iii) deploying the one or more landing gear systems using gravity alone; (iv) executing a high-G aircraft manoeuver; (v) changing a flight plan of the aircraft, and (vi) deploying the one or more landing gear systems to achieve a symmetry of the landing gear systems.

12. An aircraft landing gear control system configured to be operably connected to one or more landing gear systems of an aircraft, the aircraft landing gear control system comprising a controller that is configured to:

send at least one output for initiating operation of the one or more landing gear systems;

determine whether at least one landing gear system of the one or more landing gear systems has failed to operate correctly in response to the at least one output;

determine at least one remedial action to be taken when the controller determines that the at least one landing gear system has failed to operate correctly;

send the at least one output for initiating operation of the one or more landing gear systems according to a first procedure; and

determine at least one remedial action to be taken that comprises sending at least one output for initiating operation of the at least one landing gear system according to a second procedure different to the first procedure.

13. The aircraft landing gear control system according to claim 12 , wherein the second procedure comprises one or more of:

operating at least a portion of the at least one landing gear system under the influence of gravity alone;

operating the at least one landing gear system using avionics that are different to avionics used to operate the at least one landing gear system according to the first procedure; and

actuating the at least one landing gear system using mechanics that are different to mechanics used to actuate the at least one landing gear system according to the first procedure.

14. A method of controlling one or more landing gear systems of an aircraft using a controller of the aircraft, the method comprising:

the controller issuing at least one output for causing operation of the one or more landing gear systems;

the controller determining whether at least one of the one or more landing gear systems has failed to operate correctly in response to the at least one output; and

the controller determining at least one remedial action to be taken, when the controller determines that the at least one landing gear system has failed to operate correctly in response to the at least one output;

the controller determining one or more reasons for the at least one landing gear system to have failed to have operated correctly; and

the controller determining the at least one remedial action to be taken on the basis of the one or more reasons.

15. The method according to claim 14 , further comprising:

the controller receiving signals from one or more sensors of the aircraft; and

the controller determining that the at least one landing gear system has failed to operate correctly on the basis of the one or more signals.

16. The method according to claim 14 , further comprising:

the controller determining a period of time that has elapsed, since the controller issued the at least one output, without the controller receiving an indication that the at least one landing gear system has operated correctly; and

the controller determining that the at least one landing gear system has failed to operate correctly on the basis of the period of time determined.

17. The method according to claim 14 , further comprising:

the controller determining that the one or more landing gear systems are to be operated on the basis of one or more inputs received at the controller from one or more sensors.

18. The method according to claim 14 , further comprising:

the controller receiving from a user interface an input indicative of user-operation of the user interface to input a landing gear system operation request; and

the controller determining that the one or more landing gear systems are to be operated on the basis of the input.

19. The method according to claim 14 , wherein the operation of the one or more landing gear systems comprises extension of the one or more landing gears or retraction of the one or more landing gears.

20. A controller for an aircraft landing gear control system, wherein the controller is configured to:

perform one or more actions for initiating actuation of a landing gear system; and

then determine one or more processes to be initiated, when the controller determines that the landing gear system has failed to actuate correctly as a result of the one or more actions having been performed;

determine one or more reasons for the at least one landing gear system to have failed to actuate correctly; and

determine the one or more processes to be initiated on the basis of the one or more reasons.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 25, 2020
From: KERR, SEAN; MARLES, DAVID
To: AIRBUS OPERATIONS LIMITED
Reel/Frame 051910/0627 →
Priority Claims (1)
GB 1902739 · Feb 28, 2019 · national
Continuity (1)
Related Publication 20200277044A1 · Sep 3, 2020
Cited By (2)
US 12,280,866 US 12,654,847