IP Library Granted Patent US 11,456,475
Granted Patent B2
US 11,456,475 · App. 16/812,630 · Granted Sep 27, 2022

Method for manufacturing a membrane assembly for a fuel cell with catalyst-free edge to the frame; membrane assembly and fuel cell with membrane assembly

Inventors: Owen Thomas (Vancouver, CA); Keping Wang (New Westminster, CA); Carmen Chuy (Burnaby, CA); Yunsong Yang (Surrey, CA)
Assignees: cellcentric GmbH & Co. KG; Ford Motor Company
H01M8/1004H01M4/8657H01M4/8814H01M4/8896
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,456,475
App. No.
16/812,630
Granted
Sep 27, 2022
Kind
B2
Abstract

A method for manufacturing a membrane assembly for a fuel cell, which membrane assembly includes a membrane with a catalyst layer and a frame arranged on the same side of the membrane and a gap between the catalyst layer and the frame. To allow an easy and cost-effective way for manufacturing such a membrane assembly, the manufacturing method may include the following steps: positioning a first decal layer, which is made of the same material as the first catalyst layer, on the first side of the membrane in a way that the first decal layer overlaps the frame, positioning a second decal layer, which is made of the same material as the second catalyst layer, on the second side of the membrane, pressing the first decal layer and the second decal layer against each other with the membrane and the frame positioned in-between.

Claims (13)

1. A method for manufacturing a membrane assembly for a fuel cell, which membrane assembly comprises

a membrane with a first side and a second side,

a first catalyst layer arranged on the first side of the membrane and a second catalyst layer arranged on the second side of the membrane,

a frame arranged at least on the first side of the membrane, wherein the frame encircles the first catalyst layer in a plane of the main extension direction of the first catalyst layer, and

a gap between the first catalyst layer and the frame, the method comprising the following steps:

positioning a first decal layer, which is made of the same material as the first catalyst layer, on the first side of the membrane relative to the frame, which is positioned on the first side of the membrane, in a way that the first decal layer overlaps the frame,

positioning a second decal layer, which is made of the same material as the second catalyst layer, on the second side of the membrane,

pressing the first decal layer and the second decal layer towards each other with the membrane and the frame positioned in-between, wherein with increasing distance from the frame, the pressure applied while pressing increases, resulting in the first decal layer not adhering to the first side of the membrane next to the frame.

2. The method according to claim 1 , wherein the positioning of the second decal layer is carried out in a way that the second decal layer overlaps a projection of the frame into a plane of the second decal layer.

3. The method according to claim 1 , wherein the pressing is carried out with two pressing surfaces both overlapping the frame.

4. The method according claim 1 , wherein prior to the positioning of the first decal layer and the second decal layer the frame is arranged on the membrane by a separate pressing procedure.

5. The method according to claim 1 , wherein prior to the positioning of the first decal layer and the second decal layer the frame is positioned on the membrane to be fixed to the membrane in the following step of pressing the first decal layer and the second decal layer against each other.

6. The method according to claim 1 , wherein a thickness of the frame is varied for adjusting the width of the gap.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 14, 2021
From: DAIMLER AG
To: CELLCENTRIC GMBH & CO. KG
Reel/Frame 058386/0706 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 22, 2021
From: AUTOMOTIVE FUEL CELL COOPERATION CORP.
To: DAIMLER AG; FORD MOTOR COMPANY
Reel/Frame 054995/0722 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 21, 2021
From: THOMAS, OWEN; WANG, KEPING; CHUY, CARMEN; YANG, YUNSONG
To: AUTOMOTIVE FUEL CELL COOPERATION CORP.
Reel/Frame 054980/0990 →
Continuity (1)
Related Publication 20210280884A1 · Sep 9, 2021