IP Library Granted Patent US 11,585,424
Granted Patent B2
US 11,585,424 · App. 16/804,290 · Granted Feb 21, 2023

Modular pinion shaft for reciprocating pumps

Inventors: Austin Chunn (Fort Worth, TX); Wesley Freed (Aledo, TX); Mark C. Dille (Magnolia, TX)
Assignee: FORUM US, INC.
F16H57/0025C21D9/08C21D9/32F04D29/043F04D29/044F04D29/053F04D29/054F16C3/023F16D1/02F16D1/033F16D1/06F16H57/0018
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,585,424
App. No.
16/804,290
Granted
Feb 21, 2023
Kind
B2
Abstract

A modular pinion shaft that includes a tubular member having a first end and a second end, a first pinion gear member secured to the first end by a plurality of fasteners, and a second pinion gear member secured to the first end by a plurality of fasteners. Gear teeth of each of the pinion gear members are aligned by one or more indexing members disposed between the tubular member and each pinion gear member.

Claims (64)

1. A method of manufacturing a reciprocating pump, the method comprising:

coupling a tubular and a first pinion gear comprising first gear teeth together using a first indexing member such that one end of the first indexing member is disposed in a bore formed in the first pinion gear and an opposite end of the first indexing member is disposed in a bore formed in a first end of the tubular;

coupling the tubular and a second pinion gear comprising second gear teeth together using a second indexing member such that an end of the second indexing member is disposed in a bore formed in the second pinion gear and an opposite end of the second indexing member is disposed in a bore formed in a second end the tubular;

mating the first gear teeth of the first pinion gear with a first set of gear teeth of a first bull gear disposed in a housing; and

mating the second gear teeth of the second pinion gear with a second set of gear teeth of a second bull gear disposed in the housing, wherein the first bull gear and the second bull gear are coupled to a crankshaft configured to operate the reciprocating pump.

2. The method of claim 1 , further comprising:

heat treating the tubular; and

heat treating the first and second pinion gears separately from the heat treating of the tubular.

3. The method of claim 1 , wherein the tubular comprises a first material and the first and second pinion gears each comprise a second material.

4. The method of claim 3 , wherein:

the first material is different than the second material;

the first pinion gear comprises a first bearing surface positioned axially inward of the first gear teeth and toward the tubular; and

the second pinion gear comprises a second bearing surface positioned axially inward of the second gear teeth and toward the tubular.

5. The method of claim 1 , wherein the first and second pinion gears each comprise a first material and the tubular comprises a second material different than the first material.

6. The method of claim 5 , further comprising:

heat treating the tubular; and

heat treating the first and second pinion gears separately from the heat treating of the tubular.

7. The method of claim 1 , further comprising:

receiving a portion of the first pinion gear in a first recessed portion formed in the first end of the tubular; and

receiving a portion of the second pinion gear in a second recessed portion formed in the second end of the tubular.

8. The method of claim 7 , wherein:

the first recessed portion comprises a first shoulder formed in the first end of the tubular;

the first pinion gear comprises a face that extends into the first recessed portion of the tubular and contacts the first shoulder;

the second recessed portion comprises a second shoulder formed in the second end of the tubular;

the second pinion gear includes a face that extends into the second recessed portion of the tubular and contacts the second shoulder; and

the tubular includes a hollow center and an inside diameter, and the first shoulder and the second shoulder are each disposed at the inside diameter.

9. The method of claim 8 , wherein:

the bore formed in the first pinion gear is a through-hole extending from an axial inner surface to an axial outer surface of the first pinion gear, and at least a portion of the end of each of the one or more first indexing members is visible in the respective through-hole formed in the first pinion gear; and

the bore formed in the second pinion gear is a through-hole extending from an axial inner surface to an axial outer surface of the second pinion gear, and at least a portion of the end of each of the one or more second indexing members is visible in the respective through-hole formed in the second pinion gear.

10. The method of claim 9 , wherein:

the face of the first pinion gear extends past the axial inner surface of the first pinion gear and toward the tubular, and the axial inner surface of the first pinion gear interfaces with the first end of the tubular; and

the face of the second pinion gear extends past the axial inner surface of the second pinion gear and toward the tubular, and the axial inner surface of the second pinion gear interfaces with the second end of the tubular.

11. A method of manufacturing a pinion shaft, the method comprising:

coupling a tubular and a first pinion gear comprising first gear teeth using one or more first indexing members such that an end of each of the one or more first indexing members is disposed in a bore formed in the first pinion gear;

coupling the tubular and a second pinion gear comprising second gear teeth using one or more second indexing members such that an end of each of the one or more second indexing members is disposed in a bore formed in the second pinion gear;

securing the first pinion gear to a first end of the tubular by a first plurality of fasteners; and

securing the second pinion gear to a second end of the tubular by a second plurality of fasteners.

12. The method of claim 11 , further comprising:

heat treating the tubular; and

heat treating the first and second pinion gears separately from the heat treating of the tubular.

13. The method of claim 11 , wherein the tubular comprises a first material and the first and second pinion gears each comprise a second material.

14. The method of claim 13 , wherein:

the first material is different than the second material;

the first pinion gear comprises a first bearing surface positioned axially inward of the first gear teeth and toward the tubular; and

the second pinion gear comprises a second bearing surface positioned axially inward of the second gear teeth and toward the tubular.

15. The method of claim 11 , wherein the first and second pinion gears each comprise a first material and the tubular comprises a second material different than the first material.

16. The method of claim 15 , further comprising:

heat treating the tubular; and

heat treating the first and second pinion gears separately from the heat treating of the tubular.

17. The method of claim 11 , further comprising:

receiving a portion of the first pinion gear in a first recessed portion formed in the first end of the tubular; and

receiving a portion of the second pinion gear in a second recessed portion formed in the second end of the tubular.

18. The method of claim 17 , wherein:

the first recessed portion comprises a first shoulder formed in the first end of the tubular;

the first pinion gear comprises a face that extends into the first recessed portion of the tubular and contacts the first shoulder;

the second recessed portion comprises a second shoulder formed in the second end of the tubular;

the second pinion gear includes a face that extends into the second recessed portion of the tubular and contacts the second shoulder; and

the tubular includes a hollow center and an inside diameter, and the first shoulder and the second shoulder are each disposed at the inside diameter.

19. The method of claim 18 , wherein:

the bore formed in the first pinion gear is a through-hole extending from an axial inner surface to an axial outer surface of the first pinion gear, and at least a portion of the end of each of the one or more first indexing members is visible in the respective through-hole formed in the first pinion gear; and

the bore formed in the second pinion gear is a through-hole extending from an axial inner surface to an axial outer surface of the second pinion gear, and at least a portion of the end of each of the one or more second indexing members is visible in the respective through-hole formed in the second pinion gear.

20. The method of claim 19 , wherein:

the face of the first pinion gear extends past the axial inner surface of the first pinion gear and toward the tubular, and the axial inner surface of the first pinion gear interfaces with the first end of the tubular; and

the face of the second pinion gear extends past the axial inner surface of the second pinion gear and toward the tubular, and the axial inner surface of the second pinion gear interfaces with the second end of the tubular.

Assignments (7)
RELEASE OF SECOND LIEN SECURITY INTEREST IN PATENTS RECORDED AT REEL 066565/FRAME 0968 Recorded Nov 12, 2024
From: GLAS USA LLC
To: FORUM ENERGY TECHNOLOGIES, INC.; FORUM US, INC.; GLOBAL TUBING, LLC; VARIPERM ENERGY SERVICES INC.
Reel/Frame 069338/0131 →
RELEASE OF PATENT SECURITY AGREEMENT RECORDED AT REEL 053399/FRAME 0930 Recorded Nov 11, 2024
From: U.S. BANK NATIONAL ASSOCIATION
To: FORUM ENERGY TECHNOLOGIES, INC.; FORUM US, INC.; GLOBAL TUBING, LLC
Reel/Frame 069318/0330 →
ASSIGNMENT AND ASSUMPTION OF SECOND LIEN TERM LOAN INTELLECTUAL PROPERTY SECURITY AGREEMENTS Recorded Sep 27, 2024
From: VARIPERM ENERGY SERVICES PARTNERSHIP, AS RESIGNING COLLATERAL AGENT AND ASSIGNOR
To: GLAS USA LLC, AS SUCESSOR AGENT AND ASSIGNEE
Reel/Frame 069067/0317 →
SECURITY INTEREST Recorded Jan 5, 2024
From: FORUM ENERGY TECHNOLOGIES, INC.; FORUM US, INC.; GLOBAL TUBING, LLC; VARIPERM ENERGY SERVICES INC.
To: VARIPERM ENERGY SERVICES PARTNERSHIP
Reel/Frame 066565/0968 →
SECURITY INTEREST Recorded Nov 30, 2021
From: FORUM US, INC.; GLOBAL HEAT TRANSFER ULC
To: WELLS FARGO BANK
Reel/Frame 058290/0868 →
SECURITY INTEREST Recorded Aug 4, 2020
From: FORUM ENERGY TECHNOLOGIES, INC.; FORUM US, INC.; GLOBAL TUBING, LLC
To: US BANK, NATIONAL ASSOCIATION
Reel/Frame 053399/0930 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 28, 2020
From: CHUNN, AUSTIN; FREED, WESLEY; DILLE, MARK C.
To: FORUM US, INC.
Reel/Frame 051961/0052 →
Continuity (2)
Division 15407888 · Jan 17, 2017
Related Publication 20200200255A1 · Jun 25, 2020