IP Library Granted Patent US 11,577,763
Granted Patent B2
US 11,577,763 · App. 16/811,244 · Granted Feb 14, 2023

Method and controller for determining the relationship between a track-circuit transmitted current signal and a railway vehicle location on a railway track

Inventors: Nenad Mijatovic (Melbourne, FL); Jeffrey Fries (Grain Valley, MO); Jesse Herlocker (Grain Valley, MO)
Assignee: ALSTOM TRANSPORT TECHNOLOGIES
B61L1/185B61L25/025B61L25/026G06K9/00543G08G1/123B61K9/08
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,577,763
App. No.
16/811,244
Granted
Feb 14, 2023
Kind
B2
Abstract

Disclosed is a method for determining the relationship between a track-circuit current signal and a railway vehicle location, including: sending, by a track circuit, current signal across a railway track block; measuring the current signal for different railway vehicles running successively on the railway track block; aligning the measured current signals and calculating a reference curve as the average value of all the aligned curves by using a Dynamic Time Warping algorithm, this reference curve representing the relationship between the track-circuit current signal and the railway vehicle location on the railway track block.

Claims (33)

1. Method for determining the relationship between a track-circuit current signal and a railway vehicle location, comprising

sending, by a track circuit, current signal across a railway track block,

measuring the current signal for different railway vehicles running successively on the railway track block;

aligning said measured current signals and calculating a reference curve (R) as the average value of all the aligned curves by using a Dynamic Time Warping algorithm, this reference curve (R) representing the relationship between the measured track-circuit current signal and the railway vehicle location on said railway track block.

2. The method of claim 1 , wherein the inputs of the Dynamic Time Warping algorithm are a plurality of current signals measured for several railway vehicle move sequences across the railway track block and a maximum number of algorithm iterations (N), wherein each current signal measured for an individual (i th ) railway vehicle move sequence (I i ) contains transmitted current peak values (I (i,j) ) of a plurality of samples of said measured track-circuit current signal.

3. The method of claim 2 , wherein the reference curve (R) contains a plurality of elements (r 1 , r 2 , . . . , r p ).

4. The method of claim 3 , comprising the steps of:

a) initializing ( 2 ) the elements of the reference curve (R) by randomly selecting one current signal measured for an individual railway vehicle move sequence;

b) for each current signal measured for an individual railway vehicle move sequence performing ( 5 ) the Dynamic Time Warping algorithm between the current signal and the reference curve;

c) for each element (p th ) in the reference curve, associating ( 6 ) an appropriate set of elements from the current signal measured for an individual railway vehicle move sequence with said element (p th ) in the reference curve;

d) updating ( 8 ) each element (p th ) of the reference curve by calculating the average of all associated elements found in step c);

e) repeating steps a) to d) by initializing ( 2 ) the elements of the reference curve (R) with the elements of the updated reference curve calculated at step d), up to the maximum number of algorithm iterations (N).

5. The method of claim 4 , further comprising the steps of determining a confidence interval and/or a safety margin using a bootstrap percentiles method.

6. Controller for determining the relationship between a track-circuit transmitted current signal and a railway vehicle location on a railway track, the controller being adapted to be connected to a track circuit arranged to send a current signal across a railway track block on which different railway vehicles are running successively, the controller being arranged to perform the method according to claim 4 .

7. The method of claim 3 , further comprising the steps of determining a confidence interval and/or a safety margin using a bootstrap percentiles method.

8. Controller for determining the relationship between a track-circuit transmitted current signal and a railway vehicle location on a railway track, the controller being adapted to be connected to a track circuit arranged to send a current signal across a railway track block on which different railway vehicles are running successively, the controller being arranged to perform the method according to claim 3 .

9. The method of claim 2 , further comprising the steps of determining a confidence interval and/or a safety margin using a bootstrap percentiles method.

10. Controller for determining the relationship between a track-circuit transmitted current signal and a railway vehicle location on a railway track, the controller being adapted to be connected to a track circuit arranged to send a current signal across a railway track block on which different railway vehicles are running successively, the controller being arranged to perform the method according to claim 2 .

11. The method of claim 1 , further comprising the steps of determining a confidence interval and/or a safety margin using a bootstrap percentiles method.

12. The method of claim 11 , comprising the steps of:

collecting ( 100 ) transmitted current values measured for N railway vehicle moves, thus obtaining a railway vehicle move data set;

creating ( 102 ) a plurality of bootstrap railway vehicle move datasets ( 102 ′, 102 ″, 102 ′″, . . . , 102 B) of size N by resampling the original railway vehicle move data set with a replacement set, wherein resampling is performed by random selecting railway vehicle moves from the original set with probability of 1/N;

calculating ( 104 ) the reference curve ( 104 ′, 104 ″, 104 ′″, 104 B ) for each bootstrap dataset.

13. The method of claim 12 , comprising the step of:

determining, on the basis of the reference curves ( 104 ′, 104 ″, 104 ′″, 104 B) obtained for each bootstrap dataset, using a predetermined percentile interval, lower Ri(Tx) and upper Ru(Tx) confidence interval values for predefined measured track-circuit current values Tx.

14. The method of claim 13 , comprising the step of:

setting ( 106 ) a safety margin in function of the mean value of the lower (Ri(Tx)) confidence interval values.

15. Controller for determining the relationship between a track-circuit transmitted current signal and a railway vehicle location on a railway track, the controller being adapted to be connected to a track circuit arranged to send a current signal across a railway track block on which different railway vehicles are running successively, the controller being arranged to perform the method according to claim 14 .

16. Controller for determining the relationship between a track-circuit transmitted current signal and a railway vehicle location on a railway track, the controller being adapted to be connected to a track circuit arranged to send a current signal across a railway track block on which different railway vehicles are running successively, the controller being arranged to perform the method according to claim 13 .

17. Controller for determining the relationship between a track-circuit transmitted current signal and a railway vehicle location on a railway track, the controller being adapted to be connected to a track circuit arranged to send a current signal across a railway track block on which different railway vehicles are running successively, the controller being arranged to perform the method according to claim 12 .

18. Controller for determining the relationship between a track-circuit transmitted current signal and a railway vehicle location on a railway track, the controller being adapted to be connected to a track circuit arranged to send a current signal across a railway track block on which different railway vehicles are running successively, the controller being arranged to perform the method according to claim 11 .

19. Controller for determining the relationship between a track-circuit transmitted current signal and a railway vehicle location on a railway track, the controller being adapted to be connected to a track circuit arranged to send a current signal across a railway track block on which different railway vehicles are running successively, the controller being arranged to perform the method according to claim 1 .

20. Track circuit comprising a controller according to claim 19 .

Assignments (4)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 8, 2025
From: ALSTOM HOLDINGS SA
To: ALSTOM SIGNALING INC.
Reel/Frame 069848/0607 →
CHANGE OF NAME Recorded Jan 8, 2025
From: ALSTOM SIGNALING INC.
To: KB SIGNALING INC.
Reel/Frame 069848/0902 →
DISSOLUTION AND TRANSFER OF ASSETS Recorded Sep 3, 2024
From: ALSTOM TRANSPORT TECHNOLOGIES
To: ALSTOM HOLDINGS
Reel/Frame 068823/0899 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 6, 2020
From: MIJATOVIC, NENAD; FRIES, JEFFREY; HERLOCKER, JESSE
To: ALSTOM TRANSPORT TECHNOLOGIES
Reel/Frame 052590/0399 →
Continuity (1)
Related Publication 20210276601A1 · Sep 9, 2021
Cited By (1)
US 12,403,943