IP Library Granted Patent US 11,304,151
Granted Patent B2
US 11,304,151 · App. 16/863,742 · Granted Apr 12, 2022

System and method for mitigation of interference

Inventors: Devesh Chauhan (Mumbai, IN); Yashesh Buch (Mumbai, IN); Veera Sai Satyanarayana Prasad Marni (Mumbai, IN)
Assignee: JIO PLATFORMS LIMITED
H04W52/283H04W52/143H04W72/1247H04W72/1273
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,304,151
App. No.
16/863,742
Granted
Apr 12, 2022
Kind
B2
Abstract

A system and method for mitigating at least one aggressor cell. The method comprises categorizing at least one user equipment connected to the at least one aggressor cell [ 102 A, 102 B, 102 C, 102 D] based on a position of the at least one user equipment within a coverage area of the at least one aggressor cell [ 102 A, 102 B, 102 C, 102 D]. The at least one user equipment positioned at the center of the coverage area of the at least one aggressor cell [ 102 A, 102 B, 102 C, 102 D] is scheduled for downlink transmission in at least one special subframe. The at least one aggressor cell [ 102 A, 102 B, 102 C, 102 D] reduces transmission power of the at least one special subframe by a pre-determined value and transmits the at least one special subframe to a first set of base stations [ 102 E, 102 F].

Claims (33)

1. A method for mitigating at least one aggressor cell from a plurality of base stations connected to each other over a wireless communication network, said plurality of base stations operating on time division duplexing (TDD), said method comprising:

categorising at least one user equipment connected to the at least one aggressor cell based on a position of the at least one user equipment within a coverage area of the at least one aggressor cell, wherein the at least one user equipment is positioned at one of a centre and an edge of the coverage area of the at least one aggressor cell;

when the at least one user equipment is positioned at the centre of the coverage area, scheduling the at least one user equipment positioned at the centre of the coverage area of the at least one aggressor cell for downlink transmission in at least one special subframe, wherein the at least one special subframe further comprises a downlink pilot time slot, an uplink pilot time slot and a guard period;

when the at least one user equipment is positioned at the edge of the coverage area, scheduling the at least one user equipment positioned at the edge of the coverage area of the at least one aggressor cell in at least one downlink subframe;

reducing transmission power of the at least one special subframe by a pre-determined value; and

transmitting the at least one special subframe from the at least one aggressor cell to a first set of base stations.

2. The method as claimed in claim 1 , wherein at least one aggressor cell transmits at least one subframe, wherein the at least one subframe further comprises the at least one downlink subframe, at least uplink subframe and the at least one special subframe.

3. The method as claimed in claim 1 , wherein categorising the at least one user equipment connected to the at least one aggressor cell is based on at least one of a Channel Quality Index (CQI), a Power Headroom Report (PHR), a Reference Signal Received Power (RSRP), a Downlink Block Error rate (BLER) and an Uplink Block Error Rate (BLER).

4. The method as claimed in claim 1 , wherein the at least one user equipment positioned at the centre of the coverage area of the at least one aggressor cell is scheduled for downlink transmission in the downlink pilot time slot of the at least one special subframe.

5. The method as claimed in claim 4 , further comprising:

prioritizing the at least one user equipment positioned at the edge of the coverage area of the at least one aggressor cell over the at least one user equipment positioned at the centre of the at least one aggressor cell in the at least one downlink subframe; and

transmitting the at least one downlink subframe from the at least one aggressor cell to the first set of base stations.

6. The method as claimed in claim 1 , wherein the transmission power of at least one data resource element of the at least one special subframe is reduced in a range of 1-6 dB.

7. A system for mitigating at least one aggressor cell from a plurality of base stations connected to each other over a wireless communication network, said plurality of base stations operating on time division duplexing (TDD), said system comprising:

at least one aggressor cell configured to:

categorise at least one user equipment connected to the at least one aggressor cell based on a position of the at least one user equipment within a coverage area of the at least one aggressor cell, wherein the at least one user equipment is positioned at one of a centre of the coverage area of the at least one aggressor cell and an edge of the coverage area of the at least one aggressor cell;

when the at least one user equipment is positioned at the centre of the coverage area, schedule the at least one user equipment positioned at the centre of the coverage area of the at least one aggressor cell for downlink transmission in at least one special subframe, wherein the at least one special subframe further comprises of a downlink pilot time slot, an uplink pilot time slot and a guard period;

when the at least one user equipment is positioned at the edge of the coverage area, schedule the at least one user equipment positioned at the edge of the coverage area of the at least one aggressor cell in at least one downlink subframe;

reduce transmission power of the at least one special subframe by a pre-determined value; and

transmit the at least one special subframe from the at least one aggressor cell to a first set of base stations;

a first set of base stations connected to the at least one aggressor cell, said first set of base stations configured to:

receive the at least one special subframe from the at least one aggressor cell.

8. A base station connected to a plurality of other base stations, the base station comprising:

a memory unit;

a processor connected to the said memory unit, said processor configured to:

categorise at least one user equipment connected to the base station based on a position of the at least one user equipment within a coverage area of the base station, wherein the at least one user equipment is positioned at one of a centre of the base station and an edge of the base station;

when the at least one user equipment is positioned at the centre of the coverage area, schedule the at least one user equipment positioned at the centre of the coverage area of the base station for downlink transmission in at least one special subframe, wherein the at least one special subframe further comprises a downlink pilot time slot, an uplink pilot time slot and a guard period;

when the at least one user equipment is positioned at the edge of the coverage area, schedule the at least one user equipment positioned at the edge of a coverage area of at least one aggressor cell in at least one downlink subframe;

reduce transmission power of the at least one special subframe by a pre-determined value; and

a communication unit connected to the processor and the memory unit, said communication unit configured to:

transmit the at least one special subframe to the plurality of said base stations.

9. The base station as claimed in claim 8 , wherein the communication unit is further configured to:

transmit, to the plurality of other base stations, at least one another subframe, wherein the at least one another subframe further comprises at least one downlink subframe, at least uplink subframe and at least one special subframe.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 8, 2021
From: RELIANCE JIO INFOCOMM LIMITED
To: JIO PLATFORMS LIMITED
Reel/Frame 058340/0102 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 1, 2020
From: CHAUHAN, DEVESH; BUCH, YASHESH; MARNI, VEERA SAI SATYANARAYANA PRASAD
To: RELIANCE JIO INFOCOMM LIMITED
Reel/Frame 052552/0037 →
Priority Claims (1)
IN 201921017318 · May 1, 2019 · national
Continuity (1)
Related Publication 20200374812A1 · Nov 26, 2020