IP Library Granted Patent US 11,728,640
Granted Patent B2
US 11,728,640 · App. 16/838,766 · Granted Aug 15, 2023

Secured fault detection in a power substation

Inventors: Tao Cui (Raleigh, NC); Reynaldo Nuqui (Cary, NC); Dmitry Ishchenko (Cary, NC); Zhenyuan Wang (Morrisville, NC)
Assignee: HITACHI ENERGY SWITZERLAND AG
H02H7/28H02H7/261G01R31/08H02H1/04H02H1/043H02H1/046
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,728,640
App. No.
16/838,766
Granted
Aug 15, 2023
Kind
B2
Abstract

Systems and methods for fault detection and protection in electric power systems that evaluates electromagnetic transients caused by faults. A fault can be detected using sampled data from a first monitored point in the power system. Detection of fault transients and associated characteristics, including transient direction, can also be extracted through evaluation of sample data from other monitored points in the power system. A monitoring device can evaluate whether to trip a switching device in response to the detection of the fault and based on confirmation of an indication of detection of fault transients at the other monitored points of the power system. The determination of whether to trip or activate the switching device can also be based on other factors, including the timing of receipt of an indication of the detection of the fault transients and/or an evaluation of the characteristics of the detected transients.

Claims (34)

1. A method comprising:

detecting, by a first monitoring device, a fault in a power system,;

detecting, by one or more other monitoring devices, one or more fault transients;

receiving, by the first monitoring device, an indication of the detection, by the one or more other monitoring devices, of the one or more fault transients

determining to trip a switching device of a power system in response to the detected fault and the detected one or more fault transients, wherein the step of determining to trip the switching device includes determining whether the first monitoring device received an indication of the detection of the one or more fault transients within a predetermined time period;

determining, by the first monitoring device and using first sampled data of a first monitoring point of the power system, a first fault direction of a first fault transient; and

determining, by the one or more other monitoring devices and using sampled data of at least a second monitoring point of the power system, a second fault direction of at least one of the one or more fault transients,

wherein the step of determining to trip the switching device includes determining whether the first fault direction is consistent with the second fault direction,

wherein determining the first fault direction comprises:

calculating an instantaneous energy direction for the first fault transient by obtaining a decoupled mode voltage and a decoupled mode current for each of several tracked fault component voltages and currents;

calculating instantaneous active power and instantaneous reactive power for each of the decoupled mode voltages and decoupled mode currents;

accumulating the instantaneous active powers and instantaneous reactive powers to form instantaneous active energies and reactive energies; and

evaluating the signs of the instantaneous active energies and reactive energies to determine the fault direction for the electromagnetic transient.

2. A method comprising: detecting, by a first monitoring device, a fault in a power system, detecting the fault comprises detecting a presence of the fault using phasor calculations; detecting one or more fault transients, the one or more fault transients being generated by electromagnetic fault transients propagating in a substation of the power system; confirming, by the first monitoring device, based on detection of the fault and the detection of the one or more fault generated electromagnetic fault transients in the substation, the presence of the fault in the power system; and determining, by the first monitoring device, to trip a switching device of a power system in response to the confirmed presence of the detected fault; and wherein the first sampled data comprises at least one of a first sampled current data and a first sampled voltage data, and wherein the step of detecting one or more fault transients comprises detecting, by a second monitoring device, one or more fault transients using second sampled data, the second sampled data comprising at least one of a second sampled current data and a second sampled voltage data.

3. The method of claim 2 , wherein the step of detecting the one or more fault transients comprises:

high-pass filtering the second sampled data; and

determining whether the filtered second sampled data exceeds a pre-determined amplitude.

4. The method of claim 2 , wherein the step of detecting the one or more fault transients is performed by one or more other monitoring devices.

5. The method of claim 4 , further including the step of receiving, by the first monitoring device, an indication of the detection, by the one or more other monitoring devices, of the one or more fault transients.

6. The method of claim 5 , wherein the step of determining to trip the switching device includes determining whether the first monitoring device received an indication of the detection of the one or more fault transients within a predetermined time period.

7. The method of claim 6 , further including the steps of:

determining, by the first monitoring device and using first sampled data of a first monitoring point of the power system, a first fault direction of a first fault transient; and

determining, by the one or more other monitoring devices and using sampled data of at least a second monitoring point of the power system, a second fault direction of at least one of the one or more fault transients,

wherein the step of determining to trip the switching device includes determining whether the first fault direction is consistent with the second fault direction.

8. The method of claim 7 , wherein determining the first fault direction comprises:

calculating an instantaneous energy direction for the first fault transient by obtaining a decoupled mode voltage and a decoupled mode current for each of several tracked fault component voltages and currents;

calculating instantaneous active power and instantaneous reactive power for each of the decoupled mode voltages and decoupled mode currents;

accumulating the instantaneous active powers and instantaneous reactive powers to form instantaneous active energies and reactive energies; and

evaluating the signs of the instantaneous active energies and reactive energies to determine the fault direction for the electromagnetic transient.

9. The method of claim 2 , wherein the step of detecting the fault includes receiving, by a first monitoring device, first sampled data for a first monitored point in the power system and detecting the fault using the first sampled data, and wherein the step of detecting the one or more fault transients includes receiving second sampled data for a second monitored point and determining that the second sampled data indicates a fault transient at the second monitored point.

10. The method of claim 9 , further including the steps:

determining a first direction for a first fault transient at the first monitored point; and

determining a second direction for the fault transient at the second monitored point,

wherein the step of determining to trip the switching device includes determining whether the first fault direction is consistent with the second fault direction.

Assignments (4)
MERGER Recorded Nov 13, 2023
From: HITACHI ENERGY SWITZERLAND AG
To: HITACHI ENERGY LTD
Reel/Frame 065548/0905 →
CHANGE OF NAME Recorded Dec 31, 2021
From: ABB POWER GRIDS SWITZERLAND AG
To: HITACHI ENERGY SWITZERLAND AG
Reel/Frame 058601/0692 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 15, 2021
From: ABB INC.
To: ABB POWER GRIDS SWITZERLAND AG
Reel/Frame 055594/0148 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 2, 2020
From: CUI, TAO; NUQUI, REYNALDO; ISHCHENKO, DMITRY; WANG, ZHENYUAN
To: ABB INC.
Reel/Frame 052300/0077 →
Continuity (3)
Division 15075845 · Mar 21, 2016
Provisional Application 62135469 · Mar 19, 2015
Related Publication 20200358283A1 · Nov 12, 2020