US 11,125,914 · App. 16/901,458 · Granted Sep 21, 2021

Three-dimensional ground model generation and automated earthwork target model generation system based on parameter input

Inventors: Seung Soo Lee (Seoul, KR); Min Sung Kang (Incheon, KR); Seung Man Yang (Yongin-si, KR); Woo Yong Jung (Seoul, KR); Jong Won Seo (Gimpo-si, KR)
Assignees: DOOSAN INFRACORE CO., LTD.; IUCF-HYU(INDUSTRY-UNIVERSITY COOPERATION FOUNDATION HANYANG UNIVERSITY)
G01V99/005E01C23/01G06F30/13G06T17/05E01C1/00E21B47/026E21D9/00G06F17/00G06Q50/08G06T19/00
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,125,914
App. No.
16/901,458
Granted
Sep 21, 2021
Kind
B2
Abstract

An earthwork target model generation system comprises a processor. The processor of the earthwork target model generation system stores a three-dimensional topography shape model and drill boring data in the target model generation system, generates a three-dimensional ground model using the three-dimensional topography shape model and the drill boring data, generates three-dimensional normal surface information in consideration of a design condition for each rock quality using the three-dimensional ground model, and sets the design condition.

Claims (38)

1. An earthwork target model generation system comprising a processor, wherein said processor is configured to:

store a three-dimensional topography shape model and drill boring information in the earthwork target model generation system;

generate

a three-dimensional borehole model using the drill boring information,

interpolation data through a linear interpolation in consideration of a depth value for each rock quality of the drill boring information,

a rock layer line through the interpolation data, and

a three-dimensional ground model by offsetting information of the three-dimensional topography shape model to the rock layer line;

receive a design parameter for an altitude or gradient of a design reference boundary corresponding to a starting line from which a normal surface is started and determine the design reference boundary based on the received design parameter;

analyze a transverse change in the rock quality by using the generated three-dimensional ground model and the determined design reference boundary;

analyzes vertical boundary conditions of the rock quality associated with the determined design reference boundary using a gradient value for each rock quality or normal surface design information for each ground condition classified as a condition of generating a berm; and

generate three-dimensional normal surface information having an outermost point line of a certain gradient at a starting point and an ending point of the design reference boundary.

2. The earthwork target model generation system of claim 1 ,

wherein the three-dimensional ground model includes layer information in the form of three-dimensional surface data for the each rock quality.

3. The earthwork target model generation system of claim 1 , wherein the processor is configured to designate a direction in which a normal surface is to be generated for each surface.

4. The earthwork target model generation system of claim 1 ,

wherein the processor is configured to generate a new boundary line from a changing point when the transverse change in the rock quality is recognized.

5. The earthwork target model generation system of claim 1 ,

wherein the processor is configured to

generate the outermost point line of the gradient up to a boundary surface of a vertical condition in which the rock quality is changed and

generate an intersection point between the line of the gradient and a vertical boundary condition surface based on the vertical boundary condition.

6. An earthwork target model generation method, the method performed by an earthwork target model generation system having a processor, the method comprising:

receiving and storing a three-dimensional topography shape model and drill boring information in the earthwork target model generation system;

generating

a three-dimensional borehole model using the drill boring information,

interpolation data through a linear interpolation in consideration of a depth value for each rock quality of the drill boring information,

a rock layer line through the interpolation data, and

a three-dimensional ground model by offsetting information of the three-dimensional topography shape model to the rock layer line;

receiving a design parameter for an altitude or gradient of a design reference boundary corresponding to a starting line from which a normal surface is started and determining the design reference boundary based on the received design parameter;

analyzing a transverse change in the rock quality by using the generated three-dimensional ground model and the determined design reference boundary;

analyzing vertical boundary conditions of the rock quality associated with the determined design reference boundary using a gradient value for each rock quality or normal surface design information for each ground condition classified as a condition of generating a berm; and

generating three-dimensional normal surface information having an outermost point line of a certain gradient at a starting point and an ending point of the design reference boundary.

7. The earthwork target model generation method of claim 6 ,

wherein the three-dimensional ground model includes layer information in the form of three-dimensional surface data for the each rock quality.

8. The earthwork target model generation method of claim 6 , the method further comprising: designating a direction in which a normal surface is to be generated for each surface.

9. The earthwork target model generation method of claim 6 , generating a new boundary line from a changing point when the transverse change in the rock quality is recognized.

10. The earthwork target model generation method of claim 6 , wherein the generating of the normal surface information comprises:

generating the outermost point line of the gradient up to a boundary surface of a vertical condition in which the rock quality is changed; and

generating an intersection point between the line of the gradient and a vertical boundary condition surface based on the vertical boundary condition.

Assignments (3)
CHANGE OF NAME Recorded Dec 4, 2023
From: DOOSAN INFRACORE CO., LTD.
To: HYUNDAI DOOSAN INFRACORE CO., LTD.
Reel/Frame 065761/0942 →
CHANGE OF NAME Recorded Dec 4, 2023
From: HYUNDAI DOOSAN INFRACORE CO., LTD.
To: HD HYUNDAI INFRACORE CO., LTD.
Reel/Frame 065761/0957 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 8, 2020
From: LEE, SEUNG SOO; KANG, MIN SUNG; YANG, SEUNG MAN; JUNG, WOO YONG; SEO, JONG WON
To: DOOSAN INFRACORE CO., LTD.; IUCF-HYU(INDUSTRY-UNIVERSITY COOPERATION FOUNDATION HANYANG UNIVERSITY)
Reel/Frame 054005/0656 →